Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.7 LAdmitted-Finance | -26.00% | ₹20.7 L | L1 | Admitted-Finance |
Tender Value
₹28 L
EMD Value
₹56,000
Closing Date
27 Jun 2026, 6:00 pmClosed
commissioner
nagar nigam kota
nagar nigam kota ward no 78 ram talai maidan new construction geragaj parisar teenshed rcc reting wall work 4 nit 12
2026_DLB_568852_4
NNK/XEN/CIVIL/2026/193-204 nit 12
Open Tender
Civil Works
Percentage
180 days
kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
commissioner
₹56,000
Yes
22 Jul 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
27 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK NAME | |||||
| 1.01 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 9,920 | Kg | 144.5 | ₹14,33,440 |
| 1.02 | Supply , Installation, Testing and Comissioning of site fabricated ducting made from GI sheet metal conforming to IS:277 with a zinc coating grade not less than 120 GSM (both side inclusive) & fabricated as per IS:655 and as per approved drawings & designs including the cost of hangers, supports, angle, expansion fasteners , closed cell neoprene gasket T&P etc. as required of following thickness. Test Certificate for Galavanizing with lot no. to be submitted. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR. 1.00mm | 594 | Sqm | 1,421 | ₹8,44,074 |
| 1.03 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 1,200 | Sqm | 114 | ₹1,36,800 |
| 1.04 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. | 2,500 | Kg | 83.3 | ₹2,08,250 |
| 1.05 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 210 | Sqm | 367 | ₹77,070 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 15.75 | Cum | 6,340 | ₹99,855 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.10 MB
1204.pdf
Tender Documents • 3.15 MB
BOQ_1012119.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .