Tender Value
₹24.6 L
EMD Value
₹24,580
Closing Date
30 Sept 2026, 6:00 pmClosed
Taluka Panchayat Kacheri Bavla
DISTRICT RURAL DEVELOPMENT AGENCY AHMEDABAD SWACHH BHARAT MISSION GRAMIN
345190
2026-27
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹1,500
NREGA AHM BAVLA TDO
₹24,580
16 Sept 2026
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. ThequantitiesgivenintheBillofQuantitiesareestimatedandprovisional,and are given
to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and
verified by the Engineer and valued at the rates and prices tendered in the priced
Bill of Quantities, where applicable, and otherwise at such rates and pricesas the
Engineer may fix within the terms of the Contract.
3. TheratesandpricestenderedinthepricedBillofQuantitiesshall,exceptinso farasitis
otherwise providedundertheContract,includeallconstructional
plant,layout,supervision,materials,erection,maintenance,insurance,profit, taxes and
duties, together with allgeneralrisks, liabilities and obligations set outor implied in
4. Theratesandpricesshallbequotedentirelyin IndianCurrency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failedto
enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of theContract shall be includedin
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for
the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeatedorsummarizedin the Bill of Quantities. References to the relevant sections
of the contract documentation shall be made before entering rates orprices against
each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specificationforRoadandBridgeworks.Forbuildingworksspecificationsforbuilding
are to be followed.
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerrorspursuantto
Clause29oftheInstructionsto Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting,ortheuseofmetalwedgesandsledgehammers,ortheuseof compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of
at least 150 kw with a single rear mounted heavy duty ripper.
BILLOFQUANTITIES
(A) PercentageRateTender(UptoINR50Cr.)
TechnicalBid documents
TechnicalBid documents
TechnicalBid documents
TechnicalBid documents
TechnicalBid documents
TechnicalBid documents
TechnicalBid documents
TechnicalBid documents
TechnicalBid documents
As per upper all 3 village estimate total project cost as per
Sr. No. Village Name Final Amount
TOTAL PROJECT COST Rs.
TechnicalBid documents
I/Weam/arewillingtocarryoutthe work at ........................... %above/belowpercent(Should
be written in figures and words) of the estimated rate mentionedabove. Amount of my /our
tender works out as under.
Estimatedamountputtotender Estimatedamountputtotender
Deduct………%below Add ........ %Above
Inwords Inwords
1 TheContractorshallexhibitaboardwithdetailedspecificationanddetailsofwork as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 ThelaborCasswillbedeductedasperprevailingrulesi.e.1%of the workdone.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsofbills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017asstatedin
S.O.R. thereforeinR.C.C.items wherethereisa changeasperactual mix designthecost
ofdifferenceofcementconsumptionhavebeendeductedfromtherateoforiginalitem at the
rate of input rate mentioned in all the tender.
TechnicalBid documents
TechnicalBid documents
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E TENDER ABR SBM-G BAVLA- 3 GP.pdf
Price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .