Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | ₹1.6 L | L1 | Accepted-AOC Accepted Vide Resolution No.1/1 Dt.04-10-2025 of Thenkara GP |
| 2 | L2₹1.7 LRejected-AOC | ₹1.7 L | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | SAJI THOMAS L1 | UNNIKRISHNAN. P L2 |
|---|---|---|---|---|---|
| 1.00Compound wall and gate | |||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 9.92 | cum | 1,077.63 ₹10,693.32 | 1,197.33 ₹11,881.11 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.86 | cum | 350.72 ₹1,354.83 | 359.72 ₹1,389.6 |
| 1.00 | OD255913/2025-2026:DRY RUBBLE MASONRY _Departmental dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 9.86 | cum | 1,715.88 ₹16,925.44 | 1,715.88 ₹16,925.44 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.6 | cum | 9,003.93 ₹5,402.36 | 9,963.93 ₹5,978.36 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1.2 | sqm | 386.16 ₹463.39 | 386.16 ₹463.39 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.02 | cum | 9,000 ₹9,225 | 9,235.97 ₹9,466.87 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 2.45 | sqm | 386.16 ₹946.09 | 386.16 ₹946.09 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.88 | cum | 12,500 ₹85,937.5 | 12,772.18 ₹87,808.74 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 27.5 | sqm | 756.6 ₹20,806.5 | 839.6 ₹23,089 |
Tender Value
₹1.7 L
EMD Value
₹4,238
Closing Date
29 Sept 2025, 10:00 amClosed
Aneesh P S, Assistant Engineer
Office of the Assistant Engineer, LID EW Section, Thenkara Grama Panchayat
Plan-Pro.No 384/26-Compound Wall Maintanance and Gate for Manaladi School 200000/-
2025_LSGD_799687_7
04/AE/LSGD/THR/2025-26
Open Tender
Civil Works - Buildings
180 days
Thenkara GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹4,238
15 Mar 2026
20 Sept 2025
3 Oct 2025
20 Sept 2025
29 Sept 2025
20 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1326844.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid