Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52,642Accepted-Finance | ₹52,642 | L1 | Accepted-Finance Accepted Vide Resolution No. 144- dtd. 30/05/26 of KOCHI MUNICIPAL CORPORATION |
| 2 | L2₹43.1 L+₹42.6 L (8090.5%)Rejected-Finance | ₹43.1 L+₹42.6 L (8090.5%) | L2 | Rejected-Finance AS PER THE LETTER |
| 3 | Rejected-Technical | - | - | Rejected-Technical L1 |
| Sl No | Description | Qty | Unit | TVM JILLA JANAKEEYA LABOUR CONTRACT CO OP SOCIETY Ltd L2 | R P UDAYAKUMAR L3 | SAFEER SADIQUE L1 |
|---|---|---|---|---|---|---|
| 1.00Dredging | ||||||
| 1.00 | OD409681/2025-2026::Dredging and deepening harbour basin in all classes of soil using any type of dredgersuch as grab dredger, hopper bottom type dredger, cutter suction type dredger /any type
of dredgingequipment and removing sand, clay,silt, debris, piece of nets, other waste or mixture or combination of twoor more including removing all obstacles such as small rocks scattered granite, wood pieces, piece of netetc and dumping the spoil at location already pointed out by the departmental officers with a lead up to aradial distance of 2000 m and protected by reclamation bund using plastic woven empty cement bag filling itwith sea sand/ dredged spoil, stitching with nylon yarn and making it suitable for conveying, dumping andplacing the bags in required lines, shape and levels to form reclamation bund, including hire charges ofdredger , all tools and plants and accessories ,fuel charges, idling and mobilization charges, demobilizationcharges, and all type of Survey works, providing and shifting the pipe lines all labour charges, incidentalcharges etc. complete to an average depth of (-) 3.50m CD with a tolerance of +/- 20 cm and cost of formationof reclamation bund including labour charges for filling and stitching bag and conveying and placing in therequired lines, shape and levels etc. complete as per the direction of departmental officers at site | 8,980 | cum | 290.29 ₹26,06,804.2 | 304.12 ₹27,30,997.6 | 237.76 ₹21,35,084.8 Lowest |
| 1.00 | OD409680/2025-2026:Engaging mancoolies | 10 | each | 1,183.73 ₹11,837.3 | 1,240.1 ₹12,401 | 969.53 ₹9,695.3 Lowest |
| 1.00 | OD409682/2025-2026:Disposal of Excavated unserviceable silt, r waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 20km initial lead, for all leads including all lifts involved | 5,388 | cum | 491.01 ₹26,45,561.88 | 514.39 ₹27,71,533.32 | 402.16 ₹21,66,838.08 Lowest |
Tender Value
₹50.1 L
EMD Value
₹50,000
Closing Date
5 Feb 2026, 2:00 pmClosed
SANUKUTTAN T.P.
Office of the Assistant Executive Engineer, Central Zone, Kochi Municipal Corporation,
MOE4/KSMART/754894/2026, Desilting of TP Canal Thevara Mouth Div-51 and 52 -General civil work Tender
2026_LSGD_831312_23
MOE2-53845/2025
Open Tender
Civil Works - Others
Item Rate
330 days
ERNAKULAM
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
7 Jul 2026
29 Jan 2026
6 Feb 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
Dredging
OD409681/2025-2026::Dredging and deepening harbour basin in all classes of soil using any type of dredgersuch as grab dredger, hopper bottom type dredger, cutter suction type dredger /any type of dredgingequipment and removing sand, clay,silt, debris, piece of nets, other waste or mixture or combination of twoor more including removing all obstacles such as small rocks scattered granite, wood pieces, piece of netetc and dumping the spoil at location already pointed out by the departmental officers with a lead up to aradial distance of 2000 m and protected by reclamation bund using plastic woven empty cement bag filling itwith sea sand/ dredged spoil, stitching with nylon yarn and making it suitable for conveying, dumping andplacing the bags in required lines, shape and levels to form reclamation bund, including hire charges ofdredger , all tools and plants and accessories ,fuel charges, idling and mobilization charges, demobilizationcharges, and all type of Survey works, providing and shifting the pipe lines all labour charges, incidentalcharges etc. complete to an average depth of (-) 3.50m CD with a tolerance of +/- 20 cm and cost of formationof reclamation bund including labour charges for filling and stitching bag and conveying and placing in therequired lines, shape and levels etc. complete as per the direction of departmental officers at site
OD409680/2025-2026:Engaging mancoolies
OD409682/2025-2026:Disposal of Excavated unserviceable silt, r waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 20km initial lead, for all leads including all lifts involved
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
FOT.pdf
Tender Documents • 0.25 MB
BOQ_1397973.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 0.98 MB
PG.pdf
Tender Documents • 0.26 MB
AFFIDAVIT.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .