| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.5 LAccepted-AOC | ₹47.5 L | L1 | Accepted-AOC AOC, being the lowest bidder |
| 2 | L2₹49.6 L+₹2.1 L (4.46%)Rejected-Finance | ₹49.6 L+₹2.1 L (4.46%) | L2 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
| 3 | L3₹49.9 L+₹2.4 L (5.10%)Rejected-Finance 00 VIDYUT NAGAR MEERANPUR SADDARALI TANDA AMBEDKAR NAGAR UTTAR PRADESH 224238 UDYAM UP 04 0030119 | AMBEDKAR NAGAR | UTTAR PRADESH | 224238 | ₹49.9 L+₹2.4 L (5.10%) | L3 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
| 4 | L4₹51.1 L+₹3.6 L (7.59%)Rejected-Finance 274 210 DAFNALA ROAD SHAHIBAUG AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | ₹51.1 L+₹3.6 L (7.59%) | L4 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
| 5 | L5₹53.3 L+₹5.8 L (12.2%)Rejected-Finance | ₹53.3 L+₹5.8 L (12.2%) | L5 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
| Sl No | Description | Qty | Unit | nirman construction L1 | Ramdev and Sons L7 | Priya Construction co. L3 | VIJAY CONSTRUCTION CO L6 | M/s SUNIL ENTERPRISES L5 | ALBA AC AND REF SERVICES L4 | partechengineers L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in hard/dense soil complete all as specified and directed. | 445 | Sqm | 60 ₹26,700 | 100 ₹44,500 | 50 ₹22,250 Lowest | 90 ₹40,050 | 50 ₹22,250 Lowest | 72 ₹32,040 | 68 ₹30,260 |
| 2.00 | M & L for earth work in excavation by mechanical means (hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed (all kinds of soil) complete all as specified and directed. | 150 | Cum | 183 ₹27,450 Lowest | 330 ₹49,500 | 250 ₹37,500 | 225 ₹33,750 | 200 ₹30,000 | 270 ₹40,500 | 250 ₹37,500 |
| 3.00 | M&L for earth work in excavation by mechanical means (hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift exc 1.5m and n. exc 3.00m, as directed (all kinds of soil) complete all as specified and directed. | 17.5 | Cum | 275 ₹4,812.5 Lowest | 440 ₹7,700 | 300 ₹5,250 | 310 ₹5,425 | 350 ₹6,125 | 320 ₹5,600 | 300 ₹5,250 |
| 4.00 | M&L PCC (1:4:8) type d2(40 mm graded aggregate) as in mass concerte complete all as specified and directed. | 21 | Cum | 5,400 ₹1,13,400 | 5,550 ₹1,16,550 | 5,400 ₹1,13,400 | 5,500 ₹1,15,500 | 5,500 ₹1,15,500 | 5,800 ₹1,21,800 | 5,200 ₹1,09,200 Lowest |
| 5.00 | M&L for returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft to loose soil complete all as specified and directed. | 200 | Cum | 150 ₹30,000 | 300 ₹60,000 | 180 ₹36,000 | 100 ₹20,000 Lowest | 150 ₹30,000 | 150 ₹30,000 | 180 ₹36,000 |
| 6.00 | M&L for removing excavated soil not exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 143 | Cum | 300 ₹42,900 | 450 ₹64,350 | 300 ₹42,900 | 190 ₹27,170 Lowest | 300 ₹42,900 | 250 ₹35,750 | 290 ₹41,470 |
| 7.00 | M&L RCC M-30 (design mix) using 20mm graded foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed. | 82.73 | Cum | 8,000 ₹6,61,840 | 8,550 ₹7,07,341.5 | 8,100 ₹6,70,113 | 8,200 ₹6,78,386 | 7,950 ₹6,57,703.5 | 8,500 ₹7,03,205 | 7,800 ₹6,45,294 Lowest |
| 8.00 | M&L for formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter complete all as specified and directed. | 80 | Sqm | 350 ₹28,000 Lowest | 370 ₹29,600 | 400 ₹32,000 | 410 ₹32,800 | 400 ₹32,000 | 405 ₹32,400 | 360 ₹28,800 |
| 9.00 | M&L RCC M-30 (design mix) using 20mm graded aggregate for columns, pillars, piers, posts and struts complete all as specified and directed. | 29 | Cum | 9,000 ₹2,61,000 | 9,050 ₹2,62,450 | 9,050 ₹2,62,450 | 9,800 ₹2,84,200 | 8,200 ₹2,37,800 Lowest | 8,900 ₹2,58,100 | 9,200 ₹2,66,800 |
| 10.00 | M&L for formwork to sides of pillars, posts, struts, piers, columns and stanchions for rough finish complete all as specified and directed. | 250 | Sqm | 600 ₹1,50,000 | 700 ₹1,75,000 | 550 ₹1,37,500 | 550 ₹1,37,500 | 500 ₹1,25,000 Lowest | 640 ₹1,60,000 | 500 ₹1,25,000 Lowest |
Tender Value
₹43.6 L
EMD Value
₹87,180
Closing Date
7 Jul 2026, 6:00 pmClosed
GE (AF) Chiloda
GE (AF) Chiloda, LekawadaPatia, PO CRPF Campus, Gandhinagar (Gujarat)-382042
IMPROVEMENT TO VSN ENTRANCE AT HQ SWAC UNDER GE (AF) CHILODA
2026_MES_758678_2
8394/26-27/E8
Open Tender
Civil Works
Item Rate
180 days
CHILODA
As per Tender documents
7 documents required · 7 mandatory
₹500
GE (AF) CHILODA
₹87,180
Yes
5 Sept 2026
23 Jun 2026
9 Jul 2026
23 Jun 2026
7 Jul 2026
1 Jul 2026
23 Jun 2026 - 30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in hard/dense soil complete all as specified and directed. | 445 | Sqm | - | - |
| 2 | M & L for earth work in excavation by mechanical means (hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed (all kinds of soil) complete all as specified and directed. | 150 | Cum | - | - |
| 3 | M&L for earth work in excavation by mechanical means (hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift exc 1.5m and n. exc 3.00m, as directed (all kinds of soil) complete all as specified and directed. | 17.5 | Cum | - | - |
| 4 | M&L PCC (1:4:8) type d2(40 mm graded aggregate) as in mass concerte complete all as specified and directed. | 21 | Cum | - | - |
| 5 | M&L for returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft to loose soil complete all as specified and directed. | 200 | Cum | - | - |
| 6 | M&L for removing excavated soil not exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 143 | Cum | - | - |
| 7 | M&L RCC M-30 (design mix) using 20mm graded foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed. | 82.73 | Cum | - | - |
| 8 | M&L for formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter complete all as specified and directed. | 80 | Sqm | - | - |
| 9 | M&L RCC M-30 (design mix) using 20mm graded aggregate for columns, pillars, piers, posts and struts complete all as specified and directed. | 29 | Cum | - | - |
| 10 | M&L for formwork to sides of pillars, posts, struts, piers, columns and stanchions for rough finish complete all as specified and directed. | 250 | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Retenderdocuments.pdf
Tender Documents • 0.90 MB
BOQ_867041.xls
BOQ • 1.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .