| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹56.6 LAdmitted-Fee/PreQual/Technical/Finance | -14.99% | ₹56.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹62.4 L+₹5.8 L (10.3%)Admitted-Fee/PreQual/Technical/Finance | -6.25% | ₹62.4 L+₹5.8 L (10.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹66.6 L+₹10.0 L (17.6%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹66.6 L+₹10.0 L (17.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹66.6 L+₹10.0 L (17.6%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹66.6 L+₹10.0 L (17.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L3₹66.6 L+₹10.0 L (17.6%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹66.6 L+₹10.0 L (17.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹66.6 L
EMD Value
₹67,000
Closing Date
18 Aug 2026, 5:00 pmClosed
Executive Officer, Bhadrak Municipality
Executive Officer, Bhadrak Municipality
Beautification of Gopabandhu Square at Bhadrak, Odisha
2026_ORULB_137823_2
BM-BDK-05-2026-27
Open Tender
Civil Works - Others
Percentage
180 days
Bhadrak Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹67,000
Yes
19 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PATHWAY | |||||
| 1.01 | Earthwork in excavation of foundation trenches in All kinds of soil including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge. | - | Cum | 311.5 | - |
| 2 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. ` | - | Cum | 173.07 | - |
| 3 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only). | - | Cum | 918.75 | - |
| 4 | Providing and lying plain cement concrete of proportion (1:4:8) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge. | - | Cum | 5,996.89 | - |
| 5 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP-63:2018. | - | Sqm. | 608.4 | - |
| 6 | Supplying & fixing of pre cast kerb stone of size 600mm x 300mmx150mm of M-30 grade of approved make desgin ,colour & size made by block making machine with proper compaction fixed in required pattern etc.complete in all respect conforming to IS 5758:1984. | - | Each | 249.55 | - |
| 7 | S/F fixing of FRP Dust Bin
The dustbins are made of FRP in different animal cartoon shapes like Rabbit, Penguin, Monkey etc and painted with attractive colours. The dust bins are of height 4’ and having facility to drop waste from front and remove them from behind door. The dust bins are having facility to anchor ate site with cement concrete. | - | Nos | 8,500 | - |
| 8SCULPTURE | |||||
| 8.01 | Earthwork in excavation in all types of soil for site leveling, foundation, pits, trenches and other civil works upto and including 1.5metre depth and stacking the soil upto a lead of 100 metre and including dewatering, removing slush, shoring and strutting (as required), complete as per specification and as directed by the Engineer-In-Charge. | 1 | Cum | 311.5 | ₹311.47 |
stage.html
html • 0.06 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_604506.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .