| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹32.8 L+₹33,186.82 (1.02%)Rejected-AOC HALDWANI NAINITAL | L2 | Rejected-AOC HIGH RATE | |
| 3 | L3₹33.7 L+₹1.2 L (3.58%)Rejected-AOC | L3 | Rejected-AOC HIGH RATE | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
30 Mar 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE RWD NAINITAL
EE RWD NAINITAL
CONSTRUCTION OF ART CRAFT ROOM AND LIBRARY ROOM AT GHS DHOLAKHEDA HALDWANI
2021_RES_31167_2
1702 DATED 12.03.2021
Open Tender
Civil Works
Item Rate
180 days
HALDWANI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
EE RWD NAINITAL
₹74,000
18 Sept 2023
13 Mar 2021
30 Mar 2021
13 Mar 2021
30 Mar 2021
13 Mar 2021
45 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m
Providing and laying in position cement concrete of specified grade cost of centring and shuttering - -All work upto plinth level 1:4:8 C/S 40mm Stone Ballast.
Providing and laying in position specified grade of reinforced ceme upto plinth level 1:1.5:3 (1cement:1.5coarse sand:3 graded stone aggregate 20mm nominal size).
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5km also includingramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete Add beyond 5km upto 10 per km = 5*15.20=76
Providing and laying in position specified grade of reinforced ceme 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) upto floor five level.
RCC Work in beams,suspended floors roofs having slopes up to 15 degree landing , balconies,chajjas,lintels, bands,plain window sills,staircases and spiral staircases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement:1.5 coarse sand ;3 graded stone aggregate 20 mm nominial size ) SOR no 23642 1-5-3 )
Reinforcement for R.C.C.work including straightening,cutting,bending,placing in position and binding all complete.Thermo Mechanically Treated Bars.
Centring and shuttering including strutting, ropping etc. and removal of form for foundation,footings,bases of columns etc.
Centring and shuttering including strutting, ropping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Centring and shuttering including strutting, ropping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts.
Centring and shuttering including strutting, ropping etc. and removal of form forSuspended floors,roofs,landings,balconies and access platform.
Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in 1:6 C/S Mortar.
Brick work with F.P.S. bricks of class designation 75 in superstruct level upto floor V level in all shapes and sizes in 1:6 C/S Mortar.
Providing and fixing M.S. Tubular frames for doors, windows, ventilators and cupboard with L-Type section made of 1.60mm thick M.S. Sheet, joints mitred and and screws and applying a priming coat of approved steel primers Fixing with 15x3 mm lugs 10 cm. long embedded in cement concrete block 5x10x10 cm of C.C. 1:3:6 ( 1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Providing and fixing pressed steel door frames confirming to IS: 4351 manufactured from commercial mild as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge Profile C
Structural steel work riveted,bolted or welded in built up se trusses and framed work,including cutting,hoisting,fixing in and applying a priming coat of approved steel primer all complete.
12 mm cement plaster of mix 1:4 C/F sand.
15 mm cement plaster of mix 1:6 C/F sand.
12 mm cement plaster of mix 1:6 C/F sand.
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size stone aggregate
S/F35mm wide & 3.8 to 4.7mm thick glass strips in floor including cost of material Labour T&P complete.
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :
Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete.
Providing and fixing ISI marked flush door shutters conforming to I non-decorative type, core of block board construction with frame o wood and well matched commercial 3 ply veneering with vertical g bands and face veneers on both faces of shutters 35mm tkick.
Renewing glass panes, with putty and nails wherever necessary Float glass panes of thickness 4 mm
Providing and fixing ISI marked oxidised M.S. handles conforming to IS 125mm
Providing and fixing ISI marked oxidised M.S. handles conforming to IS 75mm
Providing and fixing ISI marked oxidised M.S. tower bolt black finish,200X10mm
Providing and fixing ISI marked oxidised M.S. tower bolt black finish,150X10mm
Providing and fixing ISI marked oxidised M.S.sliding door bolts 300x16 mm
Providing and fixing 150 mm bright finished floor brass door stopper with rubber cushion, necessary brass screws etc. to suit shutter thickness complete
Providing & fixing fly proff wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 m and nuts & bolts complete.Galcanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides.
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm.(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately.For the purpose of measurement the entire treated surface will be measured
Grading roof for water proofing treatment with 22.14.1 Cement concrete 1:2:4 (1 cement : 2 coarse sand
Providing and applying white cement putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more Coats) over & including priming coat with cement primer.
Finishing walls with Acrylic Smooth exterior paint of required shade :13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
Sanjay Pandey
BHAWAN SINGH ADHIKARI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .