| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.7 L+₹32,882.98 (1.54%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹22.1 L+₹64,012.26 (2.99%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹22.2 L+₹81,428.60 (3.80%)Rejected-Finance MES COLONY KUMBHIGRAM AIRPORT CACHAR ASSAM 788109 | KUMBHIGRAM | CACHAR | ASSAM | 788109 | L4 | Rejected-Finance L4 | |
| 5 | L5₹22.3 L+₹87,645.16 (4.09%)Rejected-Finance VILL POST SALGANGA DISTT CACHAR ASSAM PIN 788 031 | CACHAR | ASSAM | 788031 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Nishi Kumar Das L7 | M/S ANITA ROY and SONS L1 | Bhuiya Construction L8 | M/S RAKHAL KANTI NAG L3 | Goswami Traders L4 | M/S PIJUSH BHATTACHARJEE L6 | M/S P K ROY & SONS L2 | M/S NIRANJAN ROY L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc. 1.5 Mtr wide and not exc 1.50 Mtr in depth for foundation etc. and getting out in soft/loose soil complete all as specified and as directed. | 214.38 | Cum | 215 ₹46,091.7 | 190 ₹40,732.2 Lowest | 600 ₹1,28,628 | 195 ₹41,804.1 | 190 ₹40,732.2 Lowest | 215 ₹46,091.7 | 192 ₹41,160.96 | 198 ₹42,447.24 |
| 2.00 | Returning filling in soft/loose soil, including spreading, levelling, watering and well ramming in layers not exceeding 25 Cms complete all as specified and as directed. | 190.54 | Cum | 165 ₹31,439.1 | 140 ₹26,675.6 Lowest | 300 ₹57,162 | 144 ₹27,437.76 | 170 ₹32,391.8 | 165 ₹31,439.1 | 145 ₹27,628.3 | 150 ₹28,581 |
| 3.00 | Removing excavated soils to a distance not exc 50 Mtr and depositing where directed at a level not exceeding 1.5 Mtr above the starting point complete all as specified and as directed. | 23.84 | Cum | 265 ₹6,317.6 | 240 ₹5,721.6 Lowest | 300 ₹7,152 | 240 ₹5,721.6 Lowest | 300 ₹7,152 | 240 ₹5,721.6 Lowest | 243 ₹5,793.12 | 248 ₹5,912.32 |
| 4.00 | Taking out existing 15mm bore galvanized steel tubing and connections from trenches / walls / floors, keeping aside serviceable pipe for reuse and removing unserviceable pipe complete all as specified and as directed. | 114 | RM | 280 ₹31,920 | 250 ₹28,500 | 25 ₹2,850 Lowest | 40 ₹4,560 | 280 ₹31,920 | 270 ₹30,780 | 252 ₹28,728 | 260 ₹29,640 |
| 5.00 | All as per item No 4. here in before but 20 MM bore tubing. | 312 | RM | 55 ₹17,160 | 35 ₹10,920 | 25 ₹7,800 Lowest | 44 ₹13,728 | 50 ₹15,600 | 255 ₹79,560 | 36 ₹11,232 | 42 ₹13,104 |
| 6.00 | All as per item No 4. here in before but 25 MM bore tubing. | 258 | RM | 65 ₹16,770 | 40 ₹10,320 Lowest | 40 ₹10,320 Lowest | 48 ₹12,384 | 59 ₹15,222 | 265 ₹68,370 | 40 ₹10,320 Lowest | 45 ₹11,610 |
| 7.00 | All as per item No 4. here in before but 40 MM bore tubing. | 126 | RM | 65 ₹8,190 | 45 ₹5,670 | 40 ₹5,040 Lowest | 52 ₹6,552 | 60 ₹7,560 | 265 ₹33,390 | 47 ₹5,922 | 52 ₹6,552 |
| 8.00 | All as per item No 4. here in before but 50 MM bore tubing. | 156 | RM | 65 ₹10,140 | 45 ₹7,020 Lowest | 70 ₹10,920 | 50 ₹7,800 | 65 ₹10,140 | 65 ₹10,140 | 47 ₹7,332 | 52 ₹8,112 |
| 9.00 | All as per item No 4. here in before but 80 MM bore tubing. | 96 | RM | 110 ₹10,560 | 75 ₹7,200 | 70 ₹6,720 Lowest | 78 ₹7,488 | 110 ₹10,560 | 115 ₹11,040 | 80 ₹7,680 | 90 ₹8,640 |
| 10.00 | All as per item No 4. here in before but 100 MM bore tubing. | 60 | RM | 135 ₹8,100 | 110 ₹6,600 | 140 ₹8,400 | 105 ₹6,300 Lowest | 130 ₹7,800 | 120 ₹7,200 | 112 ₹6,720 | 120 ₹7,200 |
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
6 Jul 2026, 6:00 pmClosed
AGE I AF Kumbhirgram
AGE I AF Kumbhirgram Military Engineer Services PO Kumbhirgram Assam Pin 788109 Tele 03841282376
REPAIR/ MAINTENANCE OF WATER SUPPLY DISTRIBUTION SYSTEM AND MISC WORKS IN DOMESTIC AND TECHNICAL AREA AT AFS KUMBHIRGRAM
2026_MES_774383_1
8778/2026-27/E8
Open Tender
Civil Works
Item Rate
240 days
AF STATION KUMBHIRGRAM
AS PER NIT
8 documents required · 8 mandatory
₹500
AGE I AF Kumbhirgram
₹43,000
Yes
29 Jul 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
6 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exc. 1.5 Mtr wide and not exc 1.50 Mtr in depth for foundation etc. and getting out in soft/loose soil complete all as specified and as directed. | 214.38 | Cum | - | - |
| 2 | Returning filling in soft/loose soil, including spreading, levelling, watering and well ramming in layers not exceeding 25 Cms complete all as specified and as directed. | 190.54 | Cum | - | - |
| 3 | Removing excavated soils to a distance not exc 50 Mtr and depositing where directed at a level not exceeding 1.5 Mtr above the starting point complete all as specified and as directed. | 23.84 | Cum | - | - |
| 4 | Taking out existing 15mm bore galvanized steel tubing and connections from trenches / walls / floors, keeping aside serviceable pipe for reuse and removing unserviceable pipe complete all as specified and as directed. | - | RM | - | - |
| 5 | All as per item No 4. here in before but 20 MM bore tubing. | - | RM | - | - |
| 6 | All as per item No 4. here in before but 25 MM bore tubing. | - | RM | - | - |
| 7 | All as per item No 4. here in before but 40 MM bore tubing. | - | RM | - | - |
| 8 | All as per item No 4. here in before but 50 MM bore tubing. | - | RM | - | - |
| 9 | All as per item No 4. here in before but 80 MM bore tubing. | - | RM | - | - |
| 10 | All as per item No 4. here in before but 100 MM bore tubing. | - | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TenderDoc.pdf
Tender Documents • 0.78 MB
BOQ_867125.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .