Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.4 LAdmitted-Finance | -22.00% | ₹37.4 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
11 Jun 2026, 6:00 pmClosed
commissioner
nagar nigam kota
nagar nigam kota area jiran shiran jarjar bhawan and house todker malva uthane ka work 1 nit 11
2026_DLB_563480_1
NNK/XEN/2026/CIVIL/157-168 nit 11
Open Tender
Civil Works
Percentage
180 days
kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
commissioner
₹96,000
Yes
18 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
11 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK NAME | |||||
| 1.01 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Stone, boulders, gravelly material (Beyo nd 5 Km upto 10 Km. per Km) [Rate 239.78 + 19.12 = 258.90 Per Cum] | 3,400 | Cum | 258.9 | ₹8,80,260 |
| 1.02 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks | 1,120 | Cum | 678 | ₹7,59,360 |
| 1.03 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Dismantling Brick / Tile work, In cement mortar | 745 | Cum | 394.5 | ₹2,93,902.5 |
| 1.04 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Dismantling Stone Masonry | 895 | Cum | 386 | ₹3,45,470 |
| 1.05 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Rubble stone masonry in cement mortar. Dry rubble masonry | 745 | Cum | 259.5 | ₹1,93,327.5 |
| 1.06 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer in-charge: In cement mortar. | 185 | Cum | 591 | ₹1,09,335 |
| 1.07 | Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back filling of pit by manual means including disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable material and unserviceable material separately as per MoRT&H specification clause 202. | 745 | Mtr | 98.5 | ₹73,382.5 |
| 1.08 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge. In cement mortar | 560 | Cum | 462.5 | ₹2,59,000 |
| 1.09 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 25 mm and upto 40 mm | 1,490 | Sqm | 73.9 | ₹1,10,111 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
1101.pdf
Tender Documents • 3.50 MB
BOQ_1002914.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .