| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | ₹16.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.3 LRejected-Finance | ₹17.3 L | L2 | Rejected-Finance Rejected,BeingL-2 |
| 3 | L3₹17.5 LRejected-Finance | ₹17.5 L | L3 | Rejected-Finance Rejected,BeingL-3 |
| 4 | L4₹17.6 LRejected-Finance 301 A AWAS VIKAS COLONY DISTRICT PILIBHIT | ₹17.6 L | L4 | Rejected-Finance Rejected,BeingL-4 |
| 5 | Rejected-Technical 16 RAZMAN BAZAR BC CANT LUCKNOW LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | UTTAR PRADESH | 226001 | - | - | Rejected-Technical Being Non Responsive |
| Sl No | Description | Qty | Unit | FEROZ KHAN CONRACTOR L3 | M/S OM BALA JEE CONSTRUCTION L1 | RITESH SAXENA CONTRACTOR L4 | M/S UDDESHYA TRADERS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorney jungle without uprooting as Per directed by Engineer in charge. | 23,914 | Sqm | 4.75 ₹1.1 L | 3 ₹71,742 | 5.12 ₹1.2 L | 5.04 ₹1.2 L |
| 2.00 | Earth work in silt clearance including lift up to 1.50m and lead up to 30.00 mincluding ramming and dressingby manual labour or mechine.The earth from silt clearance to be used in side imbankment or to be disposed off at spoil bank or as Per directed by Engineer in charge | 6,357 | M3 | 94 ₹6.0 L | 85 ₹5.4 L | 92.93 ₹5.9 L | 91.49 ₹5.8 L |
| 3.00 | Supplying and laying Dry stone pitching hand packed also including all cost of material, labour & T&P etc. for proper completion of work as Per directed by Engineer in charge. | 322 | M3 | 2,800 ₹9.0 L | 2,909.89 ₹9.4 L | 2,822.59 ₹9.1 L | 2,778.94 ₹8.9 L |
| 4.00 | Laying C.C.(1:3:6) with P.C.C. Cement, coarse sand and Stone ballast 20 to 40mm also including all cost of material, labour & T&P etc. for proper completion of work as Per directed by Engineer in charge. | 5.6 | M3 | 6,400 ₹35,840 | 6,612.5 ₹37,030 | 6,414.13 ₹35,919.13 | 6,314.94 ₹35,363.66 |
| 5.00 | Class 10 brick work in 1:4 cement and sand mortar up to 3 m. lift and 60 m lead of material also including all cost of material, labour & T&P etc. for proper completion of work as Per directed by Engineer in charge. | 15.6 | M3 | 5,800 ₹90,480 | 5,904.4 ₹92,108.64 | 5,727.27 ₹89,345.41 | 5,638.7 ₹87,963.72 |
| 6.00 | Cement pointing in 1:3 (Struck deep) on Brick masonary with cement sand mortar up to 3 m. hight including cost of all labour, material and T & P etc. | 28.3 | Sqm | 171 ₹4,839.30 | 175.3 ₹4,960.99 | 170.04 ₹4,812.13 | 167.41 ₹4,737.70 |
| 7.00 | Finishing walls with water proofing cement paint of approved made such as super snowcem, Durrocem, Robiacem Guttucem, supermen quality of required shade on uncoated wall surface (two coat) over one coat white cement primer to give even shades after throughly brushing the surface of remove all dirt and remains of loose powdered material also including all cost of material, labour & T&P etc. for proper completion of work as Per directed by Engineer in charge. | 109 | Sqm | 88 ₹9,592 | 91 ₹9,919 | 88.27 ₹9,621.43 | 86.9 ₹9,472.10 |
Tender Value
₹18.2 L
EMD Value
₹38,000
Closing Date
12 Jan 2026, 11:00 amClosed
Executive Engineer ,Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Dandol Drain ke Km. 5.000 se km. 12.070 tak kee Saaf-Safai Avm surkshatmak Karya.
2025_UPIDC_1103043_1
E-Tender Notice No 06/EE/2025-26
Open Tender
Civil Works - Canal
30 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹38,000
Yes
23 May 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Cleaning thick bushes and thorney jungle without uprooting as Per directed by Engineer in charge.
Earth work in silt clearance including lift up to 1.50m and lead up to 30.00 mincluding ramming and dressingby manual labour or mechine.The earth from silt clearance to be used in side imbankment or to be disposed off at spoil bank or as Per directed by Engineer in charge
Supplying and laying Dry stone pitching hand packed also including all cost of material, labour & T&P etc. for proper completion of work as Per directed by Engineer in charge.
Laying C.C.(1:3:6) with P.C.C. Cement, coarse sand and Stone ballast 20 to 40mm also including all cost of material, labour & T&P etc. for proper completion of work as Per directed by Engineer in charge.
Class 10 brick work in 1:4 cement and sand mortar up to 3 m. lift and 60 m lead of material also including all cost of material, labour & T&P etc. for proper completion of work as Per directed by Engineer in charge.
Cement pointing in 1:3 (Struck deep) on Brick masonary with cement sand mortar up to 3 m. hight including cost of all labour, material and T & P etc.
Finishing walls with water proofing cement paint of approved made such as super snowcem, Durrocem, Robiacem Guttucem, supermen quality of required shade on uncoated wall surface (two coat) over one coat white cement primer to give even shades after throughly brushing the surface of remove all dirt and remains of loose powdered material also including all cost of material, labour & T&P etc. for proper completion of work as Per directed by Engineer in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_2034049.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid