Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.6 LAccepted-AOC | ₹34.6 L | L1 | Accepted-AOC Below Rate |
| 2 | L2₹35.0 LRejected-AOC | ₹35.0 L | L2 | Rejected-AOC Above Rate |
| Sl No | Description | Qty | Unit | P THANNASI L2 | R.BASKARAN L1 |
|---|---|---|---|---|---|
| 1.00Providing Drainge at Sarathi Export to Chinnaandankovil Dhanalakshmi Marbill H/O Andankovil East Panchyat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 371.14 | Cum | 266 ₹98,723.24 | 264 ₹97,980.96 |
| 3.00 | Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course. | 47.34 | Cum | 5,389 ₹2.6 L | 5,336 ₹2.5 L |
| 4.00 | Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat. | 126.52 | Cum | 6,150 ₹7.8 L | 6,089 ₹7.7 L |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 1,295.1 | Sqm | 553 ₹7.2 L | 547 ₹7.1 L |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. | 2.94 | Cum | 92,822 ₹2.7 L | 91,893 ₹2.7 L |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete | 74.87 | Cum | 9,160 ₹6.9 L | 9,069 ₹6.8 L |
| 8.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 266.66 | Sqm | 583 ₹1.6 L | 578 ₹1.5 L |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 5,33,213 ₹5.3 L | 5,27,882 ₹5.3 L |
Updated dates
Tender Value
₹35 L
EMD Value
₹35,000
Closing Date
5 Mar 2026, 3:00 pmClosed
Block Development Officer(V.P)
Thanthoni Block
Construction of New Drainage from Sarathi Export to ChinnaAndankovil (Dhanalakshmi Marble) Varai
2026_RDTN_668878_10
Thanthoni Block - Andankovil East - CGF -2025-26
Open Tender
Civil Works
90 days
Thanthoni Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹35,000
14 Mar 2026
4 Mar 2026
5 Mar 2026
4 Mar 2026
5 Mar 2026
4 Mar 2026
Providing Drainge at Sarathi Export to Chinnaandankovil Dhanalakshmi Marbill H/O Andankovil East Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_805321.xls
BOQ • 0.28 MB
Tech_pricebid.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid