Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | ₹8.1 L Quoted ₹6.9 L | L1 | Accepted-AOC Vendor L 1 |
| 2 | L2₹7.0 L+₹18,477.76 (2.69%)Rejected-Finance | ₹7.0 L+₹18,477.76 (2.69%) | L2 | Rejected-Finance Rate Quoted Higher then First Lowest |
| 3 | L3₹7.2 L+₹29,839.05 (4.35%)Rejected-Finance | ₹7.2 L+₹29,839.05 (4.35%) | L3 | Rejected-Finance Rate Quoted Higher then First Lowest |
| 4 | L4₹7.6 L+₹76,366.99 (11.1%)Rejected-Finance | ₹7.6 L+₹76,366.99 (11.1%) | L4 | Rejected-Finance Rate Quoted Higher then First Lowest |
| 5 | L5₹7.8 L+₹89,406.04 (13.0%)Rejected-Finance | ₹7.8 L+₹89,406.04 (13.0%) | L5 | Rejected-Finance Rate Quoted Higher then First Lowest |
| Sl No | Description | Qty | Unit | harish bora ,contractor L2 | MANJEET BHAGAT L4 | M/S MAHENDRA PAL SINGH L5 | HARISH PHARTYAL L6 | RAJENDRA SINGH BISHT L1 | RANJEET SINGH L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation | 53.47 | Cu.m | 310.59 ₹16,607.25 | 333 ₹17,805.51 | 100 ₹5,347 Lowest | 370 ₹19,783.9 | 302 ₹16,147.94 | 316 ₹16,896.52 |
| 2.00 | G.I. wire crates | 20.25 | Cu.m | 1,602.15 ₹32,443.54 | 1,728 ₹34,992 | 1,800 ₹36,450 | 1,900 ₹38,475 | 1,562 ₹31,630.5 Lowest | 1,633 ₹33,068.25 |
| 3.00 | RR Stone Masonry in 1:6 Cement Sand Mortar | 71.05 | Cu.m | 3,147.18 ₹2,23,607.14 | 3,374 ₹2,39,722.7 | 3,600 ₹2,55,780 | 3,772 ₹2,68,000.6 | 3,070 ₹2,18,123.5 Lowest | 3,208 ₹2,27,928.4 |
| 4.00 | HPS Filling | 7.1 | Cu.m | 836.13 ₹5,936.52 | 900 ₹6,390 | 300 ₹2,130 Lowest | 1,001 ₹7,107.1 | 816 ₹5,793.6 | 852 ₹6,049.2 |
| 5.00 | RR Stone Masonry in 1:5 Cement Sand Mortar | 53.46 | Cu.m | 3,250.32 ₹1,73,762.11 | 3,454 ₹1,84,650.84 | 3,700 ₹1,97,802 | 3,892 ₹2,08,066.32 | 3,170 ₹1,69,468.2 Lowest | 3,313 ₹1,77,112.98 |
| 6.00 | Cement Concrete 1:3:6 | 9.56 | Cu.m | 4,911.67 ₹46,955.57 | 5,283 ₹50,505.48 | 5,200 ₹49,712 | 5,885 ₹56,260.6 | 4,792 ₹45,811.52 Lowest | 5,007 ₹47,866.92 |
| 7.00 | Cement Pointing 1:3 | 612.9 | Sq.m | 64.87 ₹39,758.82 | 72 ₹44,128.8 | 70 ₹42,903 | 76 ₹46,580.4 | 62 ₹37,999.8 Lowest | 63 ₹38,612.7 |
| 8.00 | Slip Clearance | 209.1 | Cu.m | 185.44 ₹38,775.5 | 198 ₹41,401.8 | 200 ₹41,820 | 220 ₹46,002 | 174 ₹36,383.4 Lowest | 189 ₹39,519.9 |
| 9.00 | RCC 1:1.5:3 M25 | 4 | Cu.m | 6,141.02 ₹24,564.08 | 6,624 ₹26,496 | 6,100 ₹24,400 | 3,764 ₹15,056 Lowest | 5,991 ₹23,964 | 6,260 ₹25,040 |
| 10.00 | HYSD Bar for Reinforcement | 3.14 | Qtl | 7,039.86 ₹22,105.16 | 8,013 ₹25,160.82 | 8,000 ₹25,120 | 8,442 ₹26,507.88 | 6,800 ₹21,352 Lowest | 7,176 ₹22,532.64 |
Tender Value
₹10.0 L
EMD Value
₹30,000
Closing Date
1 May 2025, 2:00 pmClosed
Executive Engineer
Office of the Executive Engineer Irrigation Division Ranikhet
Renovation Work of 04 Number hill Canal Block Tarikhet Under Nabard RIDF XXX
2025_IRDCE_82766_1
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Wise
270 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineer Irrigation Division Ranikhet
₹30,000
13 Feb 2026
16 Apr 2025
2 May 2025
16 Apr 2025
1 May 2025
17 Apr 2025
Amount
Earthwork in excavation
G.I. wire crates
RR Stone Masonry in 1:6 Cement Sand Mortar
HPS Filling
RR Stone Masonry in 1:5 Cement Sand Mortar
Cement Concrete 1:3:6
Cement Pointing 1:3
Slip Clearance
HYSD Bar for Reinforcement
Cement Plaster 1:4
harish bora ,contractor (BID ID -377451)
RANJEET SINGH (BID ID -377761)
MANJEET BHAGAT (BID ID -378214)
M/S MAHENDRA PAL SINGH (BID ID -377445)
HARISH PHARTYAL (BID ID -377602)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_98606.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .