Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 143 MALL ROAD MALL APPTT NEW DELHI DELHI 110009 | NORTH WEST DELHI | DELHI | 110009 | Admitted-Finance |
| 2 | Rejected-Technical 31 2 ADAKAMARANAHALLI MAKALI POST VILLAGE DASANAPURA HOBLI BANGALORE URBAN BANGALORE RURAL KARNATAKA 562123 | BENGALURU RURAL | KARNATAKA | 562123 | Rejected-Technical AS PER EVALUATION SHEET |
| 3 | Rejected-Technical 1014 105 KINGSTON TOWER OPPOSITE OLD VIVA COLLEGE ABOVE DOMINOS PALGHAR MAHARASHTRA 401303 | PALGHAR | PALGHAR | MAHARASHTRA | 401303 | Rejected-Technical as per elvaluation sheet |
| 4 | Rejected-Technical | Rejected-Technical AS PER EVALUATION SHEET |
Tender Value
₹22.0 L
EMD Value
₹44,080
Closing Date
30 Jan 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMMISSIONER
NAGAR PARISHAD SAWAI MADHOPUR
supply installation and maintenance work of OCEMS
2023_DLB_315100_1
18060
Open Tender
Miscellaneous Services
Item Rate
60 days
SAWAI MADHOPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
FEE SUBMIT THROUGH NEFT
₹44,080
Yes
NAGAR PARISHAD SAWAI MADHOPUR
3 Mar 2023
16 Jan 2023
31 Jan 2023
16 Jan 2023
30 Jan 2023
16 Jan 2023
23 Jan 2023
Amount
Supply & Installation of On Line BOD/COD/TSS/PH in-situ based Analyzer with panel for S.T.P effluent Measurement items UV-VIS Spectrometry Double beam with entire spectrum scanning 200 – 720 nm / 190- 750nm wave lengths along with 256 unique pixel diode. •MOC of BOD/COD/TSS sensor -Titanium 3.7 / SS316L or better •Cleaning facility.-ultrasonic cleaning or Air pressure Cleaning •Accuracy of BOD/COD/TSS sensor- +/-3% of the measured value • Light Source: Xenon Flash Lamp Following measuring ranges are required :• COD: 0-700 mg/lBOD: 0-400 mg/l TSS: 0-600 mg/l range - 0 to 14 •MOC of ph sensor-Stainless Steel 316 or better •Ph Accuracy +/-0.2% •protection type : IP 68 for both the Sensor and Cable (Cable lengthas per site requirement) •Controller/Display- Housing Material – Non corrosive e.g.Acrylonitrile-Styrene- Acryloester polymer or better •Protection Rating IP 67 Controller/display cabin box should be IP66 Grade with lock & key SS304 Grade MOC
Ultrasonic open channel flow meter with shall comprise of Flow sensor / transducer, flow transmitter, digital level indicator / remote indicator, control unit • Operating Temperature: 0 to 50°C. • Safety: Explosion Proof or Intrinsically Safe. • Measuring Principal: Ultrasonic. • Communication Protocol: Open Protocol like MODBUS, PROFIBUS, HART, etc. • Analog Output: Isolated 4-20mA. • Relay Contacts: Minimum of 3 SPDT contacts. • Accuracy: ± 0.25% of measured value or better. •Output-. 4 - 20 mA •Protection a.) Sensor: IP-68. b.) Transmitter / Controller: IP-66 (NEMA 4X). • Display: LCD with LED backlighting 130.
1kva UPS • Capacity -1000VA/600W • Input Voltage Range- 140 V ~ 300 V AC Frequency - 50 Hz ± 10% • Operating Temperature- 0°C-40°C; • Charging Time -6~8 Hours recover to 90% capacity Battery Rating -SMF 12V /7AHx2 Batteries. • Output Voltage -230 V AC Nominal Transfer Time- Typical 4~8ms • Type- Sealed Maintenance Free
Comprehensive Operation & Maintenance Cost for whole system for 1st year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 2nd year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 3rd year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 4th year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Comprehensive Operation & Maintenance Cost for whole system for 5th year including data transmission to CPCB, RSPCB & MCB website, four service visits, two times Calibration of system in a year, repairable Cost, replacement cost, Consumables etc.
Installation Charges
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .