Tender Value
₹11.5 L
EMD Value
₹11,500
Closing Date
4 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Asst.Manager (North West Zone )
Work of Supplying & Installation of directional, nomenclature boards & barricading board at Vastrapur area & other different places under MP/MLA/Councillor budget & other Budget in Bodakdev Ward of North West Zone.(ARC) (Reinvite)
298192
T notice 13/2025-26, T. No 115
Open
Civil Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹11,500
21 Apr 2026
21 Apr 2026
21 Apr 2026
4 May 2026
21 Apr 2026
Name of Work :- Work of Supplying & Installation of directional, nomenclature boards &
barricading board at Vastrapur area & other different places under MP/MLA/Councillor
budget & other Budget in Bodakdev Ward of North West Zone.(ARC) (Reinvite)
Item Qty Rate per Amount
Providing and fixing retro Reflective
Engineering grade Board using C.R.C. (M.S.)
Sheet 2mm, angle iron 75 x 75 x 6mm.
Descaling and degreasing the board as per
requirement using epoxyprimer epoxy paint
1 and carrying retro reflactive process by 10.00 12550.96 Sqm
screen painting as directed etc. complete
including transporting and fixing in C.C.
1:4:8 with necessary excavation curing etc.
complete as per I.R.C type design.(A)
Engineer Grade.
Providing and fixing of only type-4 for class
B high intensity Grade Sheeting as per IRC
2 67:2012 reflective sheeting of size including 50.00 2,835.00 sqm
lettering and signs as application( As per
s.o.r year 23-24
Repairing or Removing of Existing Boards
and Re-fixing the same with the help of
required machinery. The Item Rate Includes
Repairing, Welding, Painting etc… Comp
Work As Directed By Engineer In Charge.
The Rate Includes necessary Staging with all
tools and tackles with Required Manpower
Excavation for foundation upto 1.5 m
depth including sorting out and
4 stacking of useful materials and 50.00 77.28 Cu.M.
disposing off the excavated stuff upto
Meter lead.(A) Loose or soft soil
Providing and laying cement concrete 1:2:4
(1- Cement : 2- Coarse sand : 4- graded
5 stone aggregates 20 mm nominal size) 15.00 3,033.80 Cu.M.
and curing complete excluding cost of
formwork in (A) Foundation and Plinth
Providing and fixing MS grill gate elevation
element of decorative pattern with MS
channel flat medium grade Ms pipe square
or round bars with heanded bolts nuts or by
screw incl applying on coat zinc primer and
two coats of oil paint comp
Conveyance charge of earth ,lime,murrum,
building rubbish, manual
7 garbage,sludge,excavated rock ,fly ash, 50.00 140.37 Cu.M
aggregate of any kind etc. comp. Up to
Applying priming coat over new steel and
other metel surface after and including
preparing the surface by throughly cleaning,
8 oil, grease, dirtand other for eignmatter and 100.00 22.89 Smt
scoured with brushes fine steel wood,
scraper sand sand paper with ready mixed
priming paint brushing red lead.
Painting two coats (excluding priming coat)
on new steel and other metal surface
with enamel paint, brushing, interior to
9 give an even shade including cleaning 100.00 57.96 Smt
the surface an even shade including
cleanicn the surface of all dirt, dust and
other foreign matter.
Writing letter or figures on any surface with
black japan paint (stops,comas, hyphens
10 and the like not to be measured and 808.00 2.21
paid for separately) (ii) Indian
(Letters/Figures)
P & F AMC sticker Logo on board as per
instruction of E-I-C.
Prismatic grad reflective sheeting with super
high perfomance durable micro prismatic
material confirming to type XI as per ASTM-
D 4956-09 & cutting pesting letter according
to IRC Standard in Singal language with
micro prismatic confirming to type XI
Painting and lettering the board on both
side of MS sheet with a thickness of 16 mm
gauge and letters by oil paint confirming
13 with 2 coats of red oxide and oil paint Item 101.00 3,500.00 Smt
includes necessary staging carting and
transportation or as directed by engineer in
charge(app.rate)
lettering ( with painting/radium patti)
charges and Printing Muni.corporation
Symbol with help of skilled artist including
(in words also)
CONTRACTOR'S SIGNATURE Add.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
"North West Zone, Zonal Office", Nr. Atithi Hotel, Bodakdev Ahmedabad.
Municipal Commissioner invites Percentage Rate sealed tenders from interested contractors .
1 Name of work Work of Supplying & Installation of directional, nomenclature
boards & barricading board at Vastrapur area & other different
places under MP/MLA/Councillor budget & other Budget in
Bodakdev Ward of North West Zone.(ARC) (Reinvite)
2 Time Limit 12 month
3 Eligibility Criteria Register “E-2” Class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
4 Estimated Cost put to tender Rs.
5 Earnest Money Deposit Rs.11500.00 Demand Draft, Pay order, or Cheque ,Bank Guarantee (As
per finanance circular No 21) in favour of Municipal Commissioner,
Ahmedabad) To be submitted as prescribed in 7.0 below. Demand
Draft or Bank Guarantee shall be from Nationalized Bank and valid for
6 (A) Security Deposit: 5% of Tender Amount but Depends Upon AMC Circular Only.
(B) Retention 1. @ 2% of the value of work done will be deducted from each RA bill.
It will be released along with release of payment of Final Bill.
7 Tender fees Rs.900.00 Demand Draft / Pay order in favour of Municipal
(Non refundable) Commissioner, Ahmedabad)
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager(North West zone) , Ahmedabad Municipal
Corporation, North West Zone, Zonal Office", Nr. Atithi Hotel,
Bodakdev Ahmedabad.
9 Tenders issue date Tenders from the website http://amc.nprocure.com and
http://nprocure.com. shall be down loaded from
10 Last date of receiving Dt.04/05/2026 up to 18:00 Hrs The tenders received after this date
Tenders. and time will not be entertained under any circumstances.
11 Date of Opening Dt.06/05/2026 at 12:00 Hrs to Assistant Manager "North West Zone
Office", Rajmata vijyaraje sindhya bhavan, Near Atithi
hotel,Bodakev,Ahmedabad
12 Mode of sending the Tender Document shall be submitted in sealed envelope systems By RPAD/
Documents Speed post/ Hand Delivery/ Courier in sealed covers as described in
submission of the tender.
13 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall
Specification be applicable.
14 liquidated damages- 10% of the Amount For Balance work After Date of Completion or
Compensation For Delay extended time Limit.
15 Goods & Service Tax (GST) Goods & Service Tax (GST) shall be applicable & bidder should submit
all necessary supporting documents as and when asked by AMC.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all
the tenders without assigning any reasons thereof.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the
tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Add. City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in
the Table below:-
Sr. Name of Works Approximate Bid Security Completio
No. value of works (Rs.) n Period
1 Work of Supplying & Installation of Rs. 1150000.00 Rs.11500.00 12 months
directional, nomenclature boards &
barricading board at Vastrapur area &
other different places under
MP/MLA/Councillor budget & other
Budget in Bodakdev Ward of North West
Zone.(ARC) (Reinvite)
2. Tender (a complete set of bidding document) fee shall be Rs.900/- in the form of Demand
Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad, which shall be non refundable. The fees shall be paid at
the time of submitting the tender.
3. Interested bidders shall download the tender documents from website
http://amc.nprocure.com and http://nprocure.com. tender fee as mentioned in clause
above shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL
CORPORATION, Ahmedabad. Bid Security will have to be in any one of the forms as specified
in Clause of ITB (Instructions to Bidders).
5. All Bids must be delivered to Assistant Manager "North West Zone, Zonal Office", Nr. Atithi
Hotel, Bodakdev Ahmedabad. Not later than 17:00 hrs on Dt.05/05/2026.
Seal and Signature of the Bidder Add. City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall only
apply. Contractor can not stop the work due to on availably of labour force. In case progress is
delayed, contractor shall be penalized 0.1% of Tender amount per day for work done after time
limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills
of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved"
by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall
be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work
is in the form of a designation containing the number of the specification of the material and
prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stone at site of work in a systematic manner. Materials shall be stored in such a manner
as to prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation
of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the
site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion of
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
31. mœh ftb Jtr»tof huRx xuLzh «fthlw Au. mœh ftb btk sYhegt< bwsc ykœts cltJe ftb fhtJJtbt ytJNu <&t ftb mtuÃgt ctœ
rœJmbtk ftbdehe vqKo fhJtle hnuNu.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days
(120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (Five Percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE Add.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Section I – INSTRUCTIONS TO BIDDERS (ITB)
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document
for the construction of works (as defined in these documents, hereinafter referred to as "the Works")
Detailed in the table given in the ITB.
1.2 The Works consist of:
a) “TENDER DOCUMENT FOR : Work of Supplying & Installation of directional, nomenclature boards
& barricading board at Vastrapur area & other different places under MP/MLA/Councillor budget
& other Budget in Bodakdev Ward of North West Zone.(ARC) (Reinvite)
1.3 The works under this Contract shall be carried out in accordance with the bidding documents
constituting the contract and shall consist of various salient items as generally described below:
1.3.1 Road Works
A) Site clearance, removal of tree stumps and dismantling of obstructions etc.before commencement of
B) True and proper setting out and layout of the Works, setting of bench marks, provisions of all
necessary labor with instruments and appliances;
C) Widening and strengthening/reconstruction of the existing carriageway including raising;
D) Any other item of work as may be required to be carried out for completing the road works in all
respects in accordance with the provisions of the Contract.
2. Eligible Bidders
2.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD or AMC or equivalent. If contractor
is not registered with AMC in the relevant class, on award of contract he shall be required to register
himself with AMC within 3 month's time Bidders shall provide such evidence of their continued eligibility
satisfactory to the Employer, as the Employer shall reasonably request.
3. Eligible Material, Equipment and Services
3.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of the
4. Qualification of the Bidder
4.1 To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder.
General information
All individual firms must complete the information in this form. Nationality information shall be provided
for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone / Mobile no:
5 E-mail addresses:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
additional information regarding litigation, debarment, arbitration, etc.
4.2 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any
of the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the AMC as poor performer in implementation of ongoing AMC works
e.g. Works completed after notices issued by AMC or poor quality of work or completed after time
limit or not responsive to Engg.incharge instruction.
d) In case of one contractor remains lowest in most of the such North west Zone grouting work
tenders, then in such case, AMC can award such tender to other contractors.
5 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by
6. Cost of Bidding
6.1 The bidder shall bear all costs associated with the preparation and submission of his bid and
he Employer will in no case be responsible or liable for those costs.
7.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain
for itself on its own responsibility all information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at the
bidder's own expense.
7.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter
its premises and lands for the purpose of such inspection, but only upon the express condition
that the bidder, its personnel and agents, will release and indemnify the Employer and its
personnel and agents from and against all liability in respect thereof and will be responsible for
death or personal injury, loss of or damage to property and any other loss, damage, costs and
expenses incurred as a result of the inspection.
B. Preparation of Bids
8. Language of Bid
8.1 The bid, and all correspondence and documents related to the bid exchanged between the bidder
and the Employer shall be written in the English language. Supporting documents and printed
literature furnished by the bidder may be in another language provided they are accompanied by
an accurate translation of the relevant passages in the English language, in which case, for
purposes of interpretation of the bid, the English translation shall prevail.
9 Documents comprising the Bid
The bids shall be submitted in hard copy and two copies, one marked as “original” and other
marked as “Duplicate”, both of which comprise the following documents:-
Tender Document:
i) Bid Security for an amount as specified in the Invitation for Bids (IFB).
ii) Power of Attorney
iii) Information as specified.
iv) Any other material / information required to be submitted in accordance with these
Instructions to Bidders (ITB).
The Tender Document shall be hard bound. Bid security shall be furnished in “Original” set of
In case of any ambiguity the “Original” set of document shall prevail.
The bidder shall prepare and submit two copies of the bid in original and duplicate.
10.1 Unless stated otherwise in the bidding documents, the Contract shall be for the whole Works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted by the bidder.
10.2 The bidder shall fill in percentage rate above or below and total amount (both in figures and
10.2 The bidder shall fill in percentage rate above or below and total amount (both in figures and
words) for overall items of the Works provided in the Bill of Quantities along with total bid price
derived after application of percentage above or below (both in figures and words). Items (for
which rate has been provided) against which no quantity is entered will be paid for by the
Employer on actual measurement onsite when executed.
Any corrections should be initialed.
All pages of the Bill of Quantities shall be initialed and stamped.
11. Bid Validity
11.1 Bids shall remain valid for a period of 120 days (one hundred twenty days) after the deadline date
for bid submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
11.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request
and the responses there to shall be made in writing or by fax. A bidder may refuse the request
without forfeiting his bid security. A bidder agreeing to the request will not be required or
permitted to modify his bid but will be required to extend the validity of his Bid Security for the
period of the extension, and in compliance with Clause 14 in all respects.
12. Bid Security
12.1 The bidder shall furnish as part of its Bid, a Bid Security in the amount in the Invitation for Bid (IFB)
for particular work(s). The Bid Security shall be drawn in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, and may be in one of the following forms:
a) Deposit-at-call Receipt from any Nationalized / Scheduled Bank approved by the Reserve Bank
of India (RBI).
b) Bank Guarantee from any Nationalized or RBI approved foreign bank having net worth of more
than Rs.500 crore of Indian operation and acceptable to Employer.
The format of Bank Guarantee shall be in accordance with the AMC requirement.
12.2 The Bid Security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as
promptly as possible.
12.3 The Bid Security of the successful bidder, along with second and third lowest tenders, will
be returned when the bidder has furnished the required performance security and signed the
12.4 The Bid Security may be forfeited
a) If the bidder withdraws his bid during the period of bid validity;
b) If the bidder does not accept the correction of his bid price.
c) In the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security ii) sign the Agreement.
13. Format and Signing of Bid
13.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
13.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
13.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
C. Submission of Bids
14.1 The inner and outer envelopes shall
a) Be addressed to the Employer at the following address:
Assistant Manager(New West zone) , "New West Zone Office", Old Vastrapur Nagar Palika
Building, Near Manav Mandir, Vastrapur, Ahmedabad - 380
b) Bear the following identification:
(c) Indicate the name and address of the bidder.
TENDER FOR Work of Supplying & Installation of directional, nomenclature boards & barricading
board at Vastrapur area & other different places under MP/MLA/Councillor budget & other
Budget in Bodakdev Ward of North West Zone.(ARC) (Reinvite)
14.2 If the envelope is not sealed and marked as above, the Employer will assume no responsibility for
the misplacement or premature opening of the bid.
15. Deadline for Submission of Bids
15.1 Bids must be received by the Employer at the address specified above not later than the time and
date specified.
15.2 The Employer may, at his discretion, extend the deadline for submission of bids by issuing an
amendment, in which case all rights and obligations of the Employer and the bidders previously
subject to the original deadline will thereafter be subject to the deadline as extended.
Any bid received by the Employer after the deadline for submission of bids shall not be opened.
17. Modification and Withdrawal of Bids
17.1 The bidder may modify or withdraw his bid after bid submission, provided that written notice of
the modification to the Employer prior to the deadline for submission of bids receives withdrawal.
Any MODIFICATIONS in respect of tender document shall be submitted in separate sealed
envelope duly marked so.
17.2 The bidder's modification or withdrawal notice shall be prepared, sealed, marked and delivered
with the outer and inner envelopes additionally marked "MODIFICATIONS" or "WITHDRAWAL" as
17.3 No bid shall be allowed to modify by the bidder after the deadline for submission of bids.
17.4 Withdrawal of a bid during the interval between the deadline for submission of bids and the
expiration of the period of bid validity may result in the forfeiture of the Bid deposit.
D. Bid Opening and Evaluation
18 Opening of Tender (Bid)
18.1 The Employer will open the outer envelope of all the bids received for the package (except those
received late) containing the sealed Tender volume and announce the names of (i) bidders, (ii)
bidders who have submitted modification of Tender bids, and (iii) bidders who have given notice
for withdrawal of their bids in the presence of bidders or their representatives who choose to
attend on the date and time mentioned in the ITB. In the event of specified date of bid opening
being declared as a holiday for the Employer, the Tender will be opened at the appointed time and
location on the next working day.
18.2 Bids for which acceptable notice of withdrawal has been submitted pursuant to Clause mentioned
previously shall not be opened.
18.3 Bidders detail and Tender fee, E.M.D. shall be opened first. The Employer at the opening will
announce bidder’s names, ‘Modification of Tender’, the presence/or absence of Bid Security, the
amount and validity of Bid Security furnished with each bid, is valid registration and such other
details, as the Employer may consider appropriate.
18.4 The bidders or their representatives who are present shall sign attendance sheet evidencing their
18.5 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
including the information disclosed to those present in accordance with Clause mentioned
19. Examination of Tender and Determination of Responsiveness of Tender
19.1 If the Bid Security furnished does not conform to the amount and validity period as specified in
the Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the
Employer as non-responsive.
19.2 Subject to confirmation of the Bid Security by the issuing bank, the Tender volume accompanied
with valid Bid Security will be taken up for further evaluation. In case, the Bank does not confirm
the Bid Security, the bid shall be rejected as non-responsive and no further evaluation carried
19.3 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified in
the bid documents and is substantially responsive to the requirement of the bidding documents
and provides any clarification for ascertaining the correctness of the information/details that the
Employer may require.
19.4 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will
not subsequently be made responsive by correction or modification or withdrawal of the non-
conforming deviation or reservation.
20. Opening of Tender
20.1 The Employer will open the Tender volume of those bidders whose document has been
determined to be substantially responsive in accordance and who have the required available bid
capacity, in presence of the bidders or their representatives who choose to attend on the date
intimated to such bidders. In the event of specified date of Tender volume opening being declared
a holiday for Employer, the ‘Tender volume’ shall be opened at the appointed time and location
on the next working day.
20.2 The names of the bidders whose Tender volume is found to be substantially responsive, the bid
prices, the total amount of each bid, any discount, ‘modifications of B.O.Q and such other details,
prices, the total amount of each bid, any discount, ‘modifications of B.O.Q and such other details,
as the Employer may consider appropriate will be announced by the Employer at the opening of
the Tender volume. Any bid price, which is not read out and recorded at the bid opening, will not
be taken into account in Bid Evaluation.
20.3 The bidders or their representatives who are present shall sign attendance sheet evidencing their
20.4 The Employer shall prepare besides the record of bid opening, minutes of the Tender volume
opening including the information disclosed.
21. Examination of Bids and Determination of Responsiveness of Bid
21.1 The Employer will determine responsiveness of each Tender volume with respect to filled
percentage above or below of total amount of Priced Bill of Quantities, Technical Specifications,
percentage above or below of total amount of Priced Bill of Quantities, Technical Specifications,
Drawings and other relevant requirement of bidding documents.
21.2 A substantially responsive Tender volume is one which conforms to all the terms, conditions and
specifications of the bidding documents, without material deviation or reservation. A material
deviation or reservation is one (i) which affects in any substantial way the scope, quality or
performance of the Works; (ii) which limits in any substantial way, inconsistent with the bidding
documents, the Employer's rights or the bidder's obligations under the Contract; or (iii) whose
rectification would affect unfairly the competitive position of other bidders presenting
substantially responsive Tender volume.
21.3 If the Tender volume is not substantially responsive, it will be rejected by the Employer and may
not subsequently be made responsive by correction or withdrawal of the non-conforming
deviation or reservation.
22. Correction of Errors
22.1 Tender volume determined to be substantially responsive will be checked by the Employer for any
arithmetic errors. Arithmetic errors will be rectified on the following basis:-
i) Where there is a discrepancy between the figures and words, for % and amount, the figure in
words will govern and
ii) Where there is discrepancy in total amount arrived by addition of percentage (above or below),
ii) Where there is discrepancy in total amount arrived by addition of percentage (above or below),
the amount arrived by addition percentage (above or below) as written in word shall govern.
22.2 The amount stated in the Form of Bid will be adjusted by the Employer in accordance with the
above procedure for the correction of errors and shall be considered as binding upon the bidder.
If the bidder does not accept the corrected amount of bid, his bid will be rejected, and his Bid
Security may be forfeited.
23. Evaluation and Comparison of Tender volume
23.1 The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 23 and qualified for award of Contract.
23.2 In evaluating the Tender volume, the Employer will determine for each Tender volume the
valuated Bid Price by adjusting the Bid Price as follows:-
a) Making any correction for errors;
b) Making appropriate adjustments to reflect any price modifications offered.
23.3 If the Bid of the successful Bidder is seriously unbalanced or extremely higher / lower in relation
to the Employer’s estimate of the cost of the items of the Works to be performed under the
Contract, the Employer may require the bidder to produce detailed price rate analysis for any or
all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the
construction methods and schedule proposed. In case, AMC finds rates extremely below
estimated SOR rate or Market Rate than Tender shall be rejected and second lowest tenderer may
be awarded the work.
23.4 A bid, which is unrealistically lower then estimate and which the bidder, could not substantiate
satisfactorily, may be rejected as non-responsive.
24 Clarification of Bids
24.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished
by him in his bid. Such request by the AMC and the response by bidder shall be in writing or by
cable/fax, but no change in the price or substance of the bid shall be sought, offered or permitted
except as required to confirm the correction of arithmetical errors discovered by the Employer in
the evaluation of the bids.
24.2 No bidders shall contact the AMC staff on any matter relating to his bid from the time of bid
opening to the time contract is awarded.
24.3 Any effort by the bidder to influence the the AMC staff in the bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
25.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has
been announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
F. Award of Contract
26.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated Bid
Price provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of previous Clauses and (ii) qualified in accordance with the provisions of previous
27. Employer's Right to accept any Bid and Reject any or all Bids
27.1 The Employer reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids, at any time prior to award of Contract, without thereby incurring any liability to the
affected bidder or bidders or any obligation to inform the affected bidder or bidders of the
grounds for the Employer's action.
28. Notification of Award
28.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will
notify the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter (hereinafter and in the Conditions of Contract called "the Letter of
Acceptance") shall name the sum which the AMC will pay the Contractor in consideration of the
execution, completion and maintenance of the Works by the Contractor as prescribed by the
Contract (hereinafter and in the Conditions of Contract termed "the Contract Price").
28.2 The notification of award will constitute the formation of the Contract.
29. Signing of Agreement
29.1 At the same time that the Employer notifies the successful bidder that his bid has been accepted,
the Employer will direct him to submit the Performance Security and attend the Employer's office
on a date determined by the Employer for signing the Form of Agreement.
30. Performance Security
30.1 Within 10 (Ten) days of the date of receipt of the Letter of Acceptance, the successful bidder shall
deliver to the Employer, a Initial Performance Security in the form of a Bank Guarantee for an
amount equivalent to 5% (five percent) of the Contract Price plus additional security for
unbalanced bids in accordance with relevant Conditions of Contract.
30.2 The Performance Security to be provided by the successful bidder in the form of a bank guarantee
as per format shall be issued from any Nationalized / Scheduled bank.
31. Corrupt or Fraudulent Practices
31.1 The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question.
The Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to
be awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines
that the firm has engaged in corrupt or fraudulent practices in competing for the contract, or
during execution.
i) “corrupt practice” means behavior on the part of officials in the public or private sectors by
which they improperly and unlawfully enrich themselves and/or those close to them, or induce
others to do so, by misusing the position in which they are placed, and it includes the offering,
giving, receiving, or soliciting of anything of value to influence the action of any such official in the
procurement process or in contract execution; and
ii) “fraudulent practice” means a misrepresentation of facts in order to influence a procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits of free and open
Seal and Signature of the Bidder Add. City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Section II - CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be Initialed by
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Vol. V.
5. The scope of work, project description mentioned in the document is indicative and is likely to
change during detail design. Project brief, along-with the schematic drawings and colored
photographs, is provided to assist the bidder in understanding the fundamental and specific
requirements of the project.
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms.
Information other than that related to this work shall not be considered for evaluation.
9. If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable
for disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria will
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or
are conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and contract
without assigning any reason thereof.
14. DEFECTS: For completion of any work/ part thereof, contractor will be required to request in
writing, to get completion certificate from Additional City Engineer . Date of completion for start
of defect liability period will be considered as the date mentioned in the completion certificate.
The contractor shall be required to make good all the damages / defects identified and
conveyed to him, during the entire defect liability period. The method and time limit of
rectification will be decided by the Engineer in charge. If he fails to carry out rectification as per
the instructions, the same will be carried out at his cost and it shall be recovered from the
amount retained.
16. All the material and other test expenses shall be borne by the contractor. Contractor shall have to
provide vehicle and other communication facilities to visit plant and testing laboratory.
17. Contractor shall have to make his own arrangements for water and electricity for the purpose of
construction work at site at his own expense.
18. If the contractor fails to execute the said works within prescribed time limit, the said work will be
carried out at the risk and cost by other contractors with 20 % supervision charges as may be
decided by the Additional City Engineer.
19. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic
blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent
marking on traffic signs to be provided so that it should be visible at night. During night working
hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signage, safety cones, traffic blinkers,
barricading tapes, red and green flags/lights etc for making easy smooth and safe conditions for
the traffic. The Contractor shall and must provide above at his own cost. If the Contractor fails
to comply this clause, Rs. 500/- per day shall be recovered from his bill.
20. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT, govt.duties
etc. on material procurement or any other component for the works from any source shall be
borne by the contractors.
21. Submission of project schedule:
Contractor has to submit the following documents along with the qualification data of the tender
failing in which shall lead to rejection of the tender.
Contractor shall submit the detailed Project schedule showing break up for the various tasks to be
performed in order of their occurrence during the project in Microsoft Project/Prima Vera format.
22 For Flakiness and Elongation Index norms adopted by AMC shall be made applicable.
23. For non-bituminous, bituminous and concrete works, the black trap aggregates of required size shall
be procured from quarry situated in Sevaliya / Timba region or equivalent. Prior approval of source/
material by Additional City Engineer shall be required.
24. Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing laws
as well as framed from time to time). Any penalties laid due to violation of such laws shall be directly
deducted from the contractor's outstanding.
25. As per St. Committee's resolution 0.5% testing charges shall be deducted from each R.A.Bill and
the amount of actual Testing charges shall be adjusted in the final bill.
26. Special Clause: As per construction works welfare cess Act – 1996 non-refundable one percent
of tender amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Add. City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
(The Appendix forms part of the Bid. Bidders are required to fill up all the blanks in the form of Bid)
NAME OF THE CONTRACT: Work of Supplying & Installation of directional, nomenclature boards &
barricading board at Vastrapur area & other different places under MP/MLA/Councillor budget &
other Budget in Bodakdev Ward of North West Zone.(ARC) (Reinvite)
Add.City Engineer (North West Zone)
"North West Zone, Zonal Office",
Nr. Atithi Hotel,
Ahmedabad. Gujarat
1. Having examined the Conditions of Contract, Specifications, Bill of Quantities, Drawings
and Addenda No._______ for the execution of the above named works, we, the undersigned,
offer to execute and complete such works and remedy any defects therein in conformity with
the Conditions of Contract, Specifications, Bill of Quantities, Drawings and Addenda for the
My/our offer works out as under:
Amount put to tender _________ Amount put to tender Rs. _______________
Net Amount Net Amount
2. We acknowledge that the Appendix to Bid forms part of our Bid.
3. We undertake, if our Bid is accepted, to commence the Works on Site within the period stated
in the Appendix to Bid hereto after receipt of an order of the Engineer’s notice to commence,
and to complete and deliver the sections and the whole of the Works comprised in the
Contract within the period stated in the Appendix to Bid hereto.
4. If our Bid is accepted, we will furnish Performance Security (ies) in the form of Bank
Guarantee(s) to be jointly and severally bound on us in accordance with the Conditions of
5. We agree to abide by this Bid for the period of one hundred and twenty (120) days after the
date of bid opening, and it shall remain binding upon us and may be accepted at any time
before the expiry of that period.
6. Unless and until a formal Agreement is prepared and executed, this Bid, together with your
written acceptance thereof, shall constitute a binding contract between us.
7. We understand that you are not bound to accept the lowest or any Bid you may receive.
8. All the partners of our Joint Venture are legally and severally bound by this Bid1.
9. Municipal Commissioner, Ahmedabad has right to reject any or all bids without giving any
Dated this ____________ day of _______________
in the capacity of __________________ duly authorised2 to sign Bid for and on behalf of
Address (in block capitals)
1. To be deleted if the bidder is not a Joint Venture.
Certified copy of Power of Attorney/Authorization for signature shall be furnished by the Bidder in
accordance with Clause 20 of Instruction to Bidders (Section I).
Seal and Signature of the Bidder Add.City Engineer
(North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 month period after the order to start the works. Progress of work should be in proportion
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall arrange for
barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for any damage to public. If
any incident happen, during the execution of work. In case of dispute for unseen or overlooked items the decision of the Add.
City Engineer shall be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the rejected materials shall be
removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to prepare through of
bigger size and mix the mortar in the required proportion. In on case he shall be allowed to mix the mortar either on floor or
any finished surfaces. The contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall be paid at
the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in SOR than based on current
market rates. In case of extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the contractor
shall carry out the same at his quoted rates without charges any extra and the contractor will have to carry out the works and
he will be paid at the rate quoted by him. No claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to prepare the
measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully responsible for
compliance of the various provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for this work and
that the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If any tenderer
withdraw or makes any modifications or addition in the terms and conditions of his tender not acceptable to the Municipal
Corporation the Municipal Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty of Rs.- (As
per Form - B1) per day of delay shall be recovered from the immediate bills payable to the contractor. Contractor has to make
his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can be is available
in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building Works & and Road Works
Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE Add.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
NORTH WEST ZONE
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour
Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the
guide lines. If child labour is employed on the site work, the contractor shall have to deposit Rs.
(Rupees Tw enty thousand only) in the child labour welfare fund. If the employer refuses to deposit then
action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal Corporation shall
recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso.
No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing
charge is taken and the remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No.
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and
has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be
entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by
A.M.C. The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along
with the tender duly signed. These shall form a part of tender. The tenderer shall not add or amend the text of
any of the documents except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of
the contract documents. The full consideration shall be given to such addendum or corrigendum or correction
before submission tender duly filled in by the contractor. Therefore, the contractor shall have to watch such
addendum or corrigendum or correction published by A.M.C through its website www.egovamc.com.
Tenderes shall verify the number of addendum issued and enclose the same with the tender documents,failing
which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under
any circumstances.
CONTRACTOR'S SIGNATURE Add.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
NORTH WEST ZONE
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SPECIFICATIONS OF MATERIALS – CIVIL
This section gives detail specifications for mainly used materials, for other materials refer Building
Specifications.
For materials relevant specification of Building Specificat shall apply.
TECHNICAL SPECIFICATIONS
NAME OF THE WORK : Work of Supplying & Installation of directional, nomenclature boards &
barricading board at Vastrapur area & other different places under
MP/MLA/Councillor budget & other Budget in Bodakdev Ward of North
West Zone.(ARC) (Reinvite)
WORKS SHALL DONE AS PER REQUIREMENT, DIRECTION OF ENGG. IN CHARGE WITH
RELATED TO SITE AND CONFIRMATION TO MORTH HAND BOOK AND RELEVANT IS
ITEM No.1 Providing and fixing retro Reflective Engineering grade Board using C.R.C. (M.S.)
Sheet 2mm, angle iron 75 x 75 x 6mm. Descaling and degreasing the board as per
requirement using epoxyprimer epoxy paint and carrying retro reflactive process by
screen painting as directed etc. complete including transporting and fixing in C.C. 1:4:8
with necessary excavation curing etc. complete as per I.R.C type design.(A) Engineer
The rate shall be for a unit Per Sqm. The Item Rate Includes necessary fixing of MS Pole of
structure design of required height as per Instruction of Engineer in Charge . The Rate Also
includes fixing with necessary excavation and fixing of Required Size board at a depth of
45cmx45cmx60 cm pit size in concreting work. The Retro Reflective Engineering grade sheet
design should be initially submitted to engineer in charge for verification and should be then
pasted to ms sheet as instructed. The Rate also includes necessary manpower with all tools
and tackles with transporation to and fro site to site. The contractor should manage necessary
electricity power, water and all necessary equipments for fixing of board at site.
The rate shall be for a unit of one smt.
ITEM No.2 Providing and fixing of only type-4 for class B high intensity Grade Sheeting as per IRC
67:2012 reflective sheeting of size including lettering and signs as application( As per s.o.r
The rate shall be for a unit Per Smt.
ITEM No.3 Repairing or Removing of Existing Boards and Re-fixing the same with the help of
required machinery. The Item Rate Includes Repairing, Welding, Painting etc… Comp
Work As Directed By Engineer In Charge. The Rate Includes necessary Staging with all
tools and tackles with Required Manpower at any Height.
The rate shall be for a unit Per Job
Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to
M-6, Grit shall conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to
1.1 The concrete mix is not required to be designed by preliminary tests. The proportion of
the concrete mix shall be 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate
mm nominal size) by volume. Concrete work shall have exposed concrete surface or as
specified in the item.
1.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S
Correspond approximately to 1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary
concrete by volume respectively.
1.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg.
by weight (0.0342 Cu. M) for different proportions of mix shall be as under:
Grade of Total quantity of dry Proportion of fine Qty of
concrete aggregate by volume aggregate to coarse water per
per 50 Kgs, of cement aggregate 50 Kgs. of
to be taken as the sum cement
of individual volume maximum
of fine and coarse
aggregates, maximum
M-100 (1:3:6) 300 Liters Generally 1:2 for fine
aggregate by volume
but subject to and
upper limit of 1:1/2
and lower limit 1:3
1.4 The water cement ratios shall not more than those specified in the above table. The
cement content of the mix specified in the Table shall be increased if the quantity of
water in a mix has to be increased to overcome the difficulties of placement and
compaction so that the water cement ratio specified in the Table is not exceeded.
1.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that
is bound to give a concrete mix which is just sufficiently wet to be placed and
compacted without difficulty with the means available.
1.6 the maximum size of coarse aggregate shall be as large as possible within the limits
specified but in no case greater than surround all reinforcement thoroughly and to fill
the corners of the form.
1.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are
generally considered satisfactory.
1.8 For heavily reinforced concrete members as in the case of ribs of main beams the
nominal maximum size of coarse aggregate should usually be restricted to 5 mm less
than the minimum clear distance between the main bars, or 5 mm less than the
minimum cover to the reinforcement whichever is smaller.
1.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the
aggregate may not be important and the nominal maximum size may sometimes be as
greater than the minimum cover.
1.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon
the evidence that with the passage of time, neither the compressive strength of concrete
is reduced nor are other requisite qualities of concrete and steel impaired by the use of
such admixtures.
2.0 Workmanship:
2.1 Proportioning: Proportioning shall be done by volume, except cement which shall be
measured in terms of bags of 50 Kg. weight. The volume of one such bag being taken as
0.0342 Cu. Meter. Boxes of suitable sizes shall be used for measuring sand aggregate.
The size of the boxes (internal) shall be 35 cms x 25 cms. and 40 cms deep. White
measuring the aggregate and sand, the box shall be filled without shaking ramming or
hammering. The proportioning of sand shall be on the basis of its dry volume and in
case of damp sand, allowances for bulkage shall be made.
2.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other
accessories shall be kept in first class working condition and so maintained throughout
the construction. Measured quantity of aggregate, sand, cement required for each batch
shall be poured into the drum of the mechanical mixer while it is continuously running.
After about half a minute of dry mixing, measured quantity of water required for each
batch of concrete mix shall be added gradually and mixing continued for another one
and half a minute. Mixing shall be continued till materials are uniformly distributed and
uniform color of the entire mass is obtained and each individual particle of the coarse
aggregate shows complete coating of mortar containing its proportionate amount of
cement. In no case shall the mixing be done for less than 2 minutes after all ingredients
have been put into the mixer.
2.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain
other reasons, it shall be done on the smooth watertight platform large enough to allow
efficient turning over the ingredients of concrete before and after adding water. Mixing
platform shall be so arranged that no foreign material gets mixed with concrete nor does
the mixing water flow out. Cement in required number of bags shall be placed in a
uniform layer on top of the measured quantity of fine and coarse aggregate, which shall
also be spread in a layer of uniform thickness on the mixing platform. Dry coarse and
fine aggregate and cement shall then be mixed thoroughly by turning over to get a
mixture to uniform color. Specified quantity of water shall then be added gradually
through a rose-can and the mass turned over till a mix of required consistency is
obtained. In hand mixing quantity of cement shall be increased by 10 percent above that
2.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly
cleaned before putting in a new batch. Unless otherwise agreed to by the Engineer-in-
charge the first batch of concrete from the mixture shall contain only two thirds of
normal quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned before
changing from one type of cement to another.
2.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods
of vibration of concrete, shall be determined by regular slump tests in accordance with
I.S. 1199-1959. The slump of 10mm to 25mm. shall be adopted when vibrators are used
and 80mm when vibrators are not used.
2.4 Inspection:
2.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in
the forms to permit him to inspect and accept the false work and forms as to their
strength, alignment, and general fitness but such inspection shall not relieve the
contractor of his responsibility for the safety of men, machinery, materials and for
results obtained. Immediately before concreting, all forms shall be thoroughly cleaned.
2.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge.
One carpenter with helper shall invariably be kept present throughout the period of
concreting. Movement of labour and other persons shall be totally prohibited for
reinforcement laid in position. for access to different parts, suitable mobile platforms
shall be provided so that steel reinforcement in position is not disturbed. For ensuring
proper cover, mortar blocks of suitable size shall be provided so that steel reinforcement
in position is not disturbed. For ensuring proper cover, mortar blocks of suitable size
shall be cast and tied to the reinforcement. Timber kapachi or metal pieces shall not be
used for this purpose.
2.5 Transporting and laying:
2.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be
so transported and placed that no contemination, segregation or loss of its constituent
material takes place.
All form wok shall be cleaned and made free from standing water, dust, show or ice
immediately before placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-
charge has been obtained.
2.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh
concrete shall not be placed against concrete which has been in position for more than
30 minutes unless a proper construction joint is formed. Concrete shall compacted in its
final position within 30 minutes of its discharge from the mixer. Except where
otherwise agreed to by the Engineer-in-charge concrete shall be deposited n horizontal
layers to a compacted depth of not more than 0.45 meter when internal vibrators are
used and not exceeding 0.30 meter in all other cases.
2.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped
into place from a height exceeding 2 meters. When trunking or chutes are used they
shall be kept close and used in such a way as to avoid segregation. When concreting has
to be resumed on a surface which has hardened, it shall be roughened, swept clean,
thoroughly wetted and covered with a 13 mm thick layer of mortar composed of cement
and sand in the same ratio as in the concrete mix itself. This 13 mm layer of mortar shall
be freshly mixed and placed immediately before placing of new concrete. Where
concrete has not fully hardened, all laitance shall be removed by scrubbing the wet
surface with wire or bristle brushes, care being taken to avoid dislodgment of any
particles of coarse aggregate. The surface shall then be thoroughly wetted, all free water
removed and then coated with neat cement grout. The first layer of concrete to be
placed on this surface shall not exceed 150 mm in thickness and shall be well rammed
against old work particular attention being given to corners and close spots.
2.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the
assistance of vibrators, unless, otherwise permitted by the Engineer-in-charge for
exceptional cases, such as concreting under water, where vibrators cannot be used.
Sufficient vibrators in serviceable condition shall be kept at site so that spare equipment
is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be
completed before the initial setting starts i.e. within 30 minutes of addition of water to
dry mixture. During compaction, it shall be observed that needle vibrators are not
applied on reinforcement which is likely to destroy the bond between concrete and
2.6 Curing: Immediately after compaction, concrete shall be protected from weather
including rain, running water, shocks, vibration, traffic, rapid temperature changes, frost
and drying out process. It shall be covered with wet sacking, hassain or other similar
absorbant material approved, soon after the initial set and shall be kept continuously wet
for a period of not less than 14 days from the date of placement. Masonary work over
foundation concrete may be started after 48 hours of its laying but curing of concrete
shall be continued for a minimum period of 14 days.
2.7 Sampling and Testing of concrete:
2.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be
made, cured and tested at 7 days or 28 days as per requirements in accordance with I.S.
516-1959. A random sampling procedure shall be adopted to ensure that each concrete
batch shall have a reasonable chance of being tested i.e. the sampling should be spread
over the entire period of concreting and cover all mixing units. The minimum frequency
of sampling of concrete of each grade shall be in accordance with following:
Quantity of concrete No. of Quantity of concrete in No. of
in the work samples the works samples
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made
from each sample, five for testing at 7 days and the remaining five at 28 days. The
samples of concrete shall be taken on each day of the concreting as per above
frequency. The number of specimens may be suitably increased as deemed necessary by
the Engineer-in-charge when procedure of tests given above reveals a poor quality of
concrete and in other special cases.
2.7.2 The average strength of the group of cubes cast for each day shall not be less than the
specified cube strength of 150 Kg/Cm2 at 28 days. 20% of the cubes cast for each day
may have value less than the specified strength provided the lowest value is not less
than 85% of the specified strength. If the concrete made in accordance with the
proportions given for a particular grade, does not yield the specified strength; such
concrete shall be classified as belonging to the appropriate lower grade. Concrete made
in accordance with the proportions given for a particular grade shall not, however, be
placed in a higher grade on the ground that the test strength are higher than the
minimum specified.
2.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention
to strike the form work. While fixing the time for removal of form work, due
consideration shall be given to local conditions, character for the structure, the weather
and other condition that influence the setting of concrete and of the materials used in the
mix. In normal circumstances (generally where temperatures are above 200 C) and
where ordinary concrete is used, forms may be struck after expiry of periods specified
in item No 9.1(A) for respective item of form work.
2.8.2 All form work shall be removed without causing any shock or vibration as would
damage the concrete. Before the soffit and struts are removed, the concrete surface shall
be exposed, where necessary in order to ascertain that the concrete has sufficiently
hardened. Centering shall be gradually and uniformly lowered in such manner as to
permit the concrete to take stresses due to its own weight uniformly and gradually.
Where internal metal ties are permitted, the or their removable parts shall be extracted
without causing any damage to the concrete and remaining holes filled with mortar. No
permanently embedded metal part shall have less than 25 mm cover to the finished
concrete surface. Where it is intended to re-use the form work, it shall be cleaned and
made good to the satisfaction of the Engineer-in-charge. After removal of form work
and shuttering, the Executive Engineer shall inspect the work and satisfy by random
checks that concrete produced is of good quality.
2.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the
cement concrete member and used for shuttering or any other purpose shall be cut
inside the cement concrete member to a depth of at least 25 mm below the surface of the
concrete and the resulting holes be filled by cement mortar. All fine caused by form
joints, all cavities produced by the removal of form ties and all other holes and
depressions honeycomb spots, broken edges or corners and other defects shall be
thoroughly cleaned, saturated with water and carefully pointed and rendered true with
mortar of cement and fine aggregate mixed in the proportions used in the grade of
concrete that is being finished and of as dry consistency as is possible to use.
Considerable pressure shall be applied in filling and pointing to ensure thorough filling
in all voids. Surfaces which are pointed shall be kept most for a period of 25 hours.
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or
character as to effect the strength of the structure materially or to endanger the life of
the steel reinforcement, he may declare the concrete defective and require the removal
and replacement of the portion of the structure affected.
3.0 Mode of measurement and payment:
3.1 The consolidated cubical contents of concrete work as specified in item shall be
measured. The concrete laid in excess of section shown on drawings or as directed shall
not be measured. No deduction shall be made for –
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline
trusses, corbels and steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
3.2 The rate includes cost of all materials, labour, tools and plant required for mixing,
placing in position, vibrating and compacting, finishing, as directed, curing and all other
incidental expenses for producing concrete of specified strength. The rate excludes the
cost of form work.
3.3 The rate shall be for a unit of one cubic meter.
ITEM No.4 Excavation for foundation upto 1.5 m depth including sorting out and stacking
of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft
The rate shall be for a unit Per Cmt.
ITEM No.5 Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded
stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth.
The rate shall be for a unit Per Cum.
ITEM No.6 Providing and fixing MS grill gate elevation element of decorative pattern with MS
channel flat medium grade Ms pipe square or round bars with heanded bolts nuts or by screw incl
applying on coat zinc primer and two coats of oil paint comp.
The rate shall be for a unit Per kg.
ITEM No.7 Conveyance charge of earth ,lime,murrum, building rubbish, manual
garbage,sludge,excavated rock ,fly ash, aggregate of any kind etc. comp. Up to 5.0 Km. lead.
The rate shall be for a unit Per Cum.
ITEM No.8 Applying priming coat over new steel and other metel surface after and including
preparing the surface by throughly cleaning, oil, grease, dirtand other for eignmatter and scoured
with brushes fine steel wood, scraper sand sand paper with ready mixed priming paint brushing
The rate shall be for a unit Per Smt.
ITEM No.9 Painting two coats (excluding priming coat) on new steel and other metal surface
with enamel paint, brushing, interior to give an even shade including cleaning the surface an
even shade including cleanicn the surface of all dirt, dust and other foreign matter.
The rate shall be for a unit Per Smt.
ITEM No.10 Writing letter or figures on any surface with black japan paint (stops,comas,
hyphens and the like not to be measured and paid for separately) (ii) Indian
(Letters/Figures).
The rate shall be for a unit Per Per Letter Per Cm/Ht.
ITEM No.11 P & F AMC sticker Logo on board as per instruction of E-I-C.
The rate shall be for a unit Per Nos.
ITEM No.12 Prismatic grad reflective sheeting with super high perfomance durable micro
prismatic material confirming to type XI as per ASTM-D 4956-09 & cutting pesting letter according
to IRC Standard in Singal language with micro prismatic confirming to type XI.
The rate shall be for a unit Per Smt.
ITEM No.13 Painting and lettering the board on both side of MS sheet with a thickness of 16 mm
gauge and letters by oil paint confirming with 2 coats of red oxide and oil paint Item includes
necessary staging carting and transportation or as directed by engineer in charge(app.rate).
The rate shall be for a unit Per Smt.
ITEM No.14 lettering ( with painting/radium patti) charges and Printing Muni.corporation Symbol
with help of skilled artist including colour cost.
The rate shall be for a unit Per No.
CONTRACTOR'S SIGNATURE Add.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions will be
Contractor has to Submit Before after work photos of all works in soft & hard copies as
with time and location stamp in Google map camera app or other different similar apps.
Seal and Signature of the Bidder Add. City Engineer
Date: (North West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender 115 Board.pdf
Abs Tender 115.pdf
Download all tender documents and submit your bid