Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹70.2 L−₹4.1 L (5.55%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹76.4 L+₹2.1 L (2.83%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹80.3 L
EMD Value
₹50,000
Closing Date
22 Oct 2019, 11:00 amClosed
EXECUTIVE ENGINEER , LSGD DIVISION ,PALAKKAD
EXECUTIVE ENGINEER , LSGD DIVISION ,PALAKKAD
LAC-ADS 2018-19 Malampuzha Constituency Mundur Thekkumkara Bridge Construction in Mundur GP
2019_LSGD_304099_1
197/E/19-20
Open Tender
Civil Works - Bridges
Item Rate
180 days
EXECUTIVE ENGINEER, LSGD DIVISION
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
Yes
online
₹50,000
Yes
11 Mar 2020
9 Oct 2019
25 Oct 2019
9 Oct 2019
22 Oct 2019
9 Oct 2019
Amount
SITE CLEARANCE
2.1 : Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means
2.2.1.A : Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(I)By Manual Means (A)In area of non-thorny jungle
EARTH WORK
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 mExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
od236796/2019_2020 : Earthwork in excavation by mechanical means (Hydralulic Excavator) / mannual means over areas (exceeding 30cm in depth, 1.5m in width aswell as 10 Sqm on plan) including getting out and disposal of excavated earth lead up to 50m and lift up to 1.5m, as directed by Engineer -in-charge Ordinary Rock
od236849/2019_2020 : Providing 20mm dia Fe 500 rods with edge distance 15cm,spacing 600mm c/c and depth 500mm ,Bond strength taken as 1.6MPA ,Using chemical HILTI-HIT-Fe-500 including all charges ,
11.2.2 : Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 2. Earth filling (For marshy soil)
14.8 : Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
14.1 : Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
11.3 : Filling annular space around footing in rock as per technical specification Clause 1203.4.3.P.C.C grade M 15 :- Nominal mix 1:2.5:5
12.5.4 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204For height upto 5 mIV.R.C.C. grade M 25
13.25.2 : Providing & Laying reinforced cement concrete arch complete including centering and shuttering excluding reinforcement as per drawings and technical specifications Clauses 800, 900 and 1205.1RCC Grade M 25
13.12 : Reinforcement Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211.
13.6 : Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
13.2 : Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
12.6 : Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Approach Road
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 mExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
12.5.1.1 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204For height upto 5 mI.P.C.C grade M 15(i)Nominal mix (1:2.5:5)
13.2 : Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
11.2.2 : Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 2. Earth filling (For marshy soil)
4.17.A.1 : Crusher Run Macadam Base <br> Providing crushed run stone aggregate greading conforming to table 400.20 depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a three wheel 80-100 kN static roller as per Technical Specification Clause 411 to form a layer of sub-base/base <br> A) By mix-in-place method <br> (i) With 53 mm maximum size of aggregates
PALAKKAD Dist LABOUR CO OP SOCIETY Ltd
REJI K ITTAN
Bidder Name
REJI K ITTAN
K RAJAN
PALAKKAD Dist LABOUR CO OP SOCIETY Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_416569.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .