| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC QUOTED BELOW 2 PERCENTAGE |
| 2 | L2₹10.2 L+₹39,860 (4.08%)Rejected-AOC | ₹10.2 L+₹39,860 (4.08%) | L2 | Rejected-AOC QUOTED ABOVE 2 PERCENTAGE |
Tender Value
₹10.0 L
EMD Value
₹25,000
Closing Date
5 Jun 2026, 5:00 pmClosed
The Executive Engineer, PMU, KSD
Office of the Executive Engineer, Project Management Unit, Vydhyuthi Bhavanam, Vidhyanagar, Kasaragod 671123
CONSTRUTION OF HT ABC AND INSTALLATION OF 100KVA DTR AT ILANTHODY UNDER ELECTRICAL SECTION,PERLA
2026_KSEB_851660_1
11/26-27/EE/PMU/KSD dt 16-05-2026
Open Tender
Electrical Works
Percentage
90 days
PERLA
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,360
₹25,000
23 Jul 2026
18 May 2026
9 Jun 2026
19 May 2026
5 Jun 2026
20 May 2026
20 May 2026 - 5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable | 12 | E | 193 | ₹2,316 |
| 2 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. | 12 | E | 370 | ₹4,440 |
| 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 30 | Trip | 3,142.26 | ₹94,267.8 |
| 4 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size | 40 | E | 164.67 | ₹6,586.8 |
| 5 | Erection of suspension clamp for 11KV ABC of any size | 25 | E | 164.67 | ₹4,116.75 |
| 6 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 2 | No | 8,735.82 | ₹17,471.64 |
| 7 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. | 7 | No | 564.55 | ₹3,951.85 |
| 8 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 36 | No | 762.14 | ₹27,437.04 |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 21 | No | 434.91 | ₹9,133.11 |
| 10 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 14 | No | 868.77 | ₹12,162.78 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1438995.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1438995.xls
BOQ • 0.36 MB
TenderDocument.pdf
Tender Documents • 0.62 MB
BIDDERDEAILS.pdf
Other Document • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .