Loading…
Loading…
Tender Value
₹25.1 L
EMD Value
₹26,000
Closing Date
15 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer
Construction Of CCTV Control Room at Karjan Dam ,Ta: Nandod, Dis:Narmada
299574
2 of 2026-27
Open
Civil - All
Narmada
9 documents required · 9 mandatory
₹1,500
EXECUTIVE ENGINEER IRRIGATION PROJECT DIVISION NO.4, RAJPIPLA
₹26,000
1 May 2026
1 May 2026
1 May 2026
15 May 2026
1 May 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for
the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILLOFQUANTITIES
(A) PercentageRateTender(Up toINR50Cr.)
Name of Work: - Construction Of CCTV Control Room at Karjan Dam ,Ta: Nadod,
Item DescriptionofItem(withbrief Quantity Unit RateIn Amount
No specification and reference to book of figures
specifications)
1 Removing dry or oil bound distemper/enamel by 389.691 SQ.Mt 11.817
washing and scraping and sand papering the wall
surface smooth including necessary repairs the
scratches complete
2 Dismentaling the existing structure including 4.91 cu.Mt 952.51
removing and stacking the dismentelled
materials as and where directed. (A) R.C.C.
3 Providing and laying Plain/Reinforced cement 1.64 Cu.mt 4891.30
concrete of cement,sand and metal (above 12mm
& upto 20 mm size) in following proportion laid
insitu including centering,
shuttering,temping,smooth finishing,curing
etc.complete a sdirected for all leads and lifts
(Manually With Conventional Mixer) (iv)
4 Filling in plinth with sand under floors including 24.29 Cu.mt 489.2844
watering ramming, consolidating and dressing
5 Brick work using common burnt clay building 2.51 Cu.mt
bricks having crushing strength not less than
kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:6 (1- Cement : 6 -fine sand)(C) Fly Ash
Bricks (upto 10 ton).
6 Brick work using common burnt clay building 15.12 Cu.mt 5419.25
bricks having crushing strength not less than
kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:6 (1- Cement : 6 -fine sand)(C) Fly Ash
Bricks (upto 10 ton) ( Extra for brick work in
superstructure above plinth level
upto floor two level(C) Fly Ash Bricks)
7 Providing and laying Plain/Reinforced cement 2.5116 Cu.mt 5330.00
concrete of cement, sand and metal (above
12mm & upto 20mm size) in following
proportion laid in situ including Centering,
shuttering, temping,smooth finishing, curing etc.
complete as directed for all leads and lifts
8 Providing and laying controlled cement 8.0955 Cu.m 6293.59
concrete M.250 and curing complete including
the cost of formwork and reinforcement for
reinforced concrete work in (C)
Slabs,landing,shelves,Balconies, Lintels,
Beams, Girders and Cantilever upto floor two
level. (upto 10 ton) For Ground Floor
9 Drilling 25mm dia holes at distance as specified 23.40 rmt 252.00
and depth upto 3.0mt for check dam foundation
& fixing anchor bars of specified diameter with
cement grout incl cleaning holes as directed
etc.(excluding cost of bars)
10 Providing TMT Bar FE 415 reinforcement for 874.88 kg 68.3265
R.C.C. work including bending, binding and
placing in position complete upto floor two level
11 Providing 15mm thick cement plaster in single 362.66 Sq.mt 201.79
coat on Rough (Similar)side of single or half
brick walls for interior plastering upto floor two
level and finished even and smooth in (i) Cement
mortar 1:3 (1-cement:3-sand)
12 Applying two coats of putty & two coats of 362.66 Sq.mt 40.5919
primer of approved brand and manufacture on
new wall surface to give an even shade including
thoroughly brushing the surface free from
mortar dropping and other foreign matter and
sand papered smooth.
13 Wall painting (two coats) with plastic emulsion 119.41 Sq.mt 84.81
paint of approved brand and manufacture on
undecorated wall surface to give an even shade
including throughly brushing the surface free
from mortar droppings and other foreign matter
and sand papered smooth.
14 Finishing wall with weather proof exterior 268.00 Sq.mt 122.14
emulsion paint on wall surface (two coats) to
give an required shape even shade after
thoroughly brushing the surface to remove all
dirt, and remains of loose powdered
materials.etc complete
15 P & L 24" x 24" vitrified 8 mm thick tile flooring 55.00 Sq.mt 1521.95
over 20 mm (average) base of cement mortar 1:6
( 1 cement: 6 coarse sand) on new surface or
fixing on existing flooring by adhesive material
including dismentaling of existing flooring and
jointed with color cement slurry including
finised with flush pointing & cleaning the
surface etc. complete for light shade.
16 Providing and fixing Machine Cut, polished 25.733 Sq.mt 3413.62
granite stone slab 20 mm to 25 mm th for vertical
jambs, Top and bottom sill stair landing etc.
And cladding as per the design and laid on
mm th. cement mortar 1:3 (1 cement : 3 Coarse
sand) jointed with grey cement slurry including
rubbing and polishing, finishing etc. complete.
17 Providing and fixing M.S. grills of required 84.00 kgs 110.3122
pattern to wooden frames of windows etc. with
M.S. flats at required spacings and frame
alround, square or round bars with round headed
bolts and nuts or by screws (A) Plain Grill.
18 Painting two coats (excluding priming coat) on 4.80 Sq.mt 94.39
new steel and other metal surface with enamel
paint, brushing, interior to give an even shade
including cleaning the surface an even shade
including cleanicn the surface of all dirt, dust
and other foreign matter.
19 Providing and fixing extruded aluminum 2.40 Sq.mt 1591.87
window having extruded aluminum Colour
Powder Coated section frame main outer size
Kg/mt,horizontal Four track member size
Kg/mt,vertical member of size 122.20mm x
31.75mm x 1.50mm ,@ Wt. 1.398 Kg/mt with
sliding shutters of horizontal member size 40mm
x 18mm x 1.29mm @ wt.of 0.456Kg/mt,vertical
member of size 40mm x 18mm x 1.29mm @
wt.of 0.456Kg/mt,@ with 5 mm thick
transparent bronze colour tinted float glass with
powder coated aluminum fittings and fixtures
and transparent silicon sealant glass fixing to
per details etc complete for window
20 Providing and fixing flush door both sides 2.52 Sq.mt 2261.03
laminated and I.T.W. beading all around by
using I.T.W. frame 120 m.m. x 80m.m.. shutter
fabricated from 35 mm thick solid core
malemine faced three layered pre laminated flat
pressed wood based exterior grade bonded
BWP/BWR synthetic resin having stamped IS
12823 grade I type II including three coats of
lacquer polishing to exposed wooden surfaces
and Stainless steel decorative type designs
fixtures / fastening etc.including I.T.W.
triangular batten patti of size
30m.m.x30m.m.etc. as per architectural detailed
drawing and as directed by engineer in charge.
21 Providing and laying broken chine mosaic 55.25 Sq.mt 779.70
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid over
cement mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out upto surface
using white cement including rounding off
junctions and extending them upto 15 cm along
the wall,clearing with water and oxalic acid etc.
22 Providing and fixing of PVC Wooden texture 8 302.339 Sq.mt 280.00
mm PVC ceiling with framing, aluminium
channel, ss screws etc. and finished by including
grooves as shown in drawing complete with all
material, labour with all lead, lift and
transport.Item to be approved by engineer
incharge or consulting engineer.
23 Providing and erecting Inverter based approved 2.00 job 63765.34
make split air-conditioning unit consisting of
condensing unit with variable speed fan motor,
inverter type hermetically sealed rotary
compressor with accessories etc. duly connected
separately erected evaporating unit and blower
motor with its accessories by means of extra
supplied proper insulated copper tubing,drain
PVC pipes suitable for ( cost includes Eco
Friendly green gas charging and 15A plug top &
Remote Control & MS Stand) with necessary
core cutting.(2)For ISEER Range
(KWH/KWH)(4.0 to 4.49) (C) for 1.7 to 2 ton
24 Providing and fixing Safe Pro 50 Litre 2.00 No 23500.00
Mechanical Foam Type Fire Extinguisher
25 Control room Calcium Sulphate Type, For 83.143 Nos 3350.00
Office Flooring Tiles per Sq feet
26 Jack 300MM for Tiles Base in SS Material. 100.00 No 760.00
27 Stringer 300.00 No 750.00
29 150MM 40MM SS Cable tray for Fiber Cable 100.00 Rmt 870.00
and CAT 6 cable and Power cable laying with
Nutbolt and coupler.
30 Saftey Door with Framing with 6 Feet Hight and 1.00 No 62000.00
31 Providing & erecting approved make Fingerprint 1.00 No 23145.16
and card based Premium Door Controller with
LCD and Keypad having following features.
(A) Optical Fingerprint and Card based Reader
(Card personality Module not included]
(B) Dot-Matrix LCD and Touch sense Keypad
(C) Built-In interfaces like door lock, door sense,
exit Reader, Exit switch, Ethernet RS485, Aux
Input & Aux Output Port
(D) 5000 Events, Access Control, Time
Attendance, Tamper Detection
(E) 4 LEDS and Buzzer
32 Tiles Installation charges with cutting fixing 302.339 Sqft 1350.00
with stringer and Tighting on nutbolt.
33 cable Tray Installation Charges 100.00 Rmt 880.00
34 I-7 Desktop workstation with 32 GB Ram ,2 TB 1.00 No 120000.0
NVME SSD with 22inch Monitor with
Keyboard Mouse with 3 years onsite warranty
35 55 Inch LED Smart Tv for Control room. 2.00 no 65000.00
Add 5% Electric Charge
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(A) For Item Rate Tender (For above INR 50 Cr.):
Quantity Unit Rate Amount
Item Description of Item (with brief In In
No specification and reference to figures Words
specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate mentioned in all the tender.
Signature of Contractor. Deputy Executive Engineer Executive Engineer
Irrigation Pro. Sub Division No.27 Irrigation Project Division No.4
Rajpipla Rajpipl
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP cctv.pdf
boq cctv room.pdf
NIT CCtv.pdf
Download all tender documents and submit your bid