Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC PARPIDAM II KOYILANDY PO KOZHIKODE | KOZHIKODE | KERALA | 612906 | ₹4.4 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | ARUN SUNDAR O L2 | DINESAN N M L1 |
|---|---|---|---|---|---|
| 1.00Construction of Well | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 8.58 | cum | 247.68 ₹2,126.09 | 236.91 ₹2,033.64 |
| 1.00 | OD374205/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of
excavated earth, lead up to 50 m and lift up to 1.5 m to 3.00, for well construction
All kinds of soil for first depth after initial depth | 8.58 | cum | 278.1 ₹2,387.21 | 266.01 ₹2,283.43 |
| 1.00 | OD374206/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of
excavated earth, lead up to 50 m and lift up to 3.00 m to 4.50, for well construction
All kinds of soil for second depth after initial depth | 8.58 | cum | 401.19 ₹3,443.81 | 383.75 ₹3,294.11 |
| 1.00 | OD374207/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 4.5 m to 6.00m, for well construction All kinds of soil for third depth after initial depth | 8.58 | cum | 524.32 ₹4,500.76 | 501.52 ₹4,305.05 |
| 1.00 | OD374208/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 6.00 m to 7.50m, for well construction All kinds of soil for third depth after initial depth | 8.58 | cum | 647.42 ₹5,557.45 | 619.27 ₹5,315.81 |
| 1.01 | OD374209/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 7.50 m to 9.00m for well construction .All kinds of soil for fifth depth after initial depth | 6.29 | cum | 770.52 ₹4,850.42 | 737.02 ₹4,639.54 |
| 1.01 | OD374213/2023-2024:well steining-Laterite masonry with neatly dressed laterite stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials,labour charges etc(MODIFIED OD 50.6.7.1) | 24.14 | cum | 9,240.96 ₹2.2 L | 8,839.18 ₹2.1 L |
| 1.01 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) | 3.68 | cum | 9,903.13 ₹36,473.23 | 9,472.56 ₹34,887.44 |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 21.45 | sqm | 335.6 ₹7,197.61 | 321.01 ₹6,884.70 |
Tender Value
₹4.0 L
EMD Value
₹9,937
Closing Date
14 Mar 2024, 6:00 pmClosed
Assistant Engineer
LID and EW Section Koyilandy P O Koyilandy Kozhikkode 673305
well construction
2024_LSGD_665268_1
LSGD/CELSGD/138278/2023-2024
Open Tender
Civil Works - Others
210 days
koyilandy
Please refer tender documents
10 documents required · 10 mandatory
₹880
Yes
₹9,937
Yes
20 Feb 2026
29 Feb 2024
16 Mar 2024
29 Feb 2024
14 Mar 2024
29 Feb 2024
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid