Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹65,173.70 (0.46%)Admitted-Finance | ₹1.4 Cr+₹65,173.70 (0.46%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹22.5 L (16.0%)Admitted-Finance | ₹1.6 Cr+₹22.5 L (16.0%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹33.1 L (23.5%)Admitted-Finance KALIJHORA KALIJHORA BAZAR KALIJHORA BAZAR KALIJHORA BAZAR DARJEELING WEST BENGAL 734008 | DARJEELING | WEST BENGAL | 734008 | ₹1.7 Cr+₹33.1 L (23.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.8 Cr+₹35.0 L (24.9%)Admitted-Finance NOT AVAILABLE | NA | NA | 121004 | ₹1.8 Cr+₹35.0 L (24.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Zakir Hussain L1 | Rakesh Sen L7 | MNBN Enterprises L5 | Ankit Kumar L2 | GURBACHAN SING L3 | M/S VIKAS CONSTRUCTION CO. L6 | Royal Construction Company L4 | Thakur Narender Co Pvt Ltd L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water , blasting soft/ hard rock or chiselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of beds to correct grade i/c shoring/strutting, planking,timbering & dewatering wherever required, stacking the useable & unuseable material/soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in layer by ramming & watering & then disposing of all surplus excavated soil/unuseable material as directed with in all leads & lifts complete in all respect as per directions of engineer-in-charge. | 3,657 | Cum. | 300 ₹10,97,100 Lowest | 750 ₹27,42,750 | 556 ₹20,33,292 | 400 ₹14,62,800 | 600 ₹21,94,200 | 440 ₹16,09,080 | 375 ₹13,71,375 | 650 ₹23,77,050 |
| 2.00 | Excavation in foundation trenches etc. in all kinds of earth work such as spade work, pick work, jumper work saturated /un saturated soil blasting work and chiseling/wedging out of rocks where blasting work prohibited up to all depth and lifts including pumping and bailing out water where ever required stacking the excavated earth not more than 3mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into the plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated material within all leads and lifts, useful material available from excavation to be properly stacked and handed over free of cost to the department as per direction of the Engineer-in Charge. | 146.25 | Cum. | 290 ₹42,412.5 Lowest | 650 ₹95,062.5 | 456 ₹66,690 | 500 ₹73,125 | 600 ₹87,750 | 495 ₹72,393.75 | 450 ₹65,812.5 | 550 ₹80,437.5 |
| 3.00 | Laying, jointing and testing in trenches ISI marked centrifugally cast (spun) Ductile iron pressure pipes for water, gas and sewage with socket and spigot ends conforming to IS-8329-2000 and latest with up to date ammendments in length of 5 to 6.00 mtrs. class K-7 suitable for push on joint (rubber gastek D-jointing) including short pieces, collars with cement mortar lining in side the pipes with outside zinc coating as per IS-8329-2000 complete in all respect within all leads & lifts & to the entire satisfaction of the Engineer-in-charge. (Earth work in trenches to be measured and paid for separately).200 mm dia | 900 | Rmt | 500 ₹4,50,000 | 630 ₹5,67,000 | 496 ₹4,46,400 | 400 ₹3,60,000 | 500 ₹4,50,000 | 150 ₹1,35,000 Lowest | 550 ₹4,95,000 | 450 ₹4,05,000 |
| 3.01 | 150 mm dia | 3,500 | Rmt | 250 ₹8,75,000 | 260 ₹9,10,000 | 306 ₹10,71,000 | 170 ₹5,95,000 | 210 ₹7,35,000 | 141 ₹4,93,500 Lowest | 385 ₹13,47,500 | 400 ₹14,00,000 |
| 4.00 | Providing and laying cement concrete 1:6:12 (1cement: 6sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth | 45 | Cum. | 4,500 ₹2,02,500 Lowest | 6,300 ₹2,83,500 | 6,396 ₹2,87,820 | 5,600 ₹2,52,000 | 6,500 ₹2,92,500 | 6,795 ₹3,05,775 | 5,450 ₹2,45,250 | 6,500 ₹2,92,500 |
| 5.00 | Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded crushed stone aggregate 40mm nominal size )and curing complete excluding cost of form work in foundation and plinth with in all leads & lifts as per the entire satisfaction & direction of Engineer - in - charge. | 79.39 | Cum. | 6,000 ₹4,76,340 Lowest | 7,500 ₹5,95,425 | 7,396 ₹5,87,168.44 | 6,500 ₹5,16,035 | 7,600 ₹6,03,364 | 6,895 ₹5,47,394.05 | 6,400 ₹5,08,096 | 8,000 ₹6,35,120 |
| 6.00 | Providing and laying cement concrete 1:2:4 ( 1 cement : 2 Sand : 4 graded stone aggregate , 20 mm nominal size ) and curing complete excluding cost of form work and reinforcement in Walls ( any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | 443.44 | Cum. | 7,000 ₹31,04,080 Lowest | 9,300 ₹41,23,992 | 8,486 ₹37,63,031.84 | 7,500 ₹33,25,800 | 9,500 ₹42,12,680 | 7,995 ₹35,45,302.8 | 8,550 ₹37,91,412 | 9,900 ₹43,90,056 |
| 7.00 | Providing and laying cement concrete 1:2:4 ( 1 cement :2 sand :4 aggregate 20 mmm nominal size ) & curing complete etc, cost of form work & reinforcement for RCC work in Foundation and plinth at all lead lead and lifts & with entire satisfaction of Engineer-in-charge | 45 | Cum. | 7,000 ₹3,15,000 Lowest | 9,200 ₹4,14,000 | 8,386 ₹3,77,370 | 7,800 ₹3,51,000 | 9,200 ₹4,14,000 | 7,995 ₹3,59,775 | 8,400 ₹3,78,000 | 9,500 ₹4,27,500 |
| 8.00 | Providing and laying cement concrete 1:1.5 :3 ( 1cement: 1 1/2 sand: 3graded stone aggregate 20 mm nominal size )and curing complete excluding the cost of form work and reinforcement in:- I) Foundation and plinth. | 36.38 | Cum. | 8,500 ₹3,09,230 | 9,800 ₹3,56,524 | 9,176 ₹3,33,822.88 | 8,200 ₹2,98,316 Lowest | 9,800 ₹3,56,524 | 8,295 ₹3,01,772.1 | 9,200 ₹3,34,696 | 9,900 ₹3,60,162 |
| 8.01 | ii) Walls(any thickness but ot less than 0.1 mtr thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level. | 138.13 | Cum. | 8,700 ₹12,01,731 | 10,000 ₹13,81,300 | 9,276 ₹12,81,293.88 | 9,000 ₹12,43,170 | 9,950 ₹13,74,393.5 | 8,295 ₹11,45,788.35 Lowest | 9,350 ₹12,91,515.5 | 9,999 ₹13,81,161.87 |
Tender Value
₹2.0 Cr
EMD Value
₹2.3 L
Closing Date
13 Feb 2023, 5:00 pmClosed
Executive Engineer
JSV Division Kullu
Laying, jointing and testing of DI pipe 200 mm dia 900 Rmt. and 150mm dia 3500 Rmt, Construction of RCC Manhole chamber 234 No,s , Construction of RCC Manhole chamber 234 Construction of RCC Retaining wall 150 mtr, Dismantling and reconstructi
2023_HPIPH_67694_1
13393-442
Open Tender
Civil Works
Item Rate
Kullu
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,500
EE
₹2.3 L
Yes
2 Mar 2023
28 Jan 2023
14 Feb 2023
28 Jan 2023
13 Feb 2023
29 Jan 2023
Amount
Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water , blasting soft/ hard rock or chiselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of beds to correct grade i/c shoring/strutting, planking,timbering & dewatering wherever required, stacking the useable & unuseable material/soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in layer by ramming & watering & then disposing of all surplus excavated soil/unuseable material as directed with in all leads & lifts complete in all respect as per directions of engineer-in-charge.
Excavation in foundation trenches etc. in all kinds of earth work such as spade work, pick work, jumper work saturated /un saturated soil blasting work and chiseling/wedging out of rocks where blasting work prohibited up to all depth and lifts including pumping and bailing out water where ever required stacking the excavated earth not more than 3mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into the plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated material within all leads and lifts, useful material available from excavation to be properly stacked and handed over free of cost to the department as per direction of the Engineer-in Charge.
Laying, jointing and testing in trenches ISI marked centrifugally cast (spun) Ductile iron pressure pipes for water, gas and sewage with socket and spigot ends conforming to IS-8329-2000 and latest with up to date ammendments in length of 5 to 6.00 mtrs. class K-7 suitable for push on joint (rubber gastek D-jointing) including short pieces, collars with cement mortar lining in side the pipes with outside zinc coating as per IS-8329-2000 complete in all respect within all leads & lifts & to the entire satisfaction of the Engineer-in-charge. (Earth work in trenches to be measured and paid for separately).200 mm dia
150 mm dia
Providing and laying cement concrete 1:6:12 (1cement: 6sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth
Providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded crushed stone aggregate 40mm nominal size )and curing complete excluding cost of form work in foundation and plinth with in all leads & lifts as per the entire satisfaction & direction of Engineer - in - charge.
Providing and laying cement concrete 1:2:4 ( 1 cement : 2 Sand : 4 graded stone aggregate , 20 mm nominal size ) and curing complete excluding cost of form work and reinforcement in Walls ( any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level.
Providing and laying cement concrete 1:2:4 ( 1 cement :2 sand :4 aggregate 20 mmm nominal size ) & curing complete etc, cost of form work & reinforcement for RCC work in Foundation and plinth at all lead lead and lifts & with entire satisfaction of Engineer-in-charge
Providing and laying cement concrete 1:1.5 :3 ( 1cement: 1 1/2 sand: 3graded stone aggregate 20 mm nominal size )and curing complete excluding the cost of form work and reinforcement in:- I) Foundation and plinth.
ii) Walls(any thickness but ot less than 0.1 mtr thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level.
iii) suspended floors, roofs,landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers up to floor two level.
Providing from work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooden battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge . I) Vertical surface such as walls(any thickness) partitions and the like including attached pillasters, butteresses, plinth and string courses and the like.
ii) Flat surfaces such as soffits of suspended floors, roofs landings and the like: floors etc. up to 200 mm in thickness.
Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level.
Providing and Fixing of S.F.R.C. manhole covers confirming to IS: 12592 (part-II)-1991 with latest amendments of different grades, description and opening of frame EHD35 ISI mark circular type dia 560 mm as per the requirement in all leads and lifts.
Demolition of brick work in cement mortar below G.L upto 1.50 mtrs. depth i/c stacking of serviceable materials & disposal of unserviceable materials within 20 mtrs. lead as per the direction & to the entire satisfaction of the Engineer-in-charge.
Demolition of stone masonary up to ground level i/c stacking of serviceable materials & disposal of unserviceable materials within 20 mtrs. lead as per the direction & to the entire satisfaction of the Engineer-in-charge.
Stones/Boulders filling behind the R/walls,also under floor etc,in all lifts and leads complete in all respect and to the entire satisfaction of engineer-in-charge
Ankit Kumar
GURBACHAN SING
Royal Construction Company
MNBN Enterprises
M/S VIKAS CONSTRUCTION CO.
Rakesh Sen
Thakur Narender Co Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_102002.xls
BOQ • 0.29 MB
FORMSIX.pdf
Tender Documents • 0.08 MB
FORMEIGHT.pdf
Tender Documents • 0.63 MB
TC.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .