Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹324.0 CrAccepted-AOC 19 PARKDRIVE MALIBU TOWN SECTOR 47 SOHNA ROAD GURGAON HARYANA 122001 | GURGAON | GURGAON | HARYANA | 122001 | ₹324.0 Cr Quoted ₹322.3 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹385.2 CrRejected-Finance | ₹385.2 Cr | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹407.2 CrRejected-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | ₹407.2 Cr | L3 | Rejected-Finance Not L1 Bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not meeting NIT qualifying criteria. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not meeting NIT qualifying criteria. |
Tender Value
₹402.9 Cr
EMD Value
₹4.3 Cr
Closing Date
1 Dec 2023, 6:00 pmClosed
AGM Engg.-Civil
Office of Executive Director Engg.-SR CHQ, Airports Authority of India
Development of additional RESA on either end on Runway 10-28 at Calicut Airport. SH Construction of embankment with slope protection, drainage system and associated works for additional RESA on either end on Runway 10-28 -2nd Call
2023_AAI_172997_1
AAI/CHQ/ED(ENGG) SR/Calicut/RESA/2023
Open Tender
Civil Works
570 days
Calicut
Please refer Tender documents.
26 documents required · 26 mandatory
₹11,800
₹4.3 Cr
Yes
19 Apr 2024
3 Nov 2023
2 Dec 2023
4 Nov 2023
1 Dec 2023
20 Nov 2023
4 Nov 2023 - 13 Nov 2023
Amount
Construction of the Project/Work on the Site as set forth in Schedule A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Agreement.
Design, Supply and Installation of approach lighting mast which includes Top 12 meter frangible & tiltable type pole (base mounted / central hinge/ counter balanced type), metallic structure and RCC structure including foundation as per indicative drawings attached. FEA (Finite Element Analysis), Computer Simulation testing for higher height structure to check the structure stability shall also included. a) Approx 47 mtr. Height- 01 Nos. b) Approx 37 mtr. Height- 02 Nos.
Maintenance of the Constructed Project in accordance with the provisions of this Agreement and in conformity with the requirements set forth in Schedule-N Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Agreement for the period of 10 years including DLP of 2 years. Note:- i) Amount to be quoted for 1st year only. ii) Amount for remaning 09 years (2nd to 10th year) shall be automatically calculated by keeping the quoted cost same as 1st year cost.
1st Year (DLP)
2nd Year (DLP) (Auto Calculated)
3rd Year (Indlucing DLP) (Auto Calculated)
4th Year (Indlucing DLP) (Auto Calculated)
5th Year (Indlucing DLP) (Auto Calculated)
6th Year (Indlucing DLP) (Auto Calculated)
7th Year (Indlucing DLP) (Auto Calculated)
8th Year (Indlucing DLP) (Auto Calculated)
9th Year (Indlucing DLP) (Auto Calculated)
10th Year (Indlucing DLP) (Auto Calculated)
KNR Constructions Limited
Dineshchandra R Agrawal Infracon Pvt. Ltd.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid