Loading…
Loading…
| Sl No | Description | Qty | Unit | NOUFAL PK L2 | AJESH T V L1 |
|---|---|---|---|---|---|
| 1.00Construction of Temporary Bund | |||||
| 1.00 | OD285320/2025-2026:Sub Data for providing Earth filled cement bags including filling, conveying and placing in position. | 5,920 | each | 140 ₹8,28,800 | 104.07 ₹6,16,094.4 Lowest |
| 1.00 | OD283551/2025-2026:Sub Data for Filling earth (excluding rock) in the core portion of the earthen bund by consolidating each deposited layer by ramming and watering, as per direction of the departmental officers. | 50 | cum | 750 ₹37,500 | 638.12 ₹31,906 Lowest |
| 1.00 | 100.52.S.5:Sub Data for Dismantling the sand / earth filled cement bag from the foundation site of bund, apron on both sides, counter wall and removing the sand/earth from the bag and disposing the damaged cement bags properly as per the direction of the department officers including all cost of labour charges etc complete. | 148 | cum | 521.86 ₹77,235.28 | 521.36 ₹77,161.28 Lowest |
| 1.00 | 100.52.S.3:Sub Data for Supplying, conveying and covering using best quality polythene sheet on bund to protect bund from seasonal changes. | 323 | sqm | 40 ₹12,920 | 22.83 ₹7,374.09 Lowest |
| 1.00 | 100.52.S.4:Sub Data for Conveying and providing bamboo poles for reinforcing the temporary bund including the cost materials and labour charges etc. complete. | 31.25 | cum | 298.56 ₹9,330 | 298.27 ₹9,320.94 Lowest |
Tender Value
₹7.1 L
EMD Value
₹17,680
Closing Date
23 Feb 2026, 3:30 pmClosed
Assistant Executive Engineer
PH Sub Division Office KWA Tirur
State Plan-State plan 2025-2026 -Source Improvement and amp water Conservation - Construction of bund across Thoothappuzha river at Kaithakkadavu pump house-General Civil Work
2026_KWA_837080_1
03/2025-26/AEE/T/19623/VLY
Open Tender
Civil Works - Water Works
Item Rate
60 days
Thoothappuzha river at Kaithakkadavu pump house
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,560
₹17,680
12 Jun 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
Construction of Temporary Bund
OD285320/2025-2026:Sub Data for providing Earth filled cement bags including filling, conveying and placing in position.
OD283551/2025-2026:Sub Data for Filling earth (excluding rock) in the core portion of the earthen bund by consolidating each deposited layer by ramming and watering, as per direction of the departmental officers.
100.52.S.5:Sub Data for Dismantling the sand / earth filled cement bag from the foundation site of bund, apron on both sides, counter wall and removing the sand/earth from the bag and disposing the damaged cement bags properly as per the direction of the department officers including all cost of labour charges etc complete.
100.52.S.4:Sub Data for Conveying and providing bamboo poles for reinforcing the temporary bund including the cost materials and labour charges etc. complete.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1409740.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.13 MB
Tendernotice_3.pdf
PDF • 0.20 MB
BOQ_1409740.xls
BOQ • 0.30 MB
Preliminaryagmnt.pdf
Additional Documents • 0.24 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Affidavit.pdf
Other Document • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].