Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹116.4 CrAccepted-AOC BAKRON KA WADA NEAR NEELAM CINEMA JODHPUR ROAD BALOTRA BARMER RAJASTHAN 344022 | BALOTRA | BARMER | RAJASTHAN | 344022 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹117.9 Cr+₹1.5 Cr (1.30%)Rejected-Finance 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | L2 | Rejected-Finance Being not lowest | |
| 3 | L3₹140.8 Cr+₹24.5 Cr (21.0%)Rejected-Finance 2 LETTER OF A W ARD N O N B C C E D CPG 2022 11 05 DATED 04 02 2022 3 LETTER N O N B C C E D CPG 2022 11 06 DATED 04 02 2022 | L3 | Rejected-Finance Being not lowest | |
| 4 | L4₹161.7 Cr+₹45.3 Cr (38.9%)Rejected-Finance 5 P HAMILTON COURT ROAD SECTOR 27 GURUGRAM HARYANA 122009 | L4 | Rejected-Finance Being not lowest | |
| 5 | Rejected-Technical STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | - | Rejected-Technical Not Validated, refer summary of technical evaluation sheet as uploaded. |
| Sl No | Description | Qty | Unit | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L2 | Brahma Infra L1 | Varindera Constructions Limited L3 | Inderjit Mehta Constructions Pvt Ltd L4 |
|---|---|---|---|---|---|---|---|
| .01SCHEDULE 'A' PART I (TO BE QUOTED BY THE CONTRACTOR) is not prepriced by MES and prepriced rates indicated as blank under col 5 signifies this fact only. Bidders shall insert their lumpsum amount of BOQ Ser item Nos. 1 to 18 in the Green coloured field under Col-6 only. Note: The quoted rates against the items under this schedule are deemed to include for the provisions contained in Scope of Work and Sch 'A' Notes. Ref Sch 'A' Notes complete before quoting these items. Structural designs and architectural/ structural drawings for structures and foundations for the buildings/ structures shall be prepared to comply with the provisions for design and analysis of RCC structures as per latest editions of relevant IS Codes. | |||||||
| .02Schedule ‘A’ Part I BUILDINGS/ STRUCTURES (TO BE QUOTED BY THE CONTRACTOR) | |||||||
| 1.00Lumpsum price worked out for Design and Construction of RCC DOUBLE ENTRY BLAST PEN INCLUDING PQC FLOORING 25 M X 30 M WITH RCC RETAINING WALLS,TOE WALLS, EARTHEN EMBANKMENT ON BOTH SIDES INCLUDING TOP WITH STORE ROOMS, TOILET AND INDEPENDENT 02 NOS RCC RETAINING WALL STRUCTURE WITH TOE WALLS AT BOTH ENDS OF BLAST PEN INCLUDING EARTH EMBANKMENT AS SPECIFED on EPC mode including all excavation & earth work in any type of soil, levelling of ground by filling-cutting to obtain desired modified ground level, CCD measures, joints all types,saucer drain, rendering on ceiling, internal & external surfaces, painting , all things required and shown in drawings, all internal services as listed in Schedule ‘A’ Part I complete all as specified in scope of work, Sch 'A' Notes, drawings, specifications and other parts of tender documents as directed for the following :- | |||||||
| 1.01 | RCC DOUBLE ENTRY BLAST PEN No 1(Inside LTT)
Avg Existing ground level (EGL) - 115.809
Desired Finished Floor level - 116.988 | 1 | Lumpsum | 8,37,55,600 ₹8,37,55,600 Lowest | 8,50,00,000 ₹8,50,00,000 | 10,76,00,000 ₹10,76,00,000 | 11,33,98,400 ₹11,33,98,400 |
| 1.02 | RCC DOUBLE ENTRY BLAST PEN No 2 (Out side LTT)
Avg Existing ground level (EGL) - 114.827
Desired Finished Floor level - 116.438 | 1 | Lumpsum | 8,37,55,600 ₹8,37,55,600 Lowest | 8,50,00,000 ₹8,50,00,000 | 10,83,00,000 ₹10,83,00,000 | 11,35,68,000 ₹11,35,68,000 |
| 1.03 | RCC DOUBLE ENTRY BLAST PEN RHS No 3 (Out side LTT)
Avg Existing ground level (EGL) - 117.449
Desired Finished Floor level - 117.873 | 1 | Lumpsum | 8,37,55,600 ₹8,37,55,600 Lowest | 8,50,00,000 ₹8,50,00,000 | 10,65,00,000 ₹10,65,00,000 | 11,30,94,400 ₹11,30,94,400 |
| 1.04 | RCC DOUBLE ENTRY BLAST PEN No 4 (Inside LTT)
Avg Existing ground level (EGL) - 117.676
Desired Finished Floor level - 119.274 | 1 | Lumpsum | 8,37,55,600 ₹8,37,55,600 Lowest | 8,50,00,000 ₹8,50,00,000 | 10,87,00,000 ₹10,87,00,000 | 11,35,61,600 ₹11,35,61,600 |
| 2.00Lumpsum price worked out for Design and Construction of RCC SINGLE ENTRY BLAST PEN INCLUDING PQC FLOORING 25 M X 30 M WITH RCC RETAINING WALLS,TOE WALLS, EARTHEN EMBANKMENT ON BOTH SIDES INCLUDING TOP WITH STORE ROOMS, TOILET AND INDEPENDENT 01 NOS RCC RETAINING WALL STRUCTURE WITH TOE WALLS AT BACK SIDE OF BLAST PEN INCLUDING EARTH EMBANKMENT AS SPECIFED on EPC mode including all excavation & earth work in any type of soil, levelling of ground by filling-cutting to obtain desired modified ground level, CCD measures, joints all types, saucer drain, rendering on ceiling, internal & external surfaces, painting , all things required and shown in drawings, all internal services as listed in Schedule ‘A’ Part I complete all as specified in scope of work, Sch 'A' Notes, drawings, specifications and other parts of tender documents as directed for the following :- | |||||||
| 2.01 | RCC SINGLE ENTRY BLAST PEN No 1 (Outside)
Avg Existing ground level (EGL) - 111.186
Desired Finished Floor level - 112.946 | 1 | Lumpsum | 6,42,32,315 ₹6,42,32,315 Lowest | 6,70,00,000 ₹6,70,00,000 | 7,85,00,000 ₹7,85,00,000 | 8,70,36,800 ₹8,70,36,800 |
| 2.02 | RCC SINGLE ENTRY BLAST PEN No 2 (RW side)
Avg Existing ground level (EGL) - 113.937
Desired Finished Floor level - 112.946 | 1 | Lumpsum | 6,42,32,315 ₹6,42,32,315 Lowest | 6,70,00,000 ₹6,70,00,000 | 7,69,00,000 ₹7,69,00,000 | 8,66,57,600 ₹8,66,57,600 |
Tender Value
₹138.4 Cr
EMD Value
₹15 L
Closing Date
8 Nov 2025, 6:00 pmClosed
CE(AF) GANDHINAGAR
HQ CE(AF) GANDHINAGAR Lekhawada Patia, Chiloda, Gandhinagar-382042
CONSTRUCTION OF CERTAIN TECH BLDGS AND CONNECTED SERVICES AT AF STN DEESA UNDER PH-II DESIGNATED AS GP-II
2025_MES_731829_1
89414(GP-II)
Open Tender
Civil Works
Lump-sum
913 days
GE (P) (AF) DEESA
All as per NIT and Tender Documents
7 documents required · 7 mandatory
₹3,000
GE (P) (AF) Deesa
₹15 L
Yes
HQ CE(AF) GANDHINAGAR
22 Jun 2026
19 Sept 2025
10 Nov 2025
19 Sept 2025
8 Nov 2025
1 Nov 2025
20 Sept 2025 - 26 Sept 2025
29 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | SCHEDULE 'A' PART I (TO BE QUOTED BY THE CONTRACTOR) is not prepriced by MES and prepriced rates indicated as blank under col 5 signifies this fact only. Bidders shall insert their lumpsum amount of BOQ Ser item Nos. 1 to 18 in the Green coloured field under Col-6 only.
Note: The quoted rates against the items under this schedule are deemed to include for the provisions contained in Scope of Work and Sch 'A' Notes. Ref Sch 'A' Notes complete before quoting these items. Structural designs and architectural/ structural drawings for structures and foundations for the buildings/ structures shall be prepared to comply with the provisions for design and analysis of RCC structures as per latest editions of relevant IS Codes. | - | - | - | - |
| 0.02 | Schedule ‘A’ Part I BUILDINGS/ STRUCTURES (TO BE QUOTED BY THE CONTRACTOR) | - | - | - | - |
| 1Lumpsum price worked out for Design and Construction of RCC DOUBLE ENTRY BLAST PEN INCLUDING PQC FLOORING 25 M X 30 M WITH RCC RETAINING WALLS,TOE WALLS, EARTHEN EMBANKMENT ON BOTH SIDES INCLUDING TOP WITH STORE ROOMS, TOILET AND INDEPENDENT 02 NOS RCC RETAINING WALL STRUCTURE WITH TOE WALLS AT BOTH ENDS OF BLAST PEN INCLUDING EARTH EMBANKMENT AS SPECIFED on EPC mode including all excavation & earth work in any type of soil, levelling of ground by filling-cutting to obtain desired modified ground level, CCD measures, joints all types,saucer drain, rendering on ceiling, internal & external surfaces, painting , all things required and shown in drawings, all internal services as listed in Schedule ‘A’ Part I complete all as specified in scope of work, Sch 'A' Notes, drawings, specifications and other parts of tender documents as directed for the following :- | |||||
| 1.01 | RCC DOUBLE ENTRY BLAST PEN No 1(Inside LTT)
Avg Existing ground level (EGL) - 115.809
Desired Finished Floor level - 116.988 | 1 | Lumpsum | - | - |
| 1.02 | RCC DOUBLE ENTRY BLAST PEN No 2 (Out side LTT)
Avg Existing ground level (EGL) - 114.827
Desired Finished Floor level - 116.438 | 1 | Lumpsum | - | - |
| 1.03 | RCC DOUBLE ENTRY BLAST PEN RHS No 3 (Out side LTT)
Avg Existing ground level (EGL) - 117.449
Desired Finished Floor level - 117.873 | 1 | Lumpsum | - | - |
| 1.04 | RCC DOUBLE ENTRY BLAST PEN No 4 (Inside LTT)
Avg Existing ground level (EGL) - 117.676
Desired Finished Floor level - 119.274 | 1 | Lumpsum | - | - |
| 2Lumpsum price worked out for Design and Construction of RCC SINGLE ENTRY BLAST PEN INCLUDING PQC FLOORING 25 M X 30 M WITH RCC RETAINING WALLS,TOE WALLS, EARTHEN EMBANKMENT ON BOTH SIDES INCLUDING TOP WITH STORE ROOMS, TOILET AND INDEPENDENT 01 NOS RCC RETAINING WALL STRUCTURE WITH TOE WALLS AT BACK SIDE OF BLAST PEN INCLUDING EARTH EMBANKMENT AS SPECIFED on EPC mode including all excavation & earth work in any type of soil, levelling of ground by filling-cutting to obtain desired modified ground level, CCD measures, joints all types, saucer drain, rendering on ceiling, internal & external surfaces, painting , all things required and shown in drawings, all internal services as listed in Schedule ‘A’ Part I complete all as specified in scope of work, Sch 'A' Notes, drawings, specifications and other parts of tender documents as directed for the following :- | |||||
| 2.01 | RCC SINGLE ENTRY BLAST PEN No 1 (Outside)
Avg Existing ground level (EGL) - 111.186
Desired Finished Floor level - 112.946 | 1 | Lumpsum | - | - |
| 2.02 | RCC SINGLE ENTRY BLAST PEN No 2 (RW side)
Avg Existing ground level (EGL) - 113.937
Desired Finished Floor level - 112.946 | 1 | Lumpsum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Upload89414.rar
Tender Documents • 6.32 MB
Drawingstoupload.rar
Additional Documents • 19.66 MB
BOQ_819352.xls
BOQ • 6.69 MB
doc04499320251017145243.pdf
PDF • 0.32 MB
doc04418220250927170707.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .