Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹4.2 L+₹15,345 (3.76%)Rejected-Finance 10 SUBASH COLONY DEF LAB ROAD RATANADA JODHPUR 342006 RAJ | JODHPUR | JODHPUR | RAJASTHAN | 342006 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹4.7 L+₹61,325 (15.0%)Rejected-Finance | L3 | Rejected-Finance NOT LOWEST | |
| 4 | Rejected-Technical NOT SPECIFIED IN THE DOCUMENT | - | Rejected-Technical BANNED BY HQ CEJZ, JODHPUR | |
| 5 | Rejected-Technical | - | Rejected-Technical NOT ENLISTED IN PROPER CATEGORIE |
Tender Value
₹6.9 L
EMD Value
₹13,860
Closing Date
9 Nov 2019, 6:00 pmClosed
AGE (I) R AND D JODHPUR
AGE (I) R AND D JODHPUR, Defence Laboratory, Ratanada Palace, Jodhpur- 342011
OUTSOURCING OF DG SETS AT DEFENCE LAB JODHPUR
2019_MES_288833_1
8360/E8
Open Tender
Civil Works
Item Rate
330 days
AGE (I) R AND D JODHPUR
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
AGE (I) R AND D JODHPUR
₹13,860
Yes
20 Jan 2020
11 Oct 2019
11 Nov 2019
11 Oct 2019
9 Nov 2019
21 Oct 2019
12 Oct 2019 - 19 Oct 2019
Amount
Out sourcing, operation and maintenance of DG set 2x750 KVA installed at main power house (round the clock) and 1x 320 KVA installed in high precession workshop (during office hrs from 0900 hrs to 1730 hrs) including all related panels, installed in new technical complex power house at defence lab jodhpur, in three shift (round the clock 24 hours) during failure of electric supply in three shift each shift of 08 Hrs complete all as specified and as directed by Engineer-in-charge. DHPPN will be issued to contractor under Schedule'B' free for filling only. Operator shall have ITI passed (Electricial) and certificate shall be submitted before start of work 08 hours duration and 03 operator shall be deployed for 3 shift in 24 hrs (One Electricial in Each Shift). DG set installation in operation state along with an inventory of various items equipment and electrical fittings will be handed over for proper accounting and up keep at the time of commencement of the contract. The taking over plants on expiry of contract shall be all as per inventory and any damage loss to plants shall be made good by contractor before handing over the plant. In case of any dispute decision of AGE(I) will be final and binding. The checks, inspection shall be carried out as under
(a) Checking and adjusting of valve tappet clearance (b) Checking of Engine lubrication system, fuel system, air system, cooling system, mechanical adjustments/rectification and electrical system. (c) Checking of lube oil filter if necessary (d) Changing/ cleaning of fuel pre & fine filter (e) Contractor should maintain proper printed log sheet as per sample given by the department. (f) contractor should complete service of both DG set interval of five month and also replacing the UNSV parts as oil filter, fuel filter, air filter, changing of coolant and other misc spares for smooth operation of DG set(cost of above spares paid seperately (g) Cleaning of air filter (h) Checking of 'V' belt and adjusting the tension (i) Checking of exhaust turbo charger (j) Checking and cleaning of breather pipes tightness. (k) Checking of alternator terminals and cable lligheners etc (l) Checking of safety controls operation (m) Checking of speed governors and engine shut down for proper functioning (n) Checking of proper functioning of self starter and battery charging (o) Greasing of generator
(vii) Staff shall be wear uniform indicating name of staff and firm name. If staff shall be found without uniform penalty @ 500/- shall be imposed. (viii) Log book of each DG set shall be maintained, shift wise and put up to Engineer-in-Charge and daily checked and signed by JE E/M. Carrying out preventive maintenance, checking as per manufacturer's recommendations and to make proper functioning/ serviceability of u/s RPM meter and hour meter and all engine parameters gauges throughout the CA period and if required repace with new one. Note:- Service of DG set carried out by authorised dealer only (kirloskar only)
Panwar Electricals
SNEH CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .