| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹11.7 L+₹20,080.46 (1.75%)Accepted-AOC KANNUR | KERALA | 670001 | L2 | Accepted-AOC Agreement executed | |
| 2 | L1₹11.5 LRejected-Finance | L1 | Rejected-Finance Rejected due to 10 PERCENTAGE price prefarance given to The ULCCS | |
| 3 | L3₹12.3 L+₹78,332.20 (6.81%)Rejected-Finance | L3 | Rejected-Finance Higher rate |
Tender Value
₹10.6 L
EMD Value
₹26,616
Closing Date
23 Aug 2019, 4:30 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Roads Division, Kozhikode
Bridges - Rectification of Damages due to flood
2019_PWD_294253_1
DB1/TN/75/2019-20(75)Bridges
Open Tender
Civil Works - Bridges
Item Rate
30 days
Nadapuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
online
₹26,616
Yes
27 Feb 2020
19 Aug 2019
26 Aug 2019
19 Aug 2019
23 Aug 2019
19 Aug 2019
Amount
rehabilitation of bridge
2.4.4.D : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Dismantling Stone Masonry - Dry rubble masonry<br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry
3.13.1.A : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Manual Means - (Depth upto 3 M)<br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.Ordinary soil - Manual Means - (Depth upto 3 M)
2.3.1.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Manual Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means
2.4.1.B : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - <br> Cement Concrete Grade M-15 & M-20. - By Manual MeansDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - Cement Concrete Grade M-15 & M-20. - By Manual Means
od15564/2019_2020 : Dry rubble masonry for retaining walls usinf blasted rubble size below 40 dm3 including wedging them tightly with chips including all cost and conveyance of materials, labour charges etc. complete
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.20 : Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer .Providing, Fixing and erecting 50 mm dia GI pipe railing in 3 rows duly painted on Tubular Steel Railing on Medium Weight Steel Channel ( ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings including painting over suitable primer .
8.8 : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
PMR Construction Company
Bidder Name
PMR Construction Company
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Varghese.K.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_401164.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .