Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.6 L+₹44,941.81 (14.5%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Jayan V.P L1 | A M YOOSAF L2 |
|---|---|---|---|---|---|
| 1.00urgent rectification work of main canal near ch: 39.200 km | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 31.5 | cum | 199.14 ₹6,272.91 Lowest | 228 ₹7,182 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.5 | cum | 6,132.12 ₹27,594.54 Lowest | 7,020 ₹31,590 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 72 | sqm | 649.01 ₹46,728.72 Lowest | 743 ₹53,496 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 300 | kilogram | 86.9 ₹26,070 Lowest | 99.5 ₹29,850 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 31.5 | cum | 6,465.81 ₹2,03,673.02 Lowest | 7,402 ₹2,33,163 |
Tender Value
₹4.0 L
EMD Value
₹10,037
Closing Date
13 Jan 2026, 11:00 amClosed
ROSHNI S S
CIP Subdivision
GENERAL-CSM -2025-26-Urgent Rectification of main canal near ch 39.200 km General Civil Work
2025_Irrig_824616_1
IRR/IA/TR/2253/2025_5_9_7/1
Open Tender
Civil Works - Canal
Item Rate
270 days
Cheerakuzhy
Please refer tender documents
8 documents required · 8 mandatory
₹885
Yes
₹10,037
Yes
18 Feb 2026
3 Jan 2026
14 Jan 2026
3 Jan 2026
13 Jan 2026
3 Jan 2026
3 Jan 2026 - 13 Jan 2026
urgent rectification work of main canal near ch: 39.200 km
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1382503.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
pa.pdf
Tender Documents • 0.08 MB
fot.pdf
Tender Documents • 0.02 MB
epayment.pdf
Tender Documents • 0.02 MB
ipact.pdf
Tender Documents • 0.01 MB
sbd.pdf
Tender Documents • 3.72 MB
affidavit.pdf
Tender Documents • 0.06 MB
BOQ_1382503.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .