Tender Value
₹189.5 Cr
EMD Value
₹1.9 Cr
Closing Date
15 Sept 2026, 9:30 pm
Minor Irrigation Department
PARASHURAM
9741502354
9741502354
FILLING UP WATER BODIES (16 TANKS) OF JAVANAGONDANAHALLI HOBLI AND GAYATHRI RESERVOIR FOR DRINKING WATER PURPOSE AND GROUND WATER DEVELOPMENT IN HIRIYUR TALUK OF CHITRADURGA DISTRICT including Detailed Investigation & Conducting Survey, Design and Construction of Civil Works such as Intake arrangement, Jack well cum Pump house, Watchman room, approach road, chain link fencing & gate for Pump house yard and Design, supply and installation of Electro Mechanical components such as required capacity of Pumps and Motors, installation of 66 KV Switch Yard, 66/6.6 KV Terminal Bay, 66KV Transmission line and Design, supply and laying of MS/HDPE Rising main Pipeline and Pressure Distribution Network canal crossing, road crossing, railway crossing / high way crossing by pipe jacking/horizontal drilling method, road restoration, utility shifting, Surge analysis, Tanks improvement works & Facilitating for land acquisition, Crop compensation, obtaining permissions from concerned Departments and other statutory clearance from the competent authorities for the successful running of Tank filling scheme for Filling of Water to the designated Tanks, & other allied components including operation & maintenance for a period of Five years after successfully commissioning of the scheme on Turnkey basis.
MI/2026-27/LI/WORK_INDENT12605
MI/2026-27/LI/WORK_INDENT12605
Open
Lift Irrigation Scheme
Two Tender Document System(Two Cover)
Minor Irrigation Division Chitradurga
7 documents required · 7 mandatory
3.2.C.4. The intending bidder should have erected, tested and commissioned substation of a minimum capacity of 66Kv with transmission line for a minimum length of 10.4 KM in one during last five years (2021-22 to 2025-26), work done certificate should be obtained duly signed from an Officer not below the rank of Executive Engineer of the concerned division.
ITT 3.2 B.To qualify for award of this contract, each tenderer in his name should have in the last five years Period (2021-22 TO 2025-26) B) Satisfactory completion as a prime contractor for at least one similar work such as Tank Filling Scheme/Lift irrigation scheme of value not less than Rs 9477.16 Lakhs (Upload scan copy of work done Certificate report issued by the employer not below the rank of Executive Engineer of the concerned division.)
3.2.C.1 Supplying, laying, testing and commissioning of MS pipes with Polyurethane/epoxy Coating inside and outer guniting with CM 1:3 mortar for Rising main / Pressure main for a length covering the of minimum outer Dia of 900 mm for a total Length of 19.15 Km in a single year during last five years (2021-22 to 2025-26) .the work done certificate should be obtained duly signed from an Officer not below the rank of Executive Engineer of the concerned division
3.2.C.2.Supplying, laying and testing and commissioning of HDPE pipes for Rising Main and Pressure Main of minimum outer Dia of 315mm for a total Length of 8.36 Km in a single year during last five years (2021-22 to 2025-26) the work done certificate should be obtained duly signed from an Officer not below the rank of Executive Engineer of the concerned division.
3.2.C.3The intending bidder should have supplied, erected, tested and commissioned VT pumps of minimum 04 Numbers of pumps of minimum 1600 HP capacity in one year in his last five years (2021-22 to 2025-26), The work done certificate should be obtained duly signed from an Officer not below the rank of Executive Engineer of the concerned division
3.3Each Tenderer should further demonstrate, (a) Availability by owning at least 50% of the required/ specified key and critical equipment for this work and the remaining 50% can be deployed on lease/ hire basis for all works provided, the relevant documents (Commitment agreements, RC book, Purchase invoice, sale deed, hire/lease deed, latest B-extracts, latest insurance copy etc.,) for availability for this work are furnished. Excavator-4-OWN-02, HIRE/LEASE-02, Lorry / Tipper-4-OWN-02, HIRE/LEASE-02, Concrete mixer-4-OWN-02, HIRE/LEASE-02, Power Roller/Earth compactor-2-OWN-01, HIRE/LEASE-01, Crane-04-OWN-02 ,HIRE/LEASE-02
In addition to section3 of ITT the bidder should furnish the details of Technical and Nontechnical personnel required for the work with him who can be exclusively deployed for the work Min Technical and Non Technical Personnel Required for O and M Civil Engineer BE Civil with Min 5 Years experience-2 No, Electrical Engineer,BE Electrical Engg with Min 5 Years experience-1 No ,Diploma in Civil Engg with Min 2 years -1No, Diploma in Mech Engg with Min 2 years-1No, Pump operators 2 years experience-3 Nos
The intending bidder shall enter into tie up agreement with authorized pump manufacturer / supplier with Rs.200/- stamp paper in prescribed format which shall be concluded prior to bidding and uploaded to bid document
ITT 3.2 A. To qualify for award of this contract, each tenderer in his name should have in the last five years Period (2021-22 TO 2025-26) A) Achieved in at least two financial years a minimum financial turnover (In all classes of Civil Engineering Construction works) of Rs 15163.45 Lakhs. (Annual Turnover Certificate along with Balance sheet certified/attested by Chartered Accountants should be uploaded with 18-Digits system generated unique number UDIN Number)
ITT 3.3(b)Liquid assets and /or availability of credit facilities of no less than Rs.5207.94 Lakhs (Credit lines/letter of credit/ certificates from banks for meeting the fund requirement etc.
OTHERS
OTHERS
OTHERS
OTHERS
OTHERS
OTHERS
OTHERS
OTHERS
OTHERS
₹7,500
₹1.9 Cr
26 Aug 2026
26 Aug 2026
16 Sept 2026
11 Sept 2026
28 Aug 2026
NAME OF WORK - FILLING UP WATER BODIES (16 TANKS) OF JAVAGONDANAHALLI HOBLI AND GAYATHRI RESERVOIR FOR DRINKING WATER PURPOSE AND GROUND WATER DEVELOPMENT IN HIRIYUR TALUK OF CHITRADURGA DISTRICT
Total Duration - 30 Months (Including Monsoon)
Amount put to Tender 1895432000
Sl. No. Components Break-up (%) of Contract Value Sub-Break-up of Main Item (%) Further Sub- Break- up (%) Break-up of Contract Value in Rs Sub-Break-up of Main Item in Rs Further Sub-Break- up in Rs
1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month Milestone 1 9th Month 10th Month 11th Month 12th Month 13th Month 14th Month 15th Month 16th Month 2nd Milestone 17th Month 18th Month 19th Month 20th Month 21th Month 22th Month 23th Month 24th Month 3rd Milestone 25th Month 26th Month 27th Month 28th Month 29rd Month 30th Month 4 th Milestone O & M
PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL
Mile stone-1 Mile stone-2 Mile stone-3 Mile stone-4
A Civil Works: Construction of Jack well cum Pump house, Control Room, Staff Quarters, 3.50% 100.00% 66,340,120.00 66,340,120.00 0.00 0.00 0.00
6 After completion of Beams, Columns, Gantry Structure and Brick wall up to roof 15% 9,951,018.00 0.00 50.00% 4,975,509.00 25.00% 2,487,754.50 25.00% 2,487,754.50 9,951,018.00 0.00 0.00
7 After completion Doors, Rolling Shutters, Windows and Ventilators etc. 3% 1,990,203.60 0.00 50.00% 995,101.80 25.00% 497,550.90 25.00% 497,550.90 1,990,203.60 0.00 0.00
B. Pump House Electro-Mechanical Works: Pumping Machinery, Electrical works for 11.00% 208,497,520.00 0.00 0.00 0.00 0.00
Pump houses. 0.00 0.00 0.00 0.00
Jack well cum Pump House (Electro- Mechanical Works) for Pump house. 100.00% 208,497,520.00 0.00 0.00 0.00 0.00
c. Screens, Gates, Valves & Pipeline Works 0.00 0.00 0.00 0.00
d. All types Panels 0.00 0.00 0.00 0.00
f. Soft Starters 0.00 0.00 0.00 0.00
g. Cabling Works 0.00 0.00 0.00 0.00
i. Miscellaneous Works 0.00 0.00 0.00 0.00
3 After Commissioning of Pumping Machinery 3.50% 7,297,413.20 0.00 0.00 0.00 100.00% 7,297,413.20 7297413.20
C. Electric Sub-Station & Transmission Line 5.00% 94,771,600.00 0.00 0.00 0.00 0.00
To Jack well cum Pump House for pump house 100.00% 94,771,600.00 0.00 0.00 0.00 0.00 0.00
a. Power and Auxiliary Transformer 0.00 0.00 0.00 0.00
b. CT's, PT's and Isolators 0.00 0.00 0.00 0.00
c. Conductor 0.00 0.00 0.00 0.00
e. Miscellaneous Works 0.00 0.00 0.00 0.00
D. Rising Main/gravity main and associated civil works 25.00% 473,858,000.00 0.00 0.00 0.00 0.00
MS/HDPE Pipeline and associated works 100.00% 473,858,000.00 0.00 0.00 0.00 0.00
6 After completion of Miscellaneous works (Crossing & civil works) 4% 18,954,320.00 0.00 0.00 50.00% 9,477,160.00 25.00% 4,738,580.00 25.00% 4,738,580.00 18,954,320.00 0.00
E Pressure Distribution Network and associated civil works 40.00% 758,172,800.00 0.00 0.00 0.00 0.00
MS/HDPE Pipeline and associated works 100.00% 758,172,800.00 0.00 0.00 0.00 0.00
5 After supply of DI double flaged wafer type valves, Anchor block, Scour valves and surge protection 5% 37,908,640.00 0.00 50.00% 18,954,320.00 18,954,320.00 25.00% 9,477,160.00 25.00% 9,477,160.00 18,954,320.00 0.00
6 After completion of Miscellaneous works (Crossing, Crop Compensation & civil works) 5% 37,908,640.00 0.00 0.00 50.00% 18,954,320.00 25.00% 9,477,160.00 25.00% 9,477,160.00 37,908,640.00 0.00
F. For Tank Improvements and Construction of Diversion weir 14.50% 274,837,640.00 274,837,640.00 0.00 0.00 0.00 0.00
G. Operation and Maintenance of the Scheme for 60 Months to be released on monthly basis. 1.00% 100.00% 18,954,320.00 18,954,320.00 0.00 0.00 0.00 0.00
Total In Lakhs Total In Lakhs
8th month 120217774.60 9th month 108655639.40 10th month 291920220.90 520793634.90 5207.94 Maximum Cash Flow
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender drawings.pdf
Others - DRAWINGS • 9.71 MB
KW 4 Hiriyur TFS final dts 25-08-2026.doc
Tender Document • 20.70 MB
INSTRUCTIONS TO TENDERERS.zip
Instructions to Tenderers • 10.09 MB
Milestone HIRIYUR LIS updated.xlsx
Others - ACTIVITY CHART • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].