Tender Value
₹21.9 L
EMD Value
₹50,000
Closing Date
8 Jun 2026, 3:00 pm4d left
AEE, Substation Subdivision Perinthalmanna
Assistant Executive Engineeer, Substation Subdivision Perinthalmanna Perinthalmanna PO Malappuram Dt - 679322
Construction of 1.5 km, 33kV line to Elamkulam SS using XLPE CCSX 120sqmm AAAC CC, except stringing (Retender)
2026_KSEB_853406_1
SSD PMNA/Etender/26-27/02 dtd 30-05-2026
Open Tender
Electrical Works
60 days
Elamkulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,180
₹50,000
30 May 2026
30 May 2026
8 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | DSR_2.33.1 - 2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth (cost index(c) : 1.3268 included in Rate) | 5 | No | 0.44 | ₹2.2 | 1 |
| 2 | DSR_2.33.2 - 2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth (cost index(c) : 1.3268 included in Rate) | 1 | No | 0.52 | ₹0.52 | 2 |
| 3 | DSR_2.33.3 - 2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth (cost index(c) : 1.3268 included in Rate) | 1 | No | 0.48 | ₹0.48 | 3 |
| 4 | DSR_2.33.4 - 2.33.4 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth (cost index(c) : 1.3268 included in Rate) | 1 | No | 0.32 | ₹0.32 | 4 |
| 5 | DSR_2.32 - 2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. (cost index(c) : 1.3268 included in Rate) | 100 | sq.m | 0.2 | ₹19.99 | 5 |
| 6 | 656 - Clearing touchings on 33kV lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 2.0m from the outer conductor as specified by dept. (Rural/Remote). | 0.6 | km | 1 | ₹0.6 | 6 |
| 7 | TRLC_01.27.18 - Bailing out water with engine and pump set including conveyance to site and erection cost of fuel, lubricating oil and other stores, pay of staff etc.complete (cost index(e) : 1.2062 included in Rate) | 100 | HP.hr | 0.68 | ₹68 | 7 |
| 8 | TRLC_01.27.19 - Dewatering Manual (cost index(e) : 1.2062 included in Rate) | 10 | Hr | 0.96 | ₹9.6 | 8 |
| 9 | TRLC_01.27.15 - Construction of earthern ring bunds for bailing out water for excavation for foundation and stub setting, including shoring, if necessary, with plaited coconut cadjan and bamboos, etc. For Bunds upto 0.5 m height, 1 m bottom width and 0.5 m top width (cost index(e) : 1.2062 included in Rate) | 12 | Mtr | 0.08 | ₹0.96 | 9 |
| 10 | DSR_2.18.1 - 2.18.1 : Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete ( Measurements to be taken of the face area timbered):Depth not exceeding 1.5 m (cost index(c) : 1.3268 included in Rate) | 70 | sq.m | 0.16 | ₹11.19 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_1442276.xls
BOQ • 0.34 MB
TD02.pdf
Tender Documents • 0.68 MB
Download all tender documents and submit your bid