Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
29 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector/Chairman
IInd Floor, DRDA, Collectorate, Karur
Rejuvenation of Water Bodies in Package No TN 07 72 of Thogamalai Block under AGAMT II 2021-2022
2022_RDTN_238983_6
karur District-Thogamalai Block-AGAMT-II 2021-22
Open Tender
Civil Works - Others
Item Rate
90 days
IInd Floor, DRDA, Collectorate
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹56,000
Yes
IInd Floor, DRDA, Collectorate
4 Aug 2022
5 Jul 2022
29 Jul 2022
5 Jul 2022
29 Jul 2022
5 Jul 2022
8 Jul 2022
90 days
Amount
Construction of baby pond, lining wall of baby pond,(28m) bathing ghat, and Desilting of Panayur Attaikulam , inlet, outlet channel H/o. Neithalur (SF No.205/1)
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Construction of Lead channel in Panayur Attaikulam H/o. Neithalur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Baby Pond Panayur Attaikulam H/o. Neithalur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Bhathing ghat Panayur Attaikulam H/o. Neithalur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of baby pond, lining wall of baby pond,(30 m) bathing ghat, Desilting of Mettukadu Alamarathu Kulam ,inlet, outlet channel (SF No.154/7) H/o. Neithalur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Construction of Lead channel in Alamarathu Kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Baby Pond in Alamarathu Kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Bhathing ghat in Alamarathu Kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of baby pond, lining wall of baby pond, (50m)bathing ghat, stone pitching, Desilting of Goundanpatti Vathiyar kulam, inlet outlet channel (SF No.137/1) H/O.Neithalur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Construction of Lead channel in Goundanpatti Vathiyar kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Baby Pond in Goundanpatti Vathiyar kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Bhathing ghat in Goundanpatti Vathiyar kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Revertment in Goundanpatti Vathiyar kulam
Rough stone dry packing including cost and conveyance of materials etc., complete
Construction of baby pond, lining wall of baby pond, bathing ghat, stone pitching,Desilting of Kamaraj Nagar Kuttai Kulam, inlet outlet channel (SF No.200) H/O.Kalladai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Construction of Lead channel in Kamaraj Nagar Kuttai Kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Baby Pond in Kamaraj Nagar Kuttai Kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Bhathing ghat in Kamaraj Nagar Kuttai Kulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Revertment in Kamaraj Nagar Kuttai Kulam
Rough stone dry packing including cost and conveyance of materials etc., complete
Construction of baby pond, lining wall of baby pond, bathing ghat, stone pitching, Desilting of Komali Kuttaikulam ,inlet outlet channel H/o.Vadeseri
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Construction of Baby Pond in Komali Kuttaikulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Bhathing ghat in Komali Kuttaikulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Lead channel (Sub Estimate)
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Revertment in Komali Kuttaikulam
Rough stone dry packing including cost and conveyance of materials etc., complete
Construction of Baby Pond, Bathing Ghat , Inlet channel , Outlet Channel and stone pitching Telungupatti Theppakulam H/o.Poruthalur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Construction of Baby Pond in Telungupatti Theppakulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Bhathing ghat in Telungupatti Theppakulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Protection wall in Telungupatti Theppakulam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Lead channel (Sub Estimate)
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Construction of Revertment in Telungupatti Theppakulam
Rough stone dry packing including cost and conveyance of materials etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Mohamed Hanifa
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .