Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.8 L
EMD Value
₹7,100
Closing Date
26 May 2026, 6:30 pmClosed
EXECUTIVE ENGINEER, TDB, MAVELIKKARA
OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA-690101
KSMDB College Sasthamcotta In Karunagappally group -Providing interlock tiles infront of principal office, reconstructing new platform for trees and carrying out other miscellaneous works. Reg RETENDER
2026_TDB_851495_2
EEM/ET-21/2026-27
Open Tender
Miscellaneous Works
Percentage
10 days
Mavelikkara
Please refer Tender documents.
3 documents required · 3 mandatory
₹708
₹7,100
27 May 2026
23 May 2026
27 May 2026
23 May 2026
26 May 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix I - K S M D B COLLAGE SASTHAMCOTTA IN KARUNAGAPPALLY GROUP -PROVIDING INTERLOCK TILES IN FRONT OF PRINCIPAL OFFICE REG | |||||
| 1.01 | Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | - | m2 | 1,192.59 | - |
| 1.02 | Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 1 | m3 | 1,197.33 | ₹1,196.13 |
| 1.03 | Departmental Random rubble masonry in CM 1:6 with hard stone for foundation and basement | 1 | m3 | 3,757.55 | ₹3,753.79 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | m3 | 9,963.93 | ₹9,953.97 |
| 1.05 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | m2 | 386.16 | - |
| 1.06 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | Kg | 112.43 | ₹112.32 |
| 1.07 | Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | - | m2 | 400.47 | - |
| 1.08 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 0.6 | m2 | 56.51 | ₹33.85 |
| 1.09 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | m2 | 369.76 | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
priliminaryagreement.pdf
Tender Documents • 0.32 MB
BOQ_1440816.xls
BOQ • 0.35 MB
5thnotice.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .