The Chief Engineer/Electrical/NCTPP-III
Athipattu, Chennai-600120
Construction of compound wall with RR masonry on south side of NCTPP-III near Clive building in the collapsed portion for a length of 30RM/5m Height with pile foundation
2024_EB_465732_1
CE/E/SE/Civil/NCTPP Stage III/03/2024-25
Open Tender
Civil works
Works
90 days
NCTPP Stage-III
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹27,000
Yes
12 Feb 2025
24 Jul 2024
8 Aug 2024
24 Jul 2024
7 Aug 2024
24 Jul 2024
24 Jul 2024 - 6 Aug 2024
Amount
Clearing light jungle and disposing off to a place at least 1 km away from the site as directed by the Engineer in charge including cost of all labour charges, lead, lift, Tool & plants etc, complete.
Earthwork excavation and deposting on with initial lead of 10 m and initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation
Boring and concreting of vertical reinforcement concrete piles 600 mm dia upto required depth from ground level by Direct mud circulation method with bentonite powder slurry, M 35 grade of concrete using 12-20 MM machine crushed metal and minimum cement content of 400 kg/m3 and maximum water cement ratio of 0.38 with the admixture of conplast SP 337 @ 300ml per bag of cement as per specification including cost of all materials, labours lead, lift etc. complete (but excluding cost of reinforcement)
Chipping and dismantling of weak concrete from GL to cut off level of pile concrete to meet sound concrete and clearing the dismantled concrete from pile location, etc including cost of all labour charges, tools, lead, lift etc. completed.
Plain cement concrete 1:2:4 using 20mm size graded hard broken granite stone below Footing, RR masonry wall, grade beam, etc including cost of all materials, labour, lead, lift, curing, etc complete.
Providing R.C.C. of M35 Grade of concrete using 12mm to 20mm graded Hard Broken Granite metal with minimum cement content of 400kg/m³ and maximum water-cement ratio of 0.38 as directed by the Engineer in charge including cost of all materials, shuttering and centering, labour charges, vibrating charges, curing , all T&P, lead, lift etc., complete but excluding cost of steel reinforcement - Pile Cap
Providing R.C.C. of M35 Grade of Concrete using 12mm to 20mm graded HBG metal with minimum cement content of 400kg/m³ and maximum water-cement ratio of 0.38 as directed by the Engineer in charge including cost of all materials, shuttering and centering, labour charges, vibrating charges, curing , all T&P, lead, lift etc., complete but excluding cost of steel reinforcement - Wall beam/ Tie beam
Supplying , cutting, bending, binding and placing in position of reinforcement rod of Corrosion Resistant High strength deformed TMT Bars having characteristic strength of Fe 500 N/mm² of branded make or equivalent in all RCC work at all level and elevation including cost of all material, lead, lift and binding wire (18 G)etc., complete as directed by the Engineer at site.
Random Rubble masonry wall in Cement Mortar 1:5 including cost of all materials, lead, lift, scaffolding, etc., complete as per instruction of Engineer in charge- Wall upto 4.5m height
Random Rubble wall masonry in Cement Mortar 1:5 including cost of all materials, lead, lift, scaffolding, etc., complete as per instruction of Engineer in charge - Wall above 4.5 height
Flush pointing with Cement Mortar 1:3 on both sides of Random Rubble masonry wall including cost of all materials, lead, lift, scaffolding, etc., complete as per instruction of Engineer in Charge
Provision of coping with PCC 1:2:4 over the entire compound wall at top portion and also for fixing Y Post includes cost of all materials labour, tools and plants, formwork, shuttering, lead, lift, etc., complete
Supplying, fabrication and fixing Y post of height 1.4 m using ISA 40x40x5mm @ 4 m C/C with grooves for holding the barbed wire and as per instruction of Engineer in charge includes cost of all materials, painting (one coat primer and two coat enamel painting), labour, lead lift etc. complete.
Supplyig and fixing of barbed wire (Two Ply and Four Pronged) Galvanized fencing of size gauge 10 gauge in the grooves of Y POST in 11 strands HDG High Tensile Steel wire as per insruction of Engineer in charge includes cost of all materials, labour, lead lift etc. complete.
Dismantling of existing RCC portion including cost of all materials, disposal, lead, labour, lift etc, complete as per instruction of Engineer in Charge
Dismantling of existing RR masonry including cost of all materials, disposal, lead, labour, lift etc, complete as per instruction of Engineer in Charge
Dewatering with 10 HP pump and engine includes cost of hire charge, transport, labour, lead, lift etc., as per instruction of Engineer in Charge.
RADHA ENGINEERING CONSTRUCTION (BID ID -1103160)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .