Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹38.0 Laccepted-aoc | ₹38.0 L | accepted-aoc |
Tender Value
₹43.6 L
EMD Value
₹43,600
Closing Date
9 Mar 2026, 3:30 pmClosed
SE PRED RWS EAST GODAVARI
KAKINADA
Providing Drinking Water Facilities to Kesavadasupalem GP in Sakhinetipalli Mandal in Dr.B.R.Ambedkar Konaseema District, Est.cost Rs.70.00 Lakhs
907321
No.74/2025-26, Dt.26-02-2026
OPEN - NCB
Water Supply
KONASEEMA, ANDHRA PRADESH
9 documents required · 9 mandatory
₹1,543
₹43,600
24 Mar 2026
2 Mar 2026
2 Mar 2026
Construction of 20000 Lts. capacity OHSR with 9.60 Mts. staging with raft foundation including plastering with CM (1:3) two coats of whether proof emulsion painting for external surfaces and three coats of epoxy paint to inner surface of the reservoir including roof down lettering as per departmental direction, fixing of all required fixtures CI D/F pipes, Verticles, Valves, Execution as per design and drawing supplied by department including the cost and conveyance of all materials. but excluding cost of CI pipes,specials and valves for vertical connections for a wind pressure of 150 Kg. per Sqm (using M30 grade concrete) with the following Fixtures including:Contractor Profit 13.615% and A)RCC or Aluminium ladder inside 0.60 m wide. B) Spiral staircase on the outside shall be provided upto 200KL. Above 200KL capacity dog legged staircase shall be provided with staircase flight width of 1.0 mts and landing width of 1.20 mts with S.S. railing upto 1.0 height. C) Lightening arrestor, including conductor and earthing etc., D) RCC ventilators with copper or stainless steel fly proof mesh. E) D.I Menholes frame and cover 0.60x0.60m as per IS specifications (light duty)-2Nos. F) Water level indicator of good quality with ebonite / copper float approved pattern -1No. G) The ladder shall be with M.S. ladder and Verticals with HDPE of 10kg/Sqcm shall be provided for single column OHSRs only. H) Minimum staging for all ELSR/OHSR shall be 10.0mts. I) The increase in staging shall be at 1.0mt interval. J) The railing provided to the gallery and stair case shall be with stainless steel of grade 304 for a height of 1.20 mts. K) The dog legged staircase shall be enclosed with brick/CRS wall on three sides and front side with M.S. collapsible gate upto 1st brace level from ground level to prevent unauthorized entry. L) D.I. swan neck ventilators shall be provided in top dome and slab. M) The above rates are exclusive of all inlet, outlet connection and valves. All valves near inlet, out let and for scour of ELSRs shall be D.I. valves of heavy duty confirming to the specification of SoR item No. 28 All valves near inlet, out let and for scour shall be D.I valves of heavy duty conforming to the specification [email protected] T/Sqm
Construction of 30000 Lts. capacity OHSR with 9.45 Mts. staging with raft foundation including plastering with CM (1:3) two coats of whether proof emulsion painting for external surfaces and three coats of epoxy paint to inner surface of the reservoir including roof down lettering as per departmental direction, fixing of all required fixtures CI D/F pipes, Verticles, Valves, Execution as per design and drawing supplied by department including the cost and conveyance of all materials. but excluding cost of CI pipes,specials and valves for vertical connections for a wind pressure of 150 Kg. per Sqm (using M30 grade concrete) with the following Fixtures including:Contractor Profit 13.615% and A)RCC or Aluminium ladder inside 0.60 m wide. B) Spiral staircase on the outside shall be provided upto 200KL. Above 200KL capacity dog legged staircase shall be provided with staircase flight width of 1.0 mts and landing width of 1.20 mts with S.S. railing upto 1.0 height. C) Lightening arrestor, including conductor and earthing etc., D) RCC ventilators with copper or stainless steel fly proof mesh. E) D.I Menholes frame and cover 0.60x0.60m as per IS specifications (light duty)-2Nos. F) Water level indicator of good quality with ebonite / copper float approved pattern -1No. G) The ladder shall be with M.S. ladder and Verticals with HDPE of 10kg/Sqcm shall be provided for single column OHSRs only. H) Minimum staging for all ELSR/OHSR shall be 10.0mts. I) The increase in staging shall be at 1.0mt interval. J) The railing provided to the gallery and stair case shall be with stainless steel of grade 304 for a height of 1.20 mts. K) The dog legged staircase shall be enclosed with brick/CRS wall on three sides and front side with M.S. collapsible gate upto 1st brace level from ground level to prevent unauthorized entry. L) D.I. swan neck ventilators shall be provided in top dome and slab. M) The above rates are exclusive of all inlet, outlet connection and valves. All valves near inlet, out let and for scour of ELSRs shall be D.I. valves of heavy duty confirming to the specification of SoR item No. 28 All valves near inlet, out let and for scour shall be D.I valves of heavy duty conforming to the specification [email protected] T/Sqm
Construction of pipelines for water supply with 75mm dia 6 Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its amendments and revisions thereon including supplying of pipes,necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation of size 0.7m x 1.0 m with manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications (Part-B, Volume-I) and as per drawing (Part-C, Volume-1). The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges, including overheads and including contractor's profit @ 13.615%
Earthwork excavation in all type of soils with initial lead and lift etc. complete including:Contractor Profit 13.615%
Filling of foundation with sand including cost, conveyance, watering and ramming etc. complete, including Contractor Profit 13.615%
CC (1:4:8) using 40mm HBG metal including cost and conveyance of all materials etc. complete,including Contractor Profit 13.615%
RCC (1:1.5:3) using 20mm HBG metal including cost and conveyance of all the materials but excluding cost of the steel etc. complete for Columns footings,including Contractor Profit 13.615%
RCC (1:1.5:3) using 20mm HBG metal including cost and conveyance of all the materials but excluding cost of the steel etc. complete for Columns,including Contractor Profit 13.615%
RCC (1:1.5:3) using 20mm HBG metal including cost and conveyance of all the materials but excluding cost of the steel etc. complete for Beams,including Contractor Profit 13.615%
Brick Masanory with CM (1:6) using second class bricks including cost and conveyance of all the materials etc. complete,including Contractor Profit 13.615%
RCC (1:1.5:3) using 20mm HBG metal including cost and conveyance of all the materials but excluding cost of the steel etc. complete for bed blocks,including Contractor Profit 13.615%
RCC (1:1.5:3) using 20mm HBG metal including cost and conveyance of all the materials but excluding cost of the steel etc. complete for Lintel beams,including Contractor Profit 13.615%
RCC (1:1.5:3) using 20mm HBG metal including cost and conveyance of all the materials but excluding cost of the steel etc. complete for Sun shades including Contractor Profit 13.615%
RCC (1:1.5:3) using 20mm HBG metal including cost and conveyance of all the materials but excluding cost of the steel etc. complete for 100mm thick Roof Slab including Contractor Profit 13.615%
Brick Masanory with CM (1:6) using second class bricks including cost and conveyance of all the materials etc. complete,including Contractor Profit 13.615%
Flush pointing with CM (1:3), 12mm thick including cost and conveyance of all materials etc. complete including Contractor Profit 13.615%
Accoproof plastering with CM (1:3), 12mm thick including cost and conveyance of all materials etc. complete including Contractor Profit 13.615%
Cement Plastering with CM (1:5), 12mm thick including cost and conveyance of all the materials etc. complete for side wall out side, inside and ceiling including Contractor Profit 13.615%
Flooring with CC (1:4:8) using 40mm HBG metal for 100mm thick and top plastering with CM (1:3), 20mm thick including cost and conveyance of all materials etc. complete including Contractor Profit 13.615%
Synthatic Enamel painting over primary coat and enamel painting in two coats including cost and conveyance of all materials etc. complete including Contractor Profit 13.615%
Painting with White Cement two coats including cost and conveyance of all materials etc. complete including Contractor Profit 13.615%
Snowcem painting including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
Earth work excavation in all type of soils with intial lead and lift ( 1st Mattu) including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
Earth work excavation in all type of soils with intial lead and lift ( 2nd Mattu) including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
CC(1:4:8)using 40 mm HBG metal icluding Cost and conveyance of the all materials including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
Filling the Foundation with sand including cost,conveyance ,watering and ramming including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
M30 grade concrete using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for bottom raft including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
M30 grade concrete using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Side walls including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
M30 grade concrete using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Top Doome including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
M30 grade concrete using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Ring Beam including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
Accoproof plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ect complete. including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
Cement plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ect complete. including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
Snowcem painting including cost and conveyance of all the materials ect complte side walls out side including cost and conveyance of all the materials etc. complete including Contractor Profit 13.615%
Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc complete.
(Rupees Fourty Three Lakhs Fifty Seven Thousand Six Hundred Twenty Four and Paisa Fourty Two Only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Part B Vol-I (Technical).doc
TENDER_DOCUMENT • 0.19 MB
Kesavadasupalem BOQ.xlsx
TENDER_DOCUMENT • 0.08 MB
Part A Volume-I (General).doc
TENDER_DOCUMENT • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .