| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 CrAdmitted-Finance NIL | +0.00% | ₹5.8 Cr | L1 | Admitted-Finance |
| 2 | L1₹5.8 CrAdmitted-Finance AT DANDUGUDA PO PS KHATIGUDA DIST NAWARANGPUR 764070 | NABARANGPUR | ODISHA | 764070 | +0.00% | ₹5.8 Cr | L1 | Admitted-Finance |
| 3 | L1₹5.8 CrAdmitted-Finance | +0.00% | ₹5.8 Cr | L1 | Admitted-Finance |
| 4 | L1₹5.8 CrAdmitted-Finance | +0.00% | ₹5.8 Cr | L1 | Admitted-Finance |
| 5 | L1₹5.8 CrAdmitted-Finance | +0.00% | ₹5.8 Cr | L1 | Admitted-Finance |
Tender Value
₹5.8 Cr
EMD Value
₹5.8 L
Closing Date
24 Jul 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE, SUNDARGARH
Road from Goilo Oramtola to Fikadchundi
2026_CERWI_135436_1
RWCCESNG-15 of 2026-27
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Rourkela
3 documents required · 3 mandatory
₹10,000
₹5.8 L
Yes
19 Sept 2026
10 Jul 2026
27 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
10 Jul 2026 - 23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in charge. | 23,952 | sqm | 8.63 | ₹2,06,705.76 |
| 2 | Dismetalling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviciaable and unserviceable materials separately. | 877.95 | cum | 318.7 | ₹2,79,802.67 |
| 3 | Excavation in ordinary rock using Hydraulic Excavator of 0.9 cum bucket capacity including cutting and loading in tippers,transporting to embankment site with a lift upto 1000m,trimming bottom and side slopes in accordance with requirements of lines,grades and cross-section as per Techinal Specification clause 302.3.5. | 25,468.73 | cum | 86.12 | ₹21,93,367.03 |
| 4 | Earth work in excavation of in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing material with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and as per the direction of Engineer-in-charge. | 1,591.8 | cum | 597.57 | ₹9,51,211.93 |
| 5 | Excavation in Hard Rock (blasting prohibited by mechanical means) as per technical specificaation clause 302 | 4,775.39 | cum | 424.34 | ₹20,26,388.99 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. | 8,980.46 | cum | 271.82 | ₹24,41,068.64 |
| 7 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 21,074.93 | cum | 50.46 | ₹10,63,440.97 |
| 8 | Construction of granular sub-base by providing close graded granular sub base Grading III material as per table 401-1, spreading in uniform layer with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC ,and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MoSRT&H Specification for Road & Bridge works (4 th Revision) | 3,916.2 | cum | 1,891.51 | ₹74,07,531.46 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision). | 2,433.29 | cum | 2,507.22 | ₹61,00,793.35 |
| 10 | Construction of Un-reinforced,plain cement concrete pavement M-30 grade over a prepared sub base with 43 grade using brande cement @ 350 kg per cum,coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, spread, compacted finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, finishing to lines and grages as per drawing and as per Clause 602 of MoSRT&H specifications for Road & Bridge Works and as per as per specification & direction of the Engineer-in-Charge. | 376.58 | cum | 7,618.02 | ₹28,68,793.97 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 6.49 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_601042.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .