Loading…
Loading…
Tender Value
₹5.0 Cr
EMD Value
₹10.1 L
Closing Date
20 Jul 2026, 3:00 pm
Executive Engineer (Civil)
Executive Engineer (Civil) Construction and Maintenance Division IIT Hyderabad Kandi Sangareddy-502284
Construction of Directors Residence cum Integrated Office Ancillary Buildings including Boundary wall at IIT Hyderabad Kandi Sangareddy
2026_IITH_915617_1
IITH/CMD/CIV/NIT/2026-27/14
Open Tender
Civil Works - Buildings
300 days
Construction and Maintenance Division IITHyderabad
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹10.1 L
Conference Hall, CMD, IIT Hyderabad
2 Jul 2026
2 Jul 2026
21 Jul 2026
2 Jul 2026
20 Jul 2026
3 Jul 2026
3 Jul 2026 - 9 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Director's Residence cum Integrated Office including servant quarter framed structurer with finishing’s
(Payement percentage breakup at Annexure A) | 1 | Lumpsum | - | - |
| 2 | All internal water supply, sanitary & rain water pipe lines and sanitary fixtures and fittings, etc. complete as per the directions of EIC.
(Payement percentage breakup at Annexure B) | 1 | Lumpsum | - | - |
| 3 | External Development Works
(Payement percentage breakup at Annexure C) | 1 | Lumpsum | - | - |
| 4 | Landscaping & Horticulture Works
(Payement percentage breakup at Annexure D) | 1 | Lumpsum | - | - |
| 5 | Payment percentage breakup for Internal Electrical wiring and internal electrification installations, UPS System, Illuminated Signage's, street lighting, compound and Foot Path Lighting, etc.
(Payement percentage breakup at Annexure E) | 1 | Lumpsum | - | - |
| 6 | Payment percentage breakup for External Service Connection from MV Panels at AC Plant-5 and DG Set with AMF Panel and Earthing System
(Payement percentage breakup at Annexure F) | 1 | Lumpsum | - | - |
| 7 | Payment percentage breakup for Supply, Installation, Testing and Commissioning of VRF Based AC System
(Payement percentage breakup at Annexure G) | 1 | Lumpsum | - | - |
| 8 | Payment percentage breakup for Supply, Installation, Testing & Commissioning of Lifts with complete Earthing System
(Payement percentage breakup at Annexure H) | 1 | Lumpsum | - | - |
| 9 | Payment percentage breakup for Automatic Fire Alarm System, Fire Extinguishers
(Payement percentage breakup at Annexure I) | 1 | Lumpsum | - | - |
| 10 | Payment percentage breakup for LAN, Networking system
(Payement percentage breakup at Annexure J) | 1 | Lumpsum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 26.95 MB
Tendernotice_2.pdf
PDF • 6.16 MB
Tendernotice_3.pdf
PDF • 25.37 MB
Tendernotice_4.pdf
PDF • 15.21 MB
Tendernotice_5.pdf
PDF • 7.43 MB
Tendernotice_6.pdf
PDF • 20.76 MB
Tendernotice_7.pdf
PDF • 10.28 MB
BOQ_962227.xls
BOQ • 0.34 MB
DrawingsforNIT14final.pdf
PDF • 38.08 MB
Download all tender documents and submit your bid