| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.1 LAccepted-AOC | ₹9.1 L | 1 | Accepted-AOC 1 |
| 2 | 2₹9.9 LRejected-AOC | ₹9.9 L | 2 | Rejected-AOC 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical 5 |
| 4 | Rejected-Technical | - | - | Rejected-Technical 3 |
| 5 | Rejected-Technical | - | - | Rejected-Technical 4 |
| Sl No | Description | Qty | Unit | ASHRAF P V L1 | SHIBU L3 | salam aboobacker L2 | T.K.SUNEESH MOHAMMED L4 | MUHAMMED NAJEEB L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Anganvadi | ||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 20.28 | cum | 174.22 ₹3,533.18 | 191 ₹3,873.48 | 190.49 ₹3,863.14 | 191.56 ₹3,884.84 | 193.7 ₹3,928.24 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1.44 | cum | 5,547.31 ₹7,988.13 | 6,098 ₹8,781.12 | 6,065.24 ₹8,733.95 | 6,099.32 ₹8,783.02 | 6,167.47 ₹8,881.16 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 13.23 | cum | 7,395.3 ₹97,817.63 | 8,131 ₹1.1 L | 8,085.77 ₹1.1 L | 8,131.19 ₹1.1 L | 8,222.04 ₹1.1 L |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.85 | cum | 8,916.57 ₹52,161.93 | 9,803 ₹57,347.55 | 9,749.08 ₹57,032.12 | 9,803.85 ₹57,352.52 | 9,913.39 ₹57,993.33 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 26.09 | cum | 9,355.23 ₹2.4 L | 10,285 ₹2.7 L | 10,228.69 ₹2.7 L | 10,286.15 ₹2.7 L | 10,401.08 ₹2.7 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 21.4 | sqm | 272.94 ₹5,840.92 | 299 ₹6,398.60 | 298.43 ₹6,386.40 | 300.1 ₹6,422.14 | 303.46 ₹6,494.04 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 69.76 | sqm | 528.94 ₹36,898.85 | 580 ₹40,460.80 | 578.32 ₹40,343.60 | 581.57 ₹40,570.32 | 588.07 ₹41,023.76 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 262.03 | sqm | 664.02 ₹1.7 L | 729 ₹1.9 L | 726.02 ₹1.9 L | 730.1 ₹1.9 L | 738.25 ₹1.9 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,542.8 | kilogram | 80.02 ₹2.8 L | 87 ₹3.1 L | 87.49 ₹3.1 L | 87.98 ₹3.1 L | 88.96 ₹3.2 L |
Tender Value
₹11.1 L
EMD Value
₹27,819
Closing Date
26 May 2025, 6:00 pmClosed
Assistant Engineer
Office of the Assistant Executive Enginee
SO 536/2025-Construction of Public toilet at HMT Junction
2025_LSGD_765183_1
LIDEW/AEE/ET/3/2026
Open Tender
Civil Works - Roads
180 days
Kalamassery
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹27,819
Yes
16 Apr 2026
20 May 2025
28 May 2025
20 May 2025
26 May 2025
20 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1246602.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
sbd1.pdf
Tender Documents • 3.12 MB
BOQ_1246602.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid