| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | ₹2.0 L | L1 | Accepted-Finance Financial Bid Qualified |
| 2 | L2₹2 LAccepted-Finance 59 16 RAM NAGAR ROTI GODAM KRISHNAPURI MATHURA MATHURA UTTAR PRADESH 281001 UDYAM UP 54 0005259 | MATHURA | UTTAR PRADESH | 281001 | ₹2 L | L2 | Accepted-Finance Financial Bid Qualified |
| 3 | L3₹2.0 LAccepted-Finance | ₹2.0 L | L3 | Accepted-Finance Financial Bid Qualified |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
4 Aug 2022, 5:00 pmClosed
E.E., E.T.D.-II, Bareilly
Hydle Colony, Rampur Garden, Bareilly
Carrying out Dry air Cycle and Centrifuging of 100 MVA TF II at 220 KV SS Amariya, Pilibhit under E.T.D.- II, Bareilly
2022_UPTCL_716048_2
Very Short Term E-Tender No/06/ETD-II/(B)/2022-23
Open Tender
Electrical Works
15 days
Pilibhit
Please Refer In Tender Documents
2 documents required · 2 mandatory
₹590
Ac No 0043002100061489 IFSC PUNB0004300
₹2,000
6 Aug 2022
26 Jul 2022
5 Aug 2022
26 Jul 2022
4 Aug 2022
26 Jul 2022
Amount
Following work is to be carried out for improving IR / Tan Delta values of winding of 100 MVA CGL make T/F at 220 KV S/S Amriya with all cost of men, material, Misc. Consumables, dry air plant & Centrifuging M/c with Operator, Normal and Special T&P, Transport Vehicle etc. required for satisfactory Completion of work, with all due care of safety & Pracautions as per Technical specification and direction of the Supervising Engineer, as per Details below :
To and Fro carriage of oil storage Tank from Designated S/S in Bareilly (Distance Aprox. 70 KM) to 220 KV S/S Amariya including shifting and loading / unloading of oil stroge Tank at Designanted Sub Stations.
Complete evacuation of 100 MVA Transformer Main Tank and filling of dry air of dew point 50°C or better in vacuum and then pressure upto 0.25 kg/Cm2 and again evacuation of the Transformer tank after required time interval (Approx. 12 to 24 Hrs) using centrifuging machine. The work shall include connecting pipes of machine as required, measuring dew point value of Dry Air during every cycle(1 Job is defined as complete cycle of evacuation, filling and maintaining of dry air in the T/F main tank), till the required value is achieved under supervision of Supervising Engineer
Centrifuging of the Transformer Oil Filled in Oil Tank, Un-Interrupted till the desired BDV Value of the Oil is Achieved. Filling of Centrifuged Transformer Oil into Main Tank and Radiators of the above 100MVA Transformer from the Oil Tanker, then Centrifuging & Transformer Oil in Transformer with the Help of Centrifuging Machine, Un-Interrupted till the Desired BDV Values of the Transformer Oil and IR Values are Achieved including Recording of all the Parameters such as Temperature, Vacuum, Insulation Resistance, BDV etc. every 2 Hours.