Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | INSTALLATION CHARGES Erection, Testing and commissioning of 415 V Distribution Panel and laying of LT Cable from 2 No. Transformers to Distribution Boxes (length 15 mtrs ) and Distribution Boxes to LT panel board ( length 50mtrs ) including termination, lugging and fixing at all ends. | SRI SAI POWER CONTROLS | 1 | ₹57,230 |
| 2 | MCCB 4POLE,CURRENT 400A, | SRI SAI POWER CONTROLS | 1 | ₹16,390.20 |
| 3 | SPECIFICATION LT DISTRIBUTION PANEL | SRI SAI POWER CONTROLS | 1 | ₹6.6 L |
| 4 | SWITCH,FUSE UNIT | SRI SAI POWER CONTROLS | 1 | ₹16,815 |
Tender Value
Refer Docs
Closing Date
8 Oct 2021, 12:00 amClosed
CENTER OF EXCELLENCE FOR TRAING AND DEVELOPMENT, PALONCHA
TSGENCO-CETD-Div-II-Procurement of LT 415V 3-Phase AC Supply Distribution panel along with "Design, manufacturing, Supply,Erection,Testing and Commissioning" for Hostel Building at CETD Campus-Quotations called for-Regarding.
272091
e-proc.No.06/2021-22/CE/CETD/TSGENCO/Paloncha
Goods
Telangana
24 Nov 2021
8 Oct 2021
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .