Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance ANAH GATE NEAR JAIN AATA CHAKKI BHARATPUR RAJASTHAN 321001 | BHARATPUR | BHARATPUR | RAJASTHAN | 321001 | Admitted-Finance |
| 4 | Admitted-Finance 144 145 PUSHPAK INDUSTRIAL ESTATE NIKA TUBE COMPOUND PHASE 1 G I D C VATVA AHMEDABAD GUJARAT 382445 | AHMADABAD | GUJARAT | 382445 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
17 Dec 2021, 4:00 pmClosed
DGM
Indian Oil Corporation Limited, Post Box no 04, Viramgam. Ahmedabad 382150, Gujarat
Comprehensive AMC of Reverse Osmosis (RO) Plants at-Group B- WRPL Viramgam Pump station
2021_WRVGM_144080_2
WRPL/VGM/TS/2021-22/032
Open Tender
Civil Works
Works
730 days
Group B- WRPL Viramgam Pump station
As per NIT Criteria
10 documents required · 10 mandatory
Exempted
20 Jan 2022
3 Dec 2021
18 Dec 2021
3 Dec 2021
17 Dec 2021
3 Dec 2021
Amount
Comprehensive AMC charge for existing RO plant (Capacity 300 LPH) which includes all chemical , consumable/ spare required for smooth operation for two years period. It also includes repair/ replacement of all water treatment components already installed in plant, service/ chemical cleaning. Charge includes six visits & two chemical cleaning per year. All consumable, chemical (anti scanlent make M/s Nalco USA), spares (BB cartridges filter, activated carbon filter) and replacement of SS/ FRP Membrane housing are inclusive in this SOR and work will be executed as per direction of EIC/ site engineer. Contractor have to provide one number pH meter and TDS meter ( measuring of pH and TDS reading manually) at plant site till the contract period for measuring the pH and TDS on regular basis. The rates are inclusive of water testing charges every six month at a recognised laboratory and will include water testing of RAW water and RO water as per direction of site engineer / EIC by providing jerry cans , conveyance and manpower etc (Testing Parameters will be pH , TDS, COD, BOD Chlorides, Sulphates, total hardness, Iron , Total alkalinity , Sulphates, Fluoride, Magnesium, Calcium etc as per IS 10500 and as per direction of EIC. If parameters of RO water deviates from prescribed limit the remedial action to be taken by contractor with advice of EIC/ site engineer.
SuryaRoSystemsPvtLtd
Raindrops Water Technologies
fairdealsco
NEW GENERATION WATER SOLUTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .