| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.6 CrAccepted-AOC | ₹24.6 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹25.9 CrRejected-Finance | ₹25.9 Cr | 2 | Rejected-Finance NOT L1 |
| 3 | 3₹26.8 CrRejected-Finance | ₹26.8 Cr | 3 | Rejected-Finance NOT L1 |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
10 Mar 2021, 6:55 pmClosed
SE, North Circle, SSWM, W and S Sector, KMDA
Block- A, 5th Floor, Unnayan Bhavan, Salt Lake City, Kolkata 700 091
Design, drawing, construction, commissioning, trial run etc. of two nos. 7.0 m dia. storm water drainage.....network complete, in order to remove storm water inundation at ward no. 7, 8 and 15 at Habra Municipality, on turnkey basis.
2021_KMDA_325347_1
13/SE(NC)/SD and SWM/KMDA of 2020-2021
Open Tender
CIVIL WORKS
720 days
KOLKATA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10 L
Office of the SE, North Circle
21 Jun 2021
10 Feb 2021
12 Mar 2021
10 Feb 2021
10 Mar 2021
10 Feb 2021
19 Feb 2021
Amount
ALL CIVIL WORKS: Design, drawing, construction, commissioning, trial run etc. of one no. 7.0 m dia. storm water drainage pumping stations of capacity 30m3/minute (1,800m3/Hr.) each, including all appurtenant structures and allied works, including 12 months of operation and maintenance with trial run, at Bahanna Paribar, ward no. 8, in order to remove storm water inundation at ward no. 7, 8 and 15 at Habra Municipality, on turnkey basis. (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
ALL ELECTRO-MECHANICAL WORKS: Design, drawing, construction, commissioning, trial run etc. of one no. 7.0 m dia. storm water drainage pumping stations of capacity 30m3/minute (1,800m3/Hr.) each, including all appurtenant structures and allied works, including 12 months of operation and maintenance with trial run, at Bahanna Paribar, ward no. 8, in order to remove storm water inundation at ward no. 7, 8 and 15 at Habra Municipality, on turnkey basis. (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
OPERATION AND MAINTENANCE OF ONE PUMPING STATION AT BAHANNA PARIBAR, WARD NO. 8, HABRA MUNICIPALITY: For 12 months after succesful commissioning of the plant. (Including GST, cess and other Govt. taxes etc. all complete)
ALL CIVIL WORKS: Design, drawing, construction, commissioning, trial run etc. of one no. 7.0 m dia. storm water drainage pumping stations of capacity 30m3/minute (1,800m3/Hr.) each, including all appurtenant structures and allied works, including 12 months of operation and maintenance with trial run, at Sardar Para, ward no. 15, in order to remove storm water inundation at ward no. 7, 8 and 15 at Habra Municipality, on turnkey basis. (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
ALL ELECTRO-MECHANICAL WORKS: Design, drawing, construction, commissioning, trial run etc. of one no. 7.0 m dia. storm water drainage pumping stations of capacity 30m3/minute (1,800m3/Hr.) each, including all appurtenant structures and allied works, including 12 months of operation and maintenance with trial run, at Sardar Para, ward no. 15, in order to remove storm water inundation at ward no. 7, 8 and 15 at Habra Municipality, on turnkey basis. (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
OPERATION AND MAINTENANCE OF ONE PUMPING STATION AT SARDAR PARA, WARD NO. 15, HABRA MUNICIPALITY: For 12 months after succesful commissioning of the plant. (Including GST, cess and other Govt. taxes etc. all complete)
Design, drawing, construction, commissioning, trial run etc. of approximately 1500 m (+/- 10%) covered masonry surface drain of section, varying from 0.9m x 1.2m to 1.2m x 1.5 m, including shifting of utilities, if any, necessary road restoration complete in all respect, in order to remove storm water inundation at ward no. 7, 8 and 15 at Habra Municipality, on turnkey basis. (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
Supply, laying, construction, commissioning etc. of Double Wall Corrugated (D.W.C.) HDPE pipe/s conforming to IS: 16098 (Part-II) – 2013, having stiffness class of SN 8 etc., including shifting of utilities, if any, cutting trenches, filling with silver sand wherever necessary, backfilling with excavated earth with complete road restoration, construction of manholes, if required etc. all complete, as per direction of EIC (diameter with length to be executed, is as per scope of work). (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
Supplying and laying of 630mm dia. HDPE (materials grade PE 100) pipes confirming to IS: 14333 - 1996 with latest revision & amendments if any with necessary HDPE Specials, of length approximately 2050m (+/-10%), including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder, road sub grade and its flank but excluding morum laterite or sand stone/hard rock cutting with chisel required including cutting road flank/brick pavement etc. without damaging the existing telephone/electrical cable line etc. (in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be borne by the agency at his own cost ) up to the depth (avg.). so as to maintain 1.10 m earth cushion from top of the pipe up to GL including loading, unloading, carrying lowering lying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding /adopting suitable methods (butt weld jointing with help of hydraulic tack and trimming machines , hitter etc. for reaching at necessary melting points of HDPE pipe so that joint can be monolithic) so as to facilitate the maintains of pipe line locally as per conventional method in future as per direction of E.I.C. Complete road restoration is required to be done by the agency. (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
Supplying and laying of 800mm dia. HDPE (materials grade PE 100) pipes confirming to IS: 14333 - 1996 with latest revision & amendments if any with necessary HDPE Specials, of length approximately 1550m (+/-10%), including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder, road sub grade and its flank but excluding morum laterite or sand stone/hard rock cutting with chisel required including cutting road flank/brick pavement etc. without damaging the existing telephone/electrical cable line etc. (in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be borne by the agency at his own cost ) up to the depth (avg.). so as to maintain 1.10 m earth cushion from top of the pipe up to GL including loading, unloading, carrying lowering lying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding /adopting suitable methods (butt weld jointing with help of hydraulic tack and trimming machines , hitter etc. for reaching at necessary melting points of HDPE pipe so that joint can be monolithic) so as to facilitate the maintains of pipe line locally as per conventional method in future as per direction of E.I.C. Complete road restoration is required to be done by the agency. (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
Any other work, necessary for completion of the scheme, i.e., total drainage network system for successful commissioning of the project (miscellaneous requirement) (amount to be quoted inclusive of GST, cess, other Govt. taxes etc. all complete)
S MISRA INFRADEV PVT.LTD
M.C.GHOSH AND ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid