Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
25 Sept 2026, 6:00 pmClosed
Executive Engineer, Unit-1, SoUADTGA, Ekta Nagar
Construction of Gabion Protection Work and Development of New Parking Area opposite the Bus Bay, Ekta Nagar
346307
07 of 2026-27
Open
Civil Works
Works
Narmada
10 documents required · 10 mandatory
₹4,248
CHIEF EXECUTIVE OFFICER, SOUADTGA, EKTA NAGAR
₹1.3 L
18 Sept 2026
18 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
NAME OF WORK : Construction of Gabion Protection Work and Development of New Parking
Area Opposite the Bus Bay, Ekta Nagar.
excluding Total Amount
excluding Total Amount
Description Unit Qty GST& (Rs.)
Excavation for foundation upto 1.5 m depth including sorting
out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(C) Hard Murrum
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead.(C)
Earthwork for embankment including breaking clods,
3 dressing with all lead and lift (excluding watering and CM 2,724.80 173.30
consolidation)(E) From Borrow area within 3.0 Km. lead
Rolling of earthwork in layers with power roller including
filling in depressions which occur during the process.
5 Watering of earth work as directed. CM 2,724.80 9.75
Providing and laying controlled cement concrete M.150 for
curing complete excluding cost of formwork and
6 reinforcement for reinforced concrete work in (A) CM 397.52 3,792.73
Foundations, footings,Base of columns and Mass
Providing and laying controlled cement concrete M.250 and
curing complete excluding the cost of formwork and
7 reinforcement for reinforced concrete work in CM 543.65 4,185.95
(A)Foundations, footings, Base of columns and Mass
Providing TMT Bar FE 500D reinforcement for R.C.C. work
8 including bending, binding and placing in position complete Kg 14,699.67 77.28
upto floor two level
Providing and supplying mechnically double twisted highly
galvanized with (PVC) poly chloride coating gabions made
of mesh size 10 x 12 mm woven wire as per ASTHMA 10 x
12 mm woven wire as per ASTHMA 975-97, Size of gabion
1 m x 1 m x 1m including roviding and laying stones in the
gabions and arranging them in a required manner in the
section of break water or such other strcutre including
quarring, blasting, loading at quarry site to transporting at
work site and arranging in the gabion in workman like
manner with required layer thickness and arranging this
gabions in required layers with the crane if required
capacity (if required as per drawings or as directed) with all
material, labours, tools etc. comp.
Providing & laying 230 mm thick pucca rubble pitching in
cement mortar 1:5 proportion with surface pointed with
cement mortar of 1:3 proportion including curing etc.
complete for all leads & llifts.
excluding Total Amount
excluding Total Amount
Description Unit Qty GST& (Rs.)
Compaction and finishing of cement concrete road by
tremix process, providing extra labour charge for tremix
(vacuum dewatering service) process on cement concrete
road surface by using vacuum dewatering pump floater
surface vibrator including making groove 5 mm width and
filling with polyvinyl polymer and rough finish to surface as
per instruction including leveling etc. complete.
Executive Engineer
SOUADTGA Unit-1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD New Parking area.pdf
BOQ (1).pdf
Technical Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .