Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172029 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.4 L+₹1,966 (0.16%)Rejected-Finance VILLAGE P O AMARPUR TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹12.8 L+₹34,798 (2.80%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹12.8 L+₹43,724 (3.52%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹12.9 L+₹45,389 (3.66%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | L5 | Rejected-Finance L5 |
Tender Value
₹15.1 L
EMD Value
₹30,300
Closing Date
9 Apr 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Restoration of rain damages on Kothi to Baddu road km 0/00 to 2/260 SH C/o Link road kothi to Kurnari construction of R/wall at RD 1/210to 1/225,B/Wall at RD 0/360 to 0/375and Providing and laying cment concrete pavement at km 0/130 to 0/270 at km 0/
2026_PWD_133042_15
16181-87dt. 31/3/2026
Open Tender
Civil Works
Percentage
60 days
GHUMARWIN
AS PER SBD
13 documents required · 13 mandatory
₹350
₹30,300
25 Jul 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
2 Apr 2026 - 9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m (one point five metre) in width or 10 sqm (ten square metre) on plan, including dressing of sides and ramming of bottoms, lift upto any lead .All kinds of soil as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per cubic metre | - | - |
| - | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 150 mm (One Hundred fifty millimetre)spread thickness (finished work including materials and labour)as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per cubic metre | - | - |
| - | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level. 1:1.5 :3(One cement is to one point five coarse sand is to three crushed graded stone aggregate 20 mm (twenty milimetre) nominal size.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per cubic metre | - | - |
| - | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundation complete as per drawing and MORD tecnical specification clauses 802, 803, 1202 & 1203. Nominal Mix 1:4:8 (one cement is to four sand is to eight crushed graded stone aggregate) 40mm (forty millimeter) as per direction of Engineer-in-Charge including carriage of materials with with in all leads and lifts and other incidental. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Per Cubic metre | - | - |
| - | Providing weep holes in brick masonary /stone masonary / plain reinforced concrete abutment, wing wall, return wall with 100 mm (one hundred millimetre). dia PVC pipe white in colour extending through the full with of the structures with slop of 1(V): 20(H) towards drawing face complete as per HPPWD specification clauses 614,709,1204.3.7 as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | - | Each | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
SBD15.pdf
Tender Documents • 3.44 MB
BOQ_196822.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .