Loading…
Loading…
Tender Value
₹11.8 L
EMD Value
₹23,560
Closing Date
13 Jun 2026, 6:00 pm4d left
EE PWD DIV. ITAWA
EE PWD DIV. ITAWA
Repair work under Risk and Cost on the rural road Chhatrapura to Hanumanpura to Ferrera village under SRF scheme under defect rectification period
2026_CEPWD_565949_3
EE PWD DIV. ITAWA NITNO-05/2026-27
Open Tender
Civil Works
30 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV. ITAWA
₹23,560
Yes
8 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of non Thorney Jungle | 1 | hectare | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Filling pot holes and patch repair with Wet Mix Macadam specifications including premixing the Material with water to OMC in mechanical mixer (Pug mill) as per design mix, carriage of mixed Material by tipper to site laying in uniform layers, with motor grader/F.E. loader/Paver Finisher, in sub-base/base course on a well prepared under-base and compacting with Vibratory Roller to achieve the desired density including lighting, guarding, barricading and maintenance of Driversion etc. (MoRTH specification : Clause 406). with all lead & lift | - | Sqm | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Filling pot-holes and patch repairs with open-graded premix surfacing, 20mm thick compacted with bitumen binder VG10 @14.60 kg/10 sqm and aggregate in Hot Mix Plant, transporting the mixed Material with tipper and laying manually to the required level and grade, rolling with power roller, 8-10 tonne, removal of all failed Material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot-holes with hot bituminous Material as per Clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of tack coat and including cost of seal coat type B with lead for mix of Material 1 km. (MoRTH specification : Clause 3004.2) | - | Sqm | - | - | BI01010001010000000000000515BI0100001113 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.28 MB
Tendernotice_2.pdf
PDF • 1.39 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_1007012.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid