Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
1 Mar 2021, 2:00 pmClosed
AEE GL GCC TRICHY
O/o. SE GCC TRICHY
Introduction of WC strung bus structure in the existing strung bus at Siruganur 110 KV SS.
2021_EB_198188_1
GCC 111 GL 045 2020-21
Open Tender
Civil Works
Works
90 days
Siruganur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,200
26 Mar 2021
22 Feb 2021
2 Mar 2021
22 Feb 2021
1 Mar 2021
22 Feb 2021
Amount
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete.
Earthwork excavation in SDR not requiring blasting with an initial lead of 10m and lift of 2m etc complete.
Earthwork excavation in MR & DMR not requiring blasting with an initial lead of 10m and lift of 2m etc complete.
PCC 1:3:6 (M 10), using 20mm HBG metal foundation without form work including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 (M 20) using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, water charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement (by using mixer machine).
RCC 1:1.5:3 (M 20) using 12 to 20mm HBS metal (machine crushed) for Grade beam/plinth beam with formwork including cost of all labour, materials, lead, lift, etc, complete. But excluding cost of steel reinforcement (by using mixer machine).
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Plastering with CM.1:5 mix 12mm thick for inside & outside walls, including cost of all materials, labour, lead, litf, etc, complete.
Colour washing two coats of approved Plastic emulsion over one coat of white cement primer for wall including cost of all materials, labour, lead, lift, etc., complete.
Supplying, transport and erection of towers, booms and all other lattice structure including cost of all materials for G.I angles, hot tip galvanising, all labour, lead, lift, etc. complete.
Supplying and transport of various size of ISI GI Bolt & Nut and washer as per IS standards and approved by competent authority before erection as per the requirement to site including cost of material, lead, lift, labour, etc complete.
Spreading of surplus earth outside SS premises including cost of all material, labour, lead, lift, etc complete.
Supply, fabrication of template to fix the foundationn bolts for WC column and VC column etc including cost of all labour, lead, lift, etc., complete.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .