| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹36.0 LAccepted-Finance | ₹36.0 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹36.0 L+₹4,875.16 (0.14%)Rejected-Finance | ₹36.0 L+₹4,875.16 (0.14%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹40.4 L+₹4.4 L (12.3%)Rejected-Finance | ₹40.4 L+₹4.4 L (12.3%) | L-3 | Rejected-Finance L-3 |
Tender Value
₹48.8 L
EMD Value
₹98,000
Closing Date
17 Aug 2026, 5:00 pmClosed
General Manager
Main administrative building, Sector-6, Noida
M/o Buidling (Annual Maintenance of Building Repair and Maintenance work of Hosiery Complex, Phase-II market complex, village Yakubpur, Bhooda, Nagla Charandas, Kakrala, Nayagaon, Illabans Community Center under Work Circle-7 area) Noida
2026_NOIDA_1174089_1
24/GM/SM/WC-7/ET/2026-27
Open Tender
Civil Works
Fixed-rate
365 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,124
NOIDA
₹98,000
17 Sept 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
17 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exccding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. : All kinds of soil. (C.R.) The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | 54.75 | Cum | 144.93 | ₹7,934.92 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge | 47.75 | Cum | 136 | ₹6,494 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth : consolidating each deposited layer by ramming and watering lead up to 50 m and lift up to 1.5 m. (CR) | 51.25 | Cum | 93 | ₹4,766.25 |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 50 | Sqm | 20.47 | ₹1,023.5 |
| 5 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 3 | Cum | 923.42 | ₹2,770.26 |
| 6 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 4.75 | Cum | 1,347.16 | ₹6,399.01 |
| 7 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 2.75 | Cum | 779.76 | ₹2,144.34 |
| 8 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured) : From brick work in cement mortar. | 500 | 1000 No | 2,569.38 | ₹12,84,690 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth 1:4:8 ( 1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 8 | Cum | 5,746.88 | ₹45,975.04 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). | 36.5 | Cum | 6,753.45 | ₹2,46,500.93 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_2206275.xls
BOQ • 0.41 MB
Capability.xls
Additional Documents • 0.04 MB
TD.pdf
Tender Documents • 13.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .