CHIEF ENGINEER (G)
Providing and fixing Additional partition and other misc. work at Administrative office GTPS
363766
EW-372
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 2 mandatory
₹1,770
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹14,874
12 Nov 2026
12 Nov 2026
12 Nov 2026
4 Dec 2026
12 Nov 2026
1. SECTION-A:
ACKNOWLEDGEMENT OF TENDER FEE /EMD.
TENDER NOTICE.
2. SECTION-B:
DECLARATION FORM CUM UNDER TAKING TO BE
SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE TENDERER
3. SECTION-C:
GENERAL CONDITIONS OF CONTRACT
4. SECTION-D:
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES & LIST OF SAFETY TOOLS
5. SECTION-E :
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
ANNEXURE – I (DETAILS OF BANK FOR SOLVEANCY &
6. SECTION-F:
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF
STEEL / CEMENT
GENERAL GUIDELINES RELEVANT TO I.S.
7. SECTION-G:
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
DETAIL SPECIFICATION
8. SECTION-H:
SCHEDULE-B
Safe Maintenance Procedure
EW- 372 PUR-F-006 RFQ-
ACKNOWLEDGEMENT OF TENDER FEE /EMD
TENDER NOTICE
EW- 372 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
Ph. 91-79-23215663Fax: 91-79-23217673, e-mail:
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
ACKNOWLEDGMENT
e- Tender for the
Providing and fixing Additional partition and other misc. work at
Administrative office GTPS.
TENDER FEE PAID VIDE DEMAND DRAFT NO. _________________________________
DATED___________________________ RS. __________________________________
EARNEST MONEY DEPOSIT PAID VIDE D.D. NO. _______________________________
DATED ____________________ RS. _____________________
1. The undersigned reserves the right to reject any or all tenders without
assigning any reasons thereof.
2. The Tender fee will be accepted in form of Demand Draft and Earnest Money
Deposit will be accepted in form of Demand Draft or Bank Guarantee of any bank as
prescribe in ANNEXURE- I drawn in favour of “GUJARAT STATE ELECTRICITY
CORPORATION LTD.” payable at Gandhinagar TPS
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
Ph. 91-79-23215663Fax: 91-79-23217673, e-mail:
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Tender Notice No: GSECL/___/ __/ For Civil works
CE [Generation], Gandhinagar, TPS invites “On-line Tenders” (e-tendering) for the work of Providing and
fixing Additional partition and other misc. work at Administrative office GTPS Tender Papers &
Specifications may be down loaded from Web site https://gsecl.nprocure.com(For view, down
load and on line submission) and GUVNL / GSECL web sites www.gsecl.in (For view only).All
tender documents are to be upload (Notarized / self-attested copies of original – as specified in tender
document) through online only (mandatory) on (n) procure portal excluding Tender fee and EMD Tender
fee and EMD are to be submitted physically by Registered Post A.D. or Speed Post addressed to: CHIEF
ENGINEER (GENERATION), GUJARAT STATE ELECTRICITY CORPORATION LTD, THERMAL
POWER STATION, GANDHINAGAR-382041, GUJARAT. “NO COURIER SERVICE OR HAND
DELIVERY” will be accepted.
Tender Estimated E.M.D.
No. Cost Rs. Rs.
EW - Providing and
372 fixing Additional Rs. 4,95,808.69 (Four 02 (Month) Rs. 1500+ Rs.
partition and Lakh ninety five Months 270 = Rs. (Fourteen
other misc. work Thousand Eight from the 1770/-(One thousand
hundred Eight and date of thousand eight hundred
at administrative
paisa sixty nine only.) written Seven seventy four
office GTPS. order to hundred only.)
commence Seventy (Non
the work. Refundable)
180 Days [From the opening
1 Validity of Tender
of Technical Bid].
Last Date for Online tender / offer submission through
2 As per Tender Notice
(n)Procure only up to 18:00 Hrs(This is Mandatory)
Last Date for physical receipt of cover for DD / Bank
3 Guarantee / Online payment reference for Tender Fee and As per Tender Notice
EMD only up to 15:00 Hrs Through RPAD or Speed Post Only
Date of opening of online Technical Bid, all relevant
documents submitted through online process, Cover for
4 Tender fee and EMD at 15:30 Hrs (Online technical bid will As per Tender Notice
be opened for Bidders who have submitted Cover for Tender
Fee and EMD)
Tentative date of on-line opening of price bid (if possible) at Party has to be in touch with
15.30 hrs. website www.nprocure.com
and also with e-mail sent by
above website
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
1) Only following listed documents must be upload in n-process online only. No physical documents are to be
submitted except tender fee and EMD cover. Price Bid shall not be submitted in Hard copy.
1. Demand Draft for Tender Fee and EMD (Original) cover only to submit through RPAD/Speed post only.
2. The bidder shall have a separate Provident Fund Code of RPFC in the name of company. The bidder, who
does not possess such separate P.F. code, shall not be considered for acceptance of tender. The
contractor has to submit attested copy of such certificate showing P.F. code along with the tender.
3. Attested copy of PAN No.
4. Attested copy of work experience certificate for the similar works executed.
5. List of work in progress.
6. Attested copy of firm registration [Applicable only to the firms registered under Company Law]
7. Attested copy of partnership deed. [Applicable only to the partnership firms.]
8. Attested copy of power of attorney, if any, for signing the bid document.
9. The Last three-year Annual Accounts, Positive Net worth certificate, and Average Annual Turnover
certificate would be obtained from the bidder. Details of equipment, tools and plants immediately
available with the tenderer for use of this work.
10. Details of technical personnel.
11. Undertaking duly Notarized as per attached Declaration Form
12. Any other documents required to verify technical, financial capability of the bidders & other Credentials
15. Attached The Copy Of GST Registration.
All such documents should be strictly uploaded in N-procure only expect Tender Fee and EMD details
cover. Otherwise the offer will not be considered and no any further communication in the matter will be
entertained.
2) In case any deviation is found in Data / Details / Documents uploaded on N-procure online offer (e-
tendering) documents then such tender will not be considered and no any further communication in the
matter will be entertained. Tenders must be un-conditional. Conditional Tenders will be rejected.
3) Further bidders are requested to submit Technical Bid documents and price – bid i.e. Schedule-B on line
only and not to submit the Technical bid and price bid in physical form expect Tender Fee and EMD
details cover. This is mandatory. If Technical bid document and price bid is submitted in physical form
expect Tender Fee and EMD details cover, same will not be opened and only on-line Uploaded/submitted
Technical bid document and price will be considered for evaluation. The bidder is requested not to
upload/submit the by online (n)procure while bid submission on in (n)procure tender
document, condition of the contract, specification & other relevant documents, except
documents as stated here above. Instead of the same, the bidder shall upload on (n) procure scan
copy of the duly Notarized Undertaking as stated below declaration form on the stamp paper of Rs. 300/-.
However, bidder may download tender document & preserve with them in Hard Copy for
their future reference. Later on, L1 bidder shall be asked to collect the tender documents
from the tender inviting authorities for the purpose of contract agreement execution and
place their signature with seal of the company.
4) It is mandatory for all the bidders to submit their tender documents viz. on-line (e-tendering) and
uploading on (n) procure in scheduled time. Tender documents submitted in physical form will not be
accepted and considered expect Tender Fee and EMD details cover. Also, all bidders shall submit required
Physical documents as stated in Tender Notice
5) GSECL reserves the rights to reject any OR all tenders without assigning any reasons thereof.
6) Tender Notice Number & name of the work shall be clearly written on the covers of containing the Tender
Fee and EMD.
7) Technical / Price Bids will be opened on the day and time indicated in the tender notice by an Officer
nominated by the Purchaser in the presence of such of the bidders who wish to be present. Any technical
questions, information and clarifications that may be required pertaining to this tender should be referred to the
CHIEF ENGINEER (GEN.) Gandhinagar TPS. Also during pre-bid meeting (if arranged) the same may please be
discussed.
The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process for the
product which they are manufacturing / service which they are providing and have
Udyam registration for items / service under procurement and having registration
with CSPO or National Small Industries Corporation.
2. Start-ups which participate directly in tendering process for the product which they
are manufacturing/service which they are providing and re-cognized by DPIIT under
the Start-up India Program and has obtained Udyam registration &CSPO/NSIC
registration as MSE.
3. Organization which has registration certificate for the manufacturing product of the
tender, from Gujarat Khadi Gramodyog Board or Khadi and Village Industries
EW- 372 PUR-F-006 RFQ-
Commission(K.V.I.C)or Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own
manufactured items.
5. State Government recognized organizations like(i) organizations for blinds, dumb and
deaf, disabled, mentally disabled persons;(ii)women's self-help group recognized by
Gujarat Livelihood Promotion Company; which participate directly in tendering
process for the product which they are manufacturing / service which /they are
providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering process
as Manufacturers or Service Providers, and holds a valid Udyam Registration, are
eligible for exemption from payment of Earnest Money Deposit (EMD).
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or similar
categories (i.e. other than Manufacturers/Service Providers) are not eligible for EMD
exemption.
3. Migration period for Reclassification of MSMEs: - ln case of an upward change in
terms of investment in plant and machinery or equipment or turnover or both, and
consequent re-classification, an enterprise shall continue to avail of all non-tax
benefits of the category (micro or small or medium) it was in before the re-
classification, for a period of three years from the date of such upward change.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
DECLARATION FORM CUM UNDER TAKING
TO BE SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE BIDDER
EW- 372 PUR-F-006 RFQ-
(To be uploaded on (n) procure online process duly notarized on Rs. 300/- Non
– Judicial Stamp Paper)
DECLARATION FORM
Administrative office GTPS
Tender No/ RFQ No:
1. I/We hereby declare that I/We have carefully studied the entire tender placed on the
WEB site and conditions of contract, specifications and other documents of this work
mentioned in the tender and abide by the same. Also, I/We hereby agree to execute
the same accordingly.
2. I/We hereby abide to execute the contract agreement by downloading the copies of
the conditions of contract, specifications and other documents of this work of
otherwise I/we will get copy of the same from the office of the tender inviting
authority and the same will be acceptable to me/us.
3. I/We hereby accept and confirm that any dispute on this regard shall not be
4. I/We hereby declare that I/We have visited the work site and fully acquainted
myself/ourselves with the local situations regarding materials, labour and other
factors pertaining to the work before submitting the tender.
5. I/We hereby confirm that our offer is Un-conditional and without any technical &
commercial deviations.
6. Should this tender be accepted, I /We hereby agree to abide by to fulfill all the
terms-conditions and provision of the Tender and Contract for Works as applicable
and default thereof, to forfeit and to pay to the Gujarat State Electricity Corporation
Limited the sums of money due.
7. The full value of the “Earnest Money Deposit” paid herewith should be absolutely
forfeited to the Corporation, should I/ we do not deposit the specified amount of
specified Security Deposit is to be recovered from the first RA bill.
EW- 372 PUR-F-006 RFQ-
8. If, I fail to submit all required documents with application or tender copy ( in each
tender ) then my tender will be cancelled, which is binding to me.
9. If, full or part work will be given to me, it will be accepted to me with same terms,
rate & conditions.
10. I, ______ proprietor / owner / partner / Authorized Agent of M/s. ______ do hereby
also declare and undertake as under:
a) That in capacity of independent contractor for M/s. ______ (Sub-Contractor of
M/s. ______ ) worked as contractor at GSECL, ___________Thermal Power Station
for the nature of work of ______ against work Order No. ______ Dt. ______., I
have complied with the provisions of all laws as applicable. I have paid the wages
for the month/s of my contractual period which is / are not less than the minimum
rates as applicable, to all my employee/s and no other dues are payable to my
employee/s.
b) That I have covered all the eligible employee/s under the Employees’
Provident Funds and Miscellaneous Provisions Act, 1952 and deposited the
contributions under my PF Code No. ______, place: ______ for the month/s of my
contractual period and as such no amount towards contribution whatever is payable.
c) I further declare and undertake that in case any liability pertaining to any of
my worker, labour, employee/s is/are to be discharged by the principle employer i.e.
Gujarat State Electricity corporation Limited, ___________Thermal Power Station
due to my lapse, I undertake to reimburse the same or the principle employer is
authorized to deduct the same from my dues as payable.
d) I further declare and undertake the legal consequences which may arise in
future under the said work order awarded, and I bond myself to resolve the same at
the risk and cost of M/s. ______.
authorized signatory of M/s ______________________________________________
here by certify that M/s _________________________________________________
and their proprietor / any partner / any directors of the firm is not stop deal and / or
banned for business dealing and / or black listed by GUVNL and / or their any
subsidiary company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL / PGVCL as well
as Government and / or Semi Government company / department.
Seal & Signature of the Bidder
Phone / Mobile/ Fax No. & Company’s Seal
EW- 372 PUR-F-006 RFQ-
e- Tender for the work of Providing and fixing Additional partition and other misc.
work at Administrative office GTPS
RTGS DETAIL OF BIDDER
Following RTGS details shall be submitted by agency along with the tender for direct
deposit of payment to the beneficiary account. Bidder has to submit the details as under:
1 Name of Bidder :-
2 Address for correspondence :-
3 E-Mail ID :-
4 Phone / Mobile No. :-
5 Name of Beneficiary :-
6 Bank Account Number of :-
beneficiary
7 Name of Bank of beneficiary :-
8 Name of Bank, branch & address :-
9 Type of account :-
10 Bank Code :-
11 RTGS Code :-
12 IFSC Code :-
EW- 372 PUR-F-006 RFQ-
Project Synopsis and Data
1) Location :- Gandhinagar Thermal power station
2) Purchaser :- GUJARAT STATE ELECTRICITY
CORPORATION LTD
3) Engineer :- Chief Engineer(Gen)
4) Site of Project :- Gandhinagar,Gujarat State
5) Nearest town :- Gandhinagar
6) Nearest Railway Station :- Gandhinagar Capital(Ahmedabad is situated
at a distance of about 30.00Km)
7) Nearest Port :-
8) Nearest Air Port :- Ahmedabad-20Km(Approx)
9) Access Road :-
10) Site Elevation from MSL :- RL 81.5 M(floor level)
11) Meteorological Data
Ambient Air temperature
1] Highest monthly mean of :- 350 C
daily Max. Temperature
2] Maximum dry bulb :- 450 C
Temperature ( In 0C)
3] Minimum dry bulb :- 8.60 C
Temperature ( In 0C)
Rainfall
1] Average annual rainfall :- 1000 to 1200mm
2] For 01 hour ( In mm) :- 75 to 100mm
3] For 24 hour ( In mm) :- 250mm
Wind velocity
1] Maximum wind velocity :-
(In m/sec)
2] Wind direction – N,NE & SW :-
3] For 24 hour ( In mm) :-
Relative Humidity
1] Annual mean humidity ( In :- 50 to 60%
2] Maximum humidity (In %) :- 98%
3] Minimum humidity (In %) :- 2%
4] Type of Atmosphere :- Dry
12) DESIGN DATA
Seismic Data :-
Zone :- Zone-III as per IS 1893-1975
Intensity :-
Ambient temperature :-
Other Data :-
EW- 372 PUR-F-006 RFQ-
SCOPE OF WORK AND SITE CONDITIONS
The main scope of work is Providing and fixing Additional partition and other
misc. work at Administrative office GTPS Work shall be carried out as per items
specification and as directed by E.I.C. The work includes all materials, tools, tackles,
scaffolding required & successful completion of work.
Under the scope of this tender the agency has to carry out the subject work, various
civil works as per all items of Schedule B and as per detail technical specifications items.
The quantities taken under individual items are very tentative. However the agency has
to carry out the works as per the Company’s requirements anywhere in Power House
The agency has to carry out the works as per item & specifications of the tender by
providing all materials of best quality and of standard manufactures as the samples
approved by EIC and providing best workmanship through expert manpower.
The agency has to carry out the works as per the priority & schedule given by EIC time
to time even in on or off working hours of the office. The agency will take complete care
and will not damage any other structure in premises of company.
The agency has to carry out all the works by taking all due cares of safety, security
norms, with all risks including scaffolding, strutting, shoring, etc up to any height
irrespective of quantum of the work.
Contractor has to make arrangement for workable site condition with the co operation of
departments of company and agencies, all necessary arrangement to get work permit is
to be made by contractor. Day to day cleaning is required after completion of job. The
removed materials and any other unwanted materials are to be transported and taken
away as instructed by E.I.C.
All safety measures shall be taken by the contractor with his own cost.
The major works involvement generally mentioned as here under---
PARTITION WALL : Providing and fixing aluminium solid or glazed or solid and glazed partition.
TUFFEN GLASS: Providing and fixing in position 12 mm Thick Glass
GLASS DOOR: Providing and fixing in true line level and in position.
CABINETS: Providing and Fixing in position cabinets
Pro. And fixing single layer water proof gypsum board 12.5 mm thick.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
Registration in VMS System
Additional Note: Vendor gets to register in VMS System through vms.guvnl.com. For
registration following documents are required and mail to [email protected] and
[email protected]. After registration vendor have to upload the invoice in the VMS
system for smooth functioning of payment.
Documents required for Registration:
(1) PAN Copy
(2) GST Certificate Copy
(3) Email ID
(4) Full Name of Vendor
EW- 372 PUR-F-006 RFQ-
SPECIAL NOTE FOR PRE-QUALIFICATION
Administrative office GTPS
The tender documents are of two separate bids i.e. technical and price bids. Bidder is
requested to submit the technical bid with the following credentials for post-qualification.
1. Contractor should produce evidence of having experience of having successfully completed
similar works as defined hereunder during the last seven years ending last day of the month
previous to the one in which tender is invited ongoing works, satisfactory progress within
stipulated time, etc. secured from Govt., /Semi Govt., along with certified copies of
documentary evidence, preferably photo copy of work experience certificate secured from
GSECL/ GETCO / DISCOMS / GEB / Central / State Government/Semi- Government. The
experience should be either of the following-
a. Three similar completed works each costing not less than the amount equal to Rs.
b. Two similar completed works each costing not less than the amount equal to Rs.
c. One similar completed works each costing not less than the amount equal to Rs.
2. Similar work means : Any types of Civil Construction/Civil Maintenance work.
3. Contractor has to submit satisfactory work completion certificate of the client. Experience
certificate of work executed with private firm shall not be accepted. Experience as
a joint venture or sub-contractor is not allowed and price bid of such bidders will
be rejected.
2. Financial qualification criteria:
1) The Average Annual Turnover of the bidder, shall not be less than Rs. 1,48,743.00 during the
preceding three (3) financial years as one date of Techno-Commercial bid opening.
2) Net worth of bidder shall not be less than 100% of the bidder’s paid up share capital as on the
last day of the preceding financial year. In case the Bidder meets the requirement of Net worth based
on the strength of its Subsidiary (ies) and/or Holding company and/or Subsidiaries of its Holding
Companies wherever applicable, the Net worth of the Bidder and its Subsidiary (ies) and/or Holding
company and/or Subsidiary (ies) of the Holding Company, in combined manner should not be less
than 100% of their total paid up share capital. However individually, their Net worth should not be
less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3 are individual net
worth which shall not be less than 75 % of the respective paid up share capitals and y1, y2, y3
are individual paid up share capitals.
3) In case the bidder is not able to furnish its audited financial statements on stand-alone entity basis,
the unaudited unconsolidated financial statements of the bidder can be considered acceptable
provided the bidder further furnishes the following documents for substantiation of its qualification.
Copies of the unaudited unconsolidated financial statements of the bidder along with copies of
the Audited consolidated financial statements of its Holding Company.
A Certificate from the CEO/CFO of the Holding Company, stating that the unaudited
unconsolidated financial statements form part of the Consolidated Annual Report of the company.
4) In cases where audited results for the last preceding financial year as on the date of techno-
commercial bid opening are not available, the financial results certified by a practicing Chartered
Accountant shall be considered acceptable. In case, Bidder is not able to submit the Certificate from
practicing Chartered Accountant certifying its financial parameters, the audited results of three
consecutive financial years preceding the last financial year shall be considered for evaluating the
financial parameters. Further, a Certificate would be required from the CEO/CFO, stating that the
Financial results of the Company are under audit as on the date of Techno-commercial bid opening
and the Certificate from the practicing Chartered Accountant certifying the financial parameters is not
available.
EW- 372 PUR-F-006 RFQ-
5) The bidder must submit Average Annual Turnover and Net worth Certificate in support of Financial
QR, duly certified and verified for authenticity from Independent Statutory Auditor of their company /
Practicing Charted Accountant/ C.A. Firms / TPIA (Third-Party Inspection Agency ) empaneled
approved by GSECL, along with copy of Annual Audited Accounts of last three years.
Note for point No.1, 2, 3&4:
i. Other income shall not be considered for arriving at annual turnover.
ii. “Holding Company" and “Subsidiary Company” shall have the meaning ascribed to them as per
Companies Act of India, in vogue.
Net worth means the sum total of the paid up share capital and free reserves. Free reserve means all
reserves credited out of the profits and share premium account but does not include reserves credited out of
the revaluation of the assets, write back of depreciation provision and amalgamation. Further, any debit
balance of Profit and Loss account and miscellaneous expenses to the extent not adjusted or written off, if
any, shall be reduced from reserves and surplus.
3. To pay EMD in form of DD OR in form of B.G. given by bank as described in the Annexure – I. All
the bidders will be required to pay Tender Fees plus 18% GST and EMD as mentioned in the Tender
Document either in Demand Draft, Pay Order or Bank Guarantee (only for EMD) in favour of Gujarat State
Electricity Corporation Limited payable at Gandhinagar, Gujarat. The scanned copy of original document
shall have to be uploaded online with the bid and RPAD or Speed Post only addressed to The Chief
Engineer (G), Gujarat State Electricity Corporation Limited, Thermal Power Station,
Gandhinagar-382041.
4. Tender Fee: The tender fee shall be accompanied in the form of DD.
The exemption in payment of Tender Fee & EMD shall be given to the,
4. Micro & small-scale enterprises which participate directly in tendering process for the product which
they are manufacturing / service which they are providing and have Udyam registration for items /
service under procurement.
5. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the Start-up India
Program and has obtained Udyam registration.
6. Organization which has registration certificate for the manufacturing product of the tender, from
Gujarat Khadi Gramodyog Board or Khadi and Village Industries Commission(K.V.I.C)or Commissioner
of Cottage Industries.
7. Board/Corporations/PSUs of the Central/State Government for their own manufactured items.
8. State Government recognized organizations like(i) organizations for blinds, dumb and deaf, disabled,
mentally disabled persons;(ii)women's self-help group recognized by Gujarat Livelihood Promotion
Company; which participate directly in tendering process for the product which they are
manufacturing / service which /they are providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering process as
Manufacturers or Service Providers, and holds a valid Udyam Registration, are eligible for exemption
from payment of Earnest Money Deposit (EMD).
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or similar categories (i.e.
other than Manufacturers/Service Providers) are not eligible for EMD exemption.
3. Migration period for Reclassification of MSMEs: - ln case of an upward change in terms of investment
in plant and machinery or equipment or turnover or both, and consequent re-classification, an
enterprise shall continue to avail of all non-tax benefits of the category (micro or small or medium) it
was in before the re-classification, for a period of three years from the date of such upward change.
Vendor Registration with GSECL is not compulsory for submitting this tender.
(1) If any Bank Guarantee submitted against EMD/security deposit/PBG, same should be valid one year
from the date of expiry of BG. Bank Guarantee should be confirmed through Structured Financial
Messaging system (SFMS). SFMS allows intra/interbank message transfer system of banking. Our
bank details are as under.
ACCOUNT NAME GSECL
ACCOUNT NO
BANK NAME & BRANCH BOB, SECTOR-21, GANDHINAGAR
IFSC CODE BARB0GANDHI
6. The Last three-year Audited Annual Accounts, Positive Net worth certificate, and Average Annual Turnover
EW- 372 PUR-F-006 RFQ-
certificate certified by charted accountant as Per Qualification Requirement.
7. Separate employee’s provident fund code number towards registration of firm with Regional
P.F. Commissioner.
8. Attested copy of relevant document duly signed and sealed on each and every page shall be submitted.
9. Declaration form in original duly notarized on stamp paper of Rs. 300/- (As referred in Tender Notice)
10. Attach copy of GST Registration.
11. Bidder shall have to submit the PAN card No for Income Tax with documentary proof.
12. Details of the partnership deed.
13. Details of Tools, tackles, equipment and personals available with firm relevant to the job/subject
14. Copy of the updated valid labor contract license from the appropriate authorities and updated
workman group insurance policy covering labor engaged.
15. Details of skilled/semi-skilled persons presently employed by the contractor having sufficient
knowledge of similar jobs.
16. TPI should be mandatory to submit as per cl no.5 of Section B (i.e General Instruction to
the bidders).
The above documents will be analyzed and after satisfaction, the price bid will be opened. GSECL may
verify the documents, experience certificates from authority who have issued such certificates / details.
On opening of Technical Bid, if any required attested documents are missing in technical bid submitted by
inform only once by Registered post to bidder/bidders to submit the missing required
documents within stipulated time limit and failing which bidder/bidders will be declared
technically disqualified for not submitting the required documents along with technical bids
without any further notice. However, document will be considered valid only if it is for the period of
last day of month previous to the one in which tenders are invited.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
GENERAL INSTRUCTIONS TO THE BIDDERS
1. SUBMISSIOIN OF TENDER
The tender should be uploaded/ submitted online on n-procure process.
Technical bid cover:- This cover shall contain all relevant attested qualifying documents as
prescribed in tender notice along with tender fee & EMD. Bidder shall have submit Tender Fee and
EMD cover only, All other require document to be upload on online (n)procure process only
Note: - If attested copies of qualifying documents stated as prescribed in tender notice are not
found in on-line Technical bid, but same should be submitted by mail during scrutiny will be
treated as final to consider the bid for pre-qualification. Any missing documents, if required will
be asked from the bidder as mentioned in this tender elsewhere. If party has not submitted
tender in online is liable to be ignored.
Technical Bid
“Please note that the Notarized / self-attested copies of original required documents should be
invariably uploaded in n-procure portal before due date and time in pdf form (Scanned copy).
This is mandatory. No physical documents are required to be submitted except tender fee and
Price bid:-
The price bid shall have to be submitted online only. The percentage rates and price shall be
written both in words, and figures and the units in words. In case of any ambiguity or mistakes, the
unit rates and prices written in words shall be considered as final.
Offered rate shall include cost of all Materials, wastage of material , Labours for all leads and lifts,
Supervision, setting out works, Machinery and equipment with its mobilization / demobilization,
transportation charges, Clearing of the site both prior to commencement and after completion of
work. Consumables such as, but not limited to petrol, oil, diesel, lubricants, drill bits, pipes, ropes
etc. Construction facilities such as scaffolding, tarpaulins, wind break, etc., Overheads / profits of
Contractor for due performance of the work under this contract.
Applicability of goods and service tax:-
1) The tenders shall be evaluated on firm price and cost with GST and cess as applicable unless
otherwise mentioned in the tender documents.
2) IF the supplier/contractor have opted for the composition scheme of GST, the same must be clearly
specified with valid declaration and certificate from department. In the event of withdrawal/
cessation of the supplier from composition scheme during the tenure of the contract, the rate(i. e.
price) mentioned in the price bid shall be final and any additional GST will have to be borne by the
tenderer himself, In no case additional amount towards GST or otherwise will be paid/reimbursed to
supplier/contractor.
3) The bidder shall have to inform their GST no. of the registered place(s) where from the bidder
intends to supply the goods/services, meaning there by the bidder has to supply the goods/services
from the relevant declared/ registered place(s) of supply only.
4) The bidder shall not include GST in their quoted rates; but the bidder has to separately indicate the
GST rate, amount in the price bid schedule.
5) In-case Govt notification comes for change in GST , the same will be applicable.
6) Bidder should indicate GST no.( copy of GST registration to be enclosed) and PAN NO. (copy of PAN
to be enclosed) Tenders submitted without GSTIN No by the firms, the offer will be rejected without
entering into further correspondence.
Further information required, if any, can be had from the office of the Chief Engineer, GSECL,
GTPS. But it must be clearly noted that the tenders must be received complete in every respect
by the due date and time.
i. The bidder must clearly quote rates in figure as well as in words. In case of any discrepancy,
whatever written in words shall prevail.
ii. No deviation in terms & conditions, Schedule-B and technical specifications will be entertained.
Any ignorance for this shall not relieve the contractor from his contractual liability arising as per
EW- 372 PUR-F-006 RFQ-
tender documents and conditions contained in it.
iii. The bidders are required to quote only firm prices. No variation will be accepted on price/ raw
materials/ finished products or on any other cause.
iv. The bidders should note that the completion of above mentioned works in all respect in
accordance with the time limit given is very important and should be strictly adhered to. The work
is to be completed in time limit from the date of issue of written order to commence the work by
the Chief Engineer (Gen.), GSECL, Gandhinagar TPS.
v. The bids should be valid for a minimum period of 180 Days from the date of opening of
technical bid. During this period tenderer shall not be allowed to withdraw their tender and if
withdrawn, the Earnest Money Deposit submitted with the tender will be forfeited.
vi. The works covered under these specification shall be carried-out and governed by “Tender and
contract for Works” booklet appended herewith except where conditions specified in this
specifications.
vii. The successful bidder shall have to enter in to an agreement for contract as per G.S.E.C.L rules
on a stamp paper of Rs.300/- and necessary stamp duty charge shall be borne by the
contractor/consultant.
viii. The complete specification comprises of the following.
Bill of Quantities (Schedule-B), instructions to the bidders, Tender specifications and scope of
work, Tender and contract for Works booklet, General Conditions, Instructions to bidder &
Technical specifications. All these sections are complimentary to each other. The particulars and
requirements contained herein shall cover the execution of the works covered under these
specifications.
ix. The tenderer must visit the site of works and see for him self the site conditions regarding
availability of approach road during all seasons and other matters affecting the above works
before submitting the tender.
x. The submission of tender by a contractor implies that he has read these instructions the
conditions of contract etc. and has himself aware of the scope and specifications of the work to be
done and of conditions and local conditions and other factors bearings on the execution of the
works. GSECL will not therefore after acceptance of contractor's rate pay any extra charge for any
other reason; in case the contractor is found later on to have misjudged the site condition.
xi. GSECL’s authorized officers who accepts tender, shall have the right of rejecting all or any of the
tenders and will not be bound to accept the lowest offer nor to assign any reason whatsoever for
the rejection of any tender or all tenders.
xii. Bidders shall provide evidence of their continued eligibility to the satisfaction of the owner.
xiii. Bidders shall not be listed under a declaration of ineligibility for corrupt or fraudulent Practices
issued by the Govt., the list of black listed Contractors announced by GSECL (erstwhile GEB) Govt.
of Gujarat or its Public Sector undertakings or the contractors who are under stop dealing in
GUVNL and /or their any subsidiary company viz. GETCO/MGVCL/UGVCL/PGVCL/DGVCL.
xiv.The bid, and in case of a successful bid, the Form of Contract Agreement, shall be signed with
the name of Firm / company which will be legally binding on all partners / parties.
xv.If the application is made by an individual, it shall be signed by the individual above his full
typed written name and current address.
xvi.If the application is made by a proprietary firm. It shall be signed by the proprietor above his
full typed written name and the full name of his firm with its current address.
xvii.If the application is made by a partnership firm, it shall be signed by all the partners of the
firm above their full type written names and current addresses or alternatively by partner
holding power of attorney for the firm in which case a certified copy of the power of attorney
shall accompany the application. A certified copy of the partnership deed, full names and
current addresses of all the partners of the firm shall also accompany the application.
xviii. If the application is made by a limited company or a Corporation, it shall be signed by the
authorized person holding power of attorney for signing application in which case a certified copy
of the power of attorney shall accompany the application. Such Limited company or
Corporation may be required to furnish satisfactory evidence of its existence before the pre-
qualification evaluation. They should also furnish Articles of Memorandum of Association. If the
application is made by group of companies, it shall be signed by the authorized person. The
authority letter shall be accompanied with the application.
EW- 372 PUR-F-006 RFQ-
2. SECURITY DEPOSIT.
In tender process for L1 bidder(lowest bidder) security deposit will be charged as per
table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than Rs.
Lakh 5 Lakh
Enterprise or Organization Exempted 3% of Order Value
which are exempted from
paying Tender Fee & EMD
For all other Enterprises 5% of Order Value 5% of Order Value
ELIGIBILITY FOR EXEMPTION:
1. Micro & small-scale enterprises which participate directly in tendering process for the product
which they are manufacturing / service which they are providing and have Udyam
registration for items / service under procurement and having registration with CSPO or
National Small Industries Corporation.
2. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the Start-up
India Program and has obtained Udyam registration & CSPO/NSIC registration as MSE.
3. Organization which has registration certificate for the manufacturing product of the tender,
from Gujarat Khadi Gramodyog Board or Khadi and Village Industries Commission(K.V.I.C)or
Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own manufactured
5. State Government recognized organizations like(i) organizations for blinds, dumb and deaf,
disabled, mentally disabled persons;(ii)women's self-help group recognized by Gujarat
Livelihood Promotion Company; which participate directly in tendering process for the product
which they are manufacturing / service which /they are providing
Note: Security Deposit will be collected from the successful tenderer at the rates mentioned
above. This may be recovered by deduction through running bills of the contractors and / or by
treating the Earnest Money Deposit (Bid Security) paid at the time of submission of the tender.
6. The Bank Guarantees will be executed on the standard form prescribed by the corporation. In case of
the Bank Guarantees furnished / submitted, they should have clear one time validity till the
completion of the order in all respects and up to the expiry of Guarantee period from the date of the
work completion. Bank Guarantee for Interim period will not be allowed. If by any reasons the work
period is extended then contractor should undertake to renew the Bank Guarantee at least one
month before the expiry of the validity failing which GSECL will be at liberty to encash the same.
“It shall be mandatory to submit security deposit as per above table within 10 days from
the date of issue of Letter of Intent before order placement. In case when successful
bidder not at all responding within notice period or withdraws his offer then his EMD
shall be forfeited and he will not be allowed to participate in the tenders invited from the
same office for the period of One year for that place from where tender is invited.”
If the Tenderer fails to pay the Security Deposit or defaults in execution of the
orders placed or if GSECL suffers any financial loss due to this, then GSECL will be at
liberty to adjust the amount from other orders of the same firm or by encashing the Bank
Guarantee.
All the costs of the stamp papers, other than required for payment is to be made through
SIDBI / ICICI by Board, are to be borne by you as per the Govt. of India’s latest guidelines.
The security deposit shall be released on finalization of final bill / successful completion of the work.
The same shall be paid in DD or in the form of Bank Guarantee on any of the banks describe in Annexure-I
as per the GoG notification issued from time to time will be applicable. Total S.D. equivalent 5% of contract
value is to be recovered from the first RA bill.
3. MAINTENANCE:
i] The contractor shall be responsible to make good and remedy at his own expense any defect
EW- 372 PUR-F-006 RFQ-
which may develop or may be noticed before the period mentioned hereunder from the certified
date of completion. The same shall be attended within 15 days of receipt of the notice. In the
case of failure on the part of the contractor, the Engineer-in-charge may rectify or remove or re-
execute the work at the risk & cost of the contractor. The Engineer-in-charge shall be entitled to
appropriate the whole or any part of the amount of security deposit towards the expenses, if any,
incurred by him in rectification, removal or re-execution. The defects liability period shall be as
For all works costing more than Rs. 50,000 and up to Rs. 1 crore (Work Order amount), the period
shall be 06 months from the certified date of completion OR one monsoon, whichever is later.
4. TIME LIMIT FOR WORK:
The scheduled time limit for the completion of work shall be 02 (Two) calendar months from the
date of issue of letter to commence the work. However extension in time limit will be granted by
GSECL for the genuine reasons only as per terms of the contracts.
5. TERMS OF PAYMENTS:
Contractor shall be paid RA bill after observing GSECL’s general procedure and submission of bill
by the agency. Also, 75% payment shall be made immediately within a week period on receipt of
recorded bill by Account Section without checking of detail bill and compliance of queries &
statutory requirement. However, remaining balance 25% amount shall be released only after
through checking of detail bill and compliance of various quarries, statutory compliance etc. The
above payment term is applicable to all the bills of general civil works & ARC/BRC works, provided
the bills are recorded regularly and submitted to Account Section within Ninety [90] days. If the
contractor fails to submit the bills regularly in such a way so that the same cannot be recorded
and submitted to account section within Sixty [60] days, ad-hoc payment as stated above, may
not be released and payment will be released as per GSECL’s general procedure. The period of
Sixty [60] days shall be considered from the date of receipt of last R.A. Bill by Account Section.
6. (Applicable for Works tender having estimated cost upto Rs. 1.00 Crore (without
Tax)): “All bidders shall submit the details/documents in support of Technical Qualification
Requirements duly certified and verified for authenticity from Specified Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm along with a
certificate regarding verification of authenticity of documents as per the format placed at
Appendix 1. All the documents submitted by the bidder in support of meeting Technical QR only
shall be digitally signed by the Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor
of their Company or Practicing CA/CA Firm.
The verification and certification of authenticity of documents is acceptable from any of the
following TPI As:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt Ltd.
9. M/s Bureau Veritas (india) Pvt. Ltd.
10. Hertz Inspection & services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
The Bidder shall be responsible to get their documents/ credentials verified & certified by the
Specified Third- Party Inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm in support of Technical QR. All the costs pertaining to third party verification
and certification (including those by statutory auditors) shall be borne by the Bidder. GSECL shall
have no liability (financial or otherwise) towards the same and shall not be liable for any claim/
dispute between the bidder and the Specified Third-Party Inspection Agency (TPIA) or Statutory
Auditor of their Company or Practicing CA/CA Firm.”
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in//accreditation/reg_bod_inspection_bodies.php.
EW- 372 PUR-F-006 RFQ-
Annexure-1
Undertaking from Third Party Inspection Agency/Statutory Auditor or
Practicing CA/CA Firm
(On letter head digitally signed by a person duly authorized to Sign on behalf of the
Ref: Date:
Power Station ……………….
Subject: Authentication of veracity of documents submitted by M/s …… in support of
Meeting the Qualifying Requirements
Ref: Tender no. …………………..
Name of the Package/ Tender: ………………………………………
M/s. ……………… (here in after called Bidder) having Registered office at ………………
intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party
Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA
Firm as per the list mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents,
which are also attached with this letter. The same has been verified from the Original
Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and
authentic.
1. Doc ref. no. ……….. Dated …….. (Name of Documents)
2. Doc ref. no. ……….. Dated …….. (Name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of
authenticity.
We further confirm that we neither have any vested interest in aforesaid tender nor
have any conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose of
participating in the subject tender/s
Thanking you,
EW- 372 PUR-F-006 RFQ-
7. ASSIGNMENT:
The rights and liabilities of the contractor shall not be assigned or transferred by them without
the consent in writing of the GSECL to any other person, firm or organization.
8. The successful Bidder, on receipt of letter of intent will submit within a week's time his planning /
programme of works, for scrutiny of the GSECL in a Bar Chart format, clearly indicating GSECL's
inputs also. Contractor will plan his works such that simultaneous work should progress in such a
way that entire job is completed in scheduled time limit on all the fronts released by GSECL.
9. The successful bidder will have to depute his authorized representative to attend progress review
meetings to be held at GSECL, Gandhinagar TPS without any extra cost.
10. The Contractor will be responsible for complying with all rules and regulations and labour laws
applicable to him and the GSECL will not be responsible for any lapses committed by them. If there
is any claim from any Government authority pertaining to the contract, the same amount will be
deducted from the Contractor's bill.
11. The time limit for completion of work is stipulated as in the tender will be adhered to.
12. The Contractor's rates should be firm and no variation clause is to be quoted by the Contractor and
GSECL will not accept the same, during contractual period including extended time limit if any.
13. BIDDER TO STUDY, ANALYSE & CONSIDER:
a) The information given in this specification is in good faith and meant to serve as a
guide to the Bidder. It is, therefore, imperative that Bidder shall obtain and examine for himself all
the data, information and particulars required for the satisfactory execution of the work under this
tender. The submission of a bid by Bidder implies that he has fully read the specifications, bid
drawings, instruction to the bidder along with Contract Document and Conditions of Contract,
applicable labour laws, safety norms etc., and has made himself aware of the scope and the
specifications for the work to be performed and local conditions and other features which have a
bearing on the cost and execution of the work. This specification is intended as a general
description of quality envisaged for materials and workmanship and of the finished work. It is not
intended to cover minute details. The work shall be executed in accordance with the best modern
practice and to the complete satisfaction of the Purchaser. Special techniques approved by the
Purchaser shall be used if and where found necessary. This specification shall have precedence if
anything contrary to this is stated elsewhere in the contract documents. The Purchaser’s decision
shall be final and binding on the contractor on any issue arising out of such discrepancies.
b) Inspection of site by bidder:
Before submission of his bid, Bidder shall inspect the site, examine and obtain all information
required and satisfy himself regarding matters such as:
weather characteristics,
Location of site and access, right of way, means of communication & mode of Transport to site,
The type and number of equipment and facilities required
The quantity of various items of the work.
The availability and rates of material.
Labours condition.
Local working conditions, obstructions and hindrances that may arise etc.
Power house, which is under running conditions.
Required GSECL’s security checks.
All materials brought to site only after making entries in security register at Control gate
c) These factors are likely to affect the satisfactory completion of work and or cost thereof.
The submission of a bid by the Bidder will be construed as evidence that such an
examination was made and any later claims/ disputes in regard to rates quoted shall not be
entertained or considered by the GSECL.
d) The site visit shall be done by the bidder on his own responsibility and all liabilities including
cash, arising out of the site visit shall be at the bidder’s account.
e) Contractor’s scope of work shall also include making all necessary arrangements for access
to work sites, stores and site offices etc. from the nearest approach road to facilitate
transportation of man power, machinery and equipment duly considering the existing site
conditions. No extra claims / costs will be entertained by GSECL.
f) The bidder shall carefully study the work to be carried out & consider all the factors & shall
take into account &consider all the factors such as lead, lift haulage of materials, sequence
EW- 372 PUR-F-006 RFQ-
of construction, etc. & shall allow for all such information / data in the rates quoted.
g) The GSECL will not pay any extra charges or rate for any reason in case the contractor
claims, after acceptance of contract to have misjudged the site condition. Ignorance of the
intents and contents of the specification document and site conditions shall not be accepted
by the Owner as basis for any claims for compensation.
h) BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as sub-surface conditions, water records, access to site,
communication, transport, right of way, the type and number of equipment and facilities
required for the satisfactory completion of work, the quantity of various items of the work,
the availability and rates of material, local working conditions, uncertainties of weather,
obstructions and hindrances that may arise etc. which may affect the work or cost thereof,
before submission of his bid. Ignorance of site conditions shall not be accepted by the
ENGINEER IN CHARGE as basis for any claim for compensation.
i) The rates quoted by BIDDER shall be based on his own knowledge and judgment of the
conditions and hazards involved and shall not be based on any representations of the
Engineer in Charge. No claim on this account shall be admitted by the GSECL.
j) The bidders shall submit on online in n-procure with their offer without any deviations in
general terms and conditions of the contract or in technical specifications.
k) Tenders received after the time and date specified in the tender notice will not be accepted.
Once the offer is submitted by bidder before due date of submission, the bidder shall not be
allowed to submit revised/ additional/ modified offer even before due date and time of
submission of tender. However, if the date of issue and/or submission of tender are
extended by the Corporation due to any reason, the bidder may submit if their wishes the
revised/additional/modified offer before extended due date and time of submission.
l) The Corporation reserves the right to accept any tender irrespective of whether it is lowest
or not or to reject all the tenders without assigning any reasons thereof. Tenders deferring
from the technical specifications or the method of bidding in a radical manner may also be
m) The bidder shall be presumed to have carefully examined the drawings, conditions &
specifications of work & to have fully acquainted themselves with all details of the site
conditions, locations, materials, geological & weather characteristics, labour conditions & in
general all the necessary information and data etc. pertaining to and need for the work.
n) This specification is intended as a general description of quality envisaged for materials and
workmanship and of the finished work. It is not intended to cover minute details. The work
shall be executed in accordance with the best modern practice and to the complete
satisfaction of the Purchaser. Special techniques approved by the Purchaser shall be used if
and where found necessary. This specification shall have precedence if anything contrary to
this is stated elsewhere in the contract documents. The Purchaser’s decision shall be final
and binding on the contractor on any issue arising out of such discrepancies.
o) Each bidder shall also submit a 'Declaration' to the effect that the tenderer is an engineering
construction firm or an association of firm or firm which has successfully carried out large
works of this nature and has adequate organization and experienced personnel to handle
this type and magnitude of work. Information should also be given regarding the
constitution of the firm; it’s authorized, subscribed & paid up capital, the date & place of
registration, the place of business, the names of the directors and other relevant
information.
p) It is the intent of the ENGINEER IN CHARGE to incorporate these specification documents in
the final ‘Contract’. BIDDERS are required to review these documents and clearly state in
their proposals their acceptance of the same.
q) Each page of the bid document including the bid drawings shall be signed, stamped and
dated in ink by the BIDDER as a token of having examined the same. Any correction in
price and the rates entered in the Schedule of Price shall also be signed and dated by the
BIDDER in ink, before submitting the bid. Non-compliance with this condition will make the
bid liable for rejection.
r) All safety measures as required to be adopted as per the Statutory Regulations and the
Safety Rules of the Plant shall be strictly followed by the Contractor during the execution of
EW- 372 PUR-F-006 RFQ-
the Contract. The Contractor shall set up a suitable safety organization of his own in this
s) In connection with the execution of the Contract, the Contractor shall comply with all
applicable statutory Rules & Regulations including employment of labours at site.
t) The Contractor shall carry out any and all such works, as may be required, for civil work to
be completed in all respect as per the Contract Specification.
u) If the GSECL Engineer-in-Charge is not satisfied with the progress of work at site, he shall
direct the Contractor to depute more numbers of supervisory personnel/workers to meet the
completion schedules as per the Contract. Upon receiving such direction, Contractor shall
deploy additional personnel within 7 days without any extra cost.
v) The GSECL may during the progress of work, order the removal of part or whole of the work
executed, found not in accordance with the specifications/ instructions. No extra claims shall
be entertained for re-executing or altering of such work.
14. SAFETY MEASURES:
The contractor shall ensure the safety of workers, material and structure including existing
structures during execution of the contract. Safety measures shall be followed during
operations of equipments/machinery being used. No separate payment shall be made for
the safety measures and the quoted rates shall include the cost for all safety measures.
15. COMPLETENESS:
Any technical services as set forth here in above and which might not have been specifically
mentioned in this Contract relating to the work or in the specifications and which are not
expressly excluded therefore but which are necessary for the performance in accordance
with the specifications as an integral part of the painting and misc. Civil works shall be
rendered by the Contractor without any extra cost.
16. TOTAL RESPONSIBILITY
The Contractor shall be solely responsible for the entire technical works / services
irrespective of works / services have been made /rendered by him.
17. PAYMENT TO THE LABOURES:
(a) Contractor has to pay the CPF as well as salary to his skilled/unskilled manpower by cheque A/c
payee only, as per minimum wages & prevailing applicable rules on or before 7th day of next
(b) Contractor has to produce challan of PF with list of employees.
(c) Contractor shall have to make payment to his labours in presence of Personal Officer (Estt.)
GSECL, Gandhinagar TPS.
18. CONTRACT AGGREMENT ON ACCEPTANCE:
The successful contractor will have to sign an agreement as per the Gujarat State
Electricity Corporation Ltd.'s rules on stamped paper and the necessary stamp duty
charges shall be borne by the contractor.
On acceptance of the tender the name (s) of the accredited representative (s) of the
tenderer who would be responsible for taking instructions from the Engineers of the GSECL
shall be communicated to Chief Engineer (Gen.) Gandhinagar Power Station, Gujarat State
Electricity Corporation Limited.
19. Unsatisfactory progress of the work:
If the work is found not progressing as per the requirement or found not satisfactory then
GSECL will take such action to get the work done through the other agency at agency’s risk
and cost with 15% supervision charges and same will be recovered from agency.
20. The EMD will be returned promptly to the unsuccessful bidder except that of L1, L2 & L3 till the
successful contractor pays the Security Deposit as mentioned in tender document or after the
expiry of the validity of the offer, whichever is earlier.
The EMD will be returned to the successful tenderer after he furnishes the Security Deposit
for the tender work. If he fails to furnish the SD, his EMD shall be forfeited and the
tenderer will not be allowed to participate in the tenders invited by this office for a period
of ONE Year in respective Power Station.
The EMD in form of Bank Guarantee shall be valid for Ten Months from the date
of submission of the tender.
21. Effect and validity of Bid: The submission of bid with these documents and specification shall
constitute an agreement that bidder shall have no cause of action or claim against the GSECL for
rejection of his bid. The GSECL shall always be at liberty to reject or accept, split any bid or bids at
EW- 372 PUR-F-006 RFQ-
its sole discretion and any action will not be called into question and the bidder shall have no claim
in that regards against the GSECL.
22. Stop Deal / Banned for business dealing / Blacklisting :-
Has submitted fake, false or forged documents/certificates
Has revised/ withdrawn price bid after opening of Techno-commercial bid, until and unless
it is sought for,
Has tempered with the stipulated tendering procedure.
Has refused to accept Letter of Acceptance / Purchase order / Work Order after the same
is issued by the company within the validity period and as per agreed terms and
conditions,
Has committed breach of contract or has failed to perform a contract or has abandoned
the contract,
Has failed to provide suitable expertise for the work as per pre-scheduled program.
Has failed to submit all the necessary tests reports / documents within time scheduled / as
per company’s time limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is
placed subject to submission of type reports / documents to the firm.
Has indulged in construction and erection of defective works.
Has supplied inferior quality / defective materials and refused to replace with stipulated
time frame, as specified by the company,
Has substituted materials in lieu of materials supplied by the company or has not returned
or has short returned or has unauthorisely disposed of materials / documents / drawings /
tools or plants or equipment supplied by the Company,
Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
Has unauthorisely obtained official company information or copies of documents, in
relation to the Tender / Contract.
Has failed to follow the stipulated mode of communication, if specified by the tendering
authority / Purchaser.
Has parted with, leaked or provided confidential / proprietary information of the company
given to the firm only for its use (in discharge of its obligations against an order) to any
third party without prior consent of the Company,
Any other ground for which in the opinion of the Company makes it undesirable to deal
with the Firm
In case the state Government directs the Company to place a firm in stop dealing /
banned for business dealing / blacklisting.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
SECTION-C:
GENERAL CONDITIONS OF CONTRACT
EW- 372 PUR-F-006 RFQ-
GENERAL CONDITIONS OF CONTRACT
1. DEFINITIONS :
(a) The Contract means the documents forming the tender and acceptance thereof, together
with the documents referred to therein or individual work order in the case of term
contract, including these conditions, schedules and/or additional conditions attached to
the form of tender or individual works, order, rate schedule, the specifications and the
drawings and all these documents, as applicable, taken together shall be deemed to form
the contract.
(b) The “Tender Document” means the form of tender, the applicable schedules and/or
additional conditions and the specifications and/or drawing as issued to the contractors
for the purpose of preparing tender.
(c) The expression “Works” or “Work” when used in the condition of contract shall, unless
there be something in the subject or context repugnant to such construction means, the
works or the work contracted to be executed under or in virtue of the contract whether
original or altered.
(d) The “Contractor” means the individual or firm or Corporation, whether incorporated or not,
undertaking the words and shall include his or its legal personal representatives,
successors and permitted assignees.
(e) “Corporation” means The Gujarat State Electricity Corporation Ltd. and the “Accepting
Officer” means the Officer who is authorized to sign and signs the contract on behalf of
the “Corporation”.
(f) The letter “EE” means Executive Engineer who in the case of measurement and lump
sum contract, direct the contract and the letters “SE” means Superintending Engineer and
“GM” means General Manager who administers and in the case of the term contracts,
directs the contract.
(g) The “Engineer-in-charge” means all officers of the Corporation appointed by the General
Manager to supervise the works or part of the works.
(h) “Approved” and “Directed” means the approval or direction of the Chief Engineer (Gen),
Gandhinagar TPS to Superintending Engineer or the person deputed by him for the
particular purpose.
(i) “BS.” means “British Standards” as issued by the British Standards Institution. “A.S.”
means the “American Standards” as issued by the American Standards Institution, and
“I.S.” means the “Indian Standards” as issued by the Indian Standards Institution.
Wherever the above-mentioned abbreviations are referred to, in the specifications and/or
work orders, they mean the addition with all amendments current at the date of issue of
tender document of work orders.
(j) In the case of measurement and terms of contract “Specifications” mean those contained
in Gujarat State Electricity Corporation Ltd. scheduled together with any amendments etc.
embodied in the tender documents. “Drawing” refers to those incorporating the tender
documents and/or any work orders referred therein.
(k) The “Contract Sum” means the sum accepted or the sum calculated in accordance with
the prices accepted in the tender and/or the contract rate as payable to the contractor for
the full and entire executing and completion of works.
(l) “The date for completion” is the date or dates of completion of the work or any part of the
works set out or ascertained in accordance with the individual work orders and the tender
documents or any subsequent agreed amendments thereto.
2. CONTRACTOR TO INFORM HIMSELF FULLY:
A. Notwithstanding anything contained to the contrary in the specifications or tenders in
subsequent exchange of correspondence, the conditions of contract shall be binding on
the Contractor and any change or variation expressed or implied, however made in the
said conditions, shall not be valid or operative unless expressly sanctioned by the
Corporation. The Contractor shall be deemed to have fully informed himself and to have
special knowledge of the provisions of the conditions of the Contract herein contained.
B. The contractor shall be deemed to have carefully examined the work and site conditions,
the general conditions, the special conditions, specifications, schedules and drawing
and shall be deemed to have visited the site of the works and to have fully informed
himself regarding the local conditions.
EW- 372 PUR-F-006 RFQ-
C. If there shall have any doubt as to the meaning of any portion of these general
conditions or special conditions of the scope of work of the specifications or any other
matter concerning the contract, he shall in good time before submitting his tender, send
for the particulars thereof and submit them to the Engineer-in-charge in writing in order
that such doubt may be removed.
3. CONTRACT DRAWING AND SPECIFICATIONS:
The contractor will be entitled to receive one set of agreement along with one certified
copy of accepted tender.
The drawings which form part of these specifications show the work to be done in as
much detail as is possible at the present stage. They will be supplemented by such
additional detailed drawings as may be necessary as the work progresses. The contractor
shall perform the work on these features and in accordance with these additional or
revised drawings as the case may be and at the applicable rates as per the contract.
The contractor shall check all drawings carefully and shall bring to the notice to the
Engineer-in-charge immediately of any errors or omissions discovered. The contractor
shall not take advantages of errors or omissions of any kind in the drawings supplied.
4. INPUTS BY GSECL:
The electric power supply and connection for construction / work purpose shall be given at
one mutually agreed point at work site free of cost by the GSECL. Further extension for
construction site as well as bore well site for using construction water will have to be
carried out by the contractor as per requirement at their cost. The necessary electric
charges will be paid by the contractor as per rates prevailing from time to time in the
respective DISCOM.
1. If there are any surplus quarters available after meeting the requirement of GSECL's staff,
then GSECL will consider allotment of quarters on rent as per GSECL's rule.
2. The contractor will have to make their own arrangement of water for construction
work as well as for their labourers at his own cost. If possible, water for construction
purpose only at one point as decided by EIC and recovery for water charges shall
be affected at the 2 % of the item of which water is used or by quantity measured by
meter reading of water meter installed by contractor, rate of water supply will be
charged at prevailing purchase rates of GSECL, for water supplied by GSECL is
used as certified by EIC. In case of agency is installing bore well and pumps at his
cost, after completion of work agency will hand over the bore well in good condition
with pumps to the GSECL.
5. DATA TO BE FURNISHED BY CONTRACTOR:
The contractor shall submit to the Executive Engineer for approval within one week of the
date of contract, a layout plan of construction plant and equipment for the execution
of work which the contractor proposes to adopt at site.
Prior to commencement of work, the contractor shall submit to the Executive Engineer
for approval, plans in triplicate showing the location of Major plant shop and storage
buildings, storage yards, offices, contractor's power house including its services and
housing facilities which he proposes to put up at site and also indicate the programme of
The successful bidder on receipt of letter of intent will submit within a week's time his
planning/programme of works for scrutiny of GSECL in a PERT/Bar chart format, clearly
indicating GSECL inputs also.
Contractor will plan his works such that on all the fronts released by GSECL,
simultaneous work should progress in such a way that entire job is completed in
scheduled time limit.
No change in the approved layout shall be carried out without specific written approval of
the Executive Engineer.
6. ERRORS, OMISSIONS AND DISCREPANCIES:
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or
discrepancies in the drawings and items of work in specification, reference shall be
made to the Executive Engineer whose elucidation and elaboration shall be considered
as authoritative. The contractor shall be held responsible for any error that may occur in
the work thorough lack of such reference and precautions.
7. SECURITY DEPOSIT:
EW- 372 PUR-F-006 RFQ-
SECURITY DEPOSIT: In tender process for L1 bidder (lowest bidder)
security deposit will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than Rs.
Lakh Lakh
Enterprise or Exempted 3% of Order Value
Organization which
are exempted from
paying Tender Fee &
For all other 5% of Order Value 5% of Order Value
Enterprises
bidder) is not willing to pay SD in advance, either EMD may be converted to SD or
SD may be deducted from 1st or subsequent invoices/RA bills with consent from the
bidder. However, PO/LOA should be placed before commencement of work, except
in some emergency cases where special approval must be obtained from the
Executive Director (Gen.) at Corporate Office.
After issue of Work order and Date of commencement, if successful bidder failed to start the
work then, RPAD notice will be issued to the successful bidder mentioning that on failing to
start the work within next 07 days from the date of issue of RPAD Notice the EMD will be
forfeited and he will not be allowed to participate in the tenders invited from Gandhinagar
TPS office for the period of One year.
The security deposit of the contract value shall be released on finalization of final bill /
successful completion of the work.
All damages, costs, charges, expenses and other sums which may be or may become
due or payable by the contractor to the Corporation under the terms of the contract, may
be deducted from the cash in the proceeds of sale of the securities/bank guarantee so
deposited (which the officer or person to whom the same may be endorsed as aforesaid
is hereby authorized to sell/to encase for that purpose) or from the interest of any such
securities or from any sums due or which may become due to the contractor by the
Corporation or from the whole or the balance unpaid as aforesaid of the encase
securities so deposited being repaid or transferred and returned as the case may be, to
the contractor on finalization of final bill OR after 06 (six) months of successful
completion of the work, whichever later OR on furnishing of the Performance Bond
amounting to 5% of contract value against the defect liability period as mentioned in this
document elsewhere.
If entire security deposit is paid in approved form of Bank Guarantee should be remain
valid during the contractual period and such bank Guarantee should not be reduced on
the basis of the work actually done.
8. USE OF LAND:
The land required for office, godowns and for labour camp if not available with GSECL,
then the contractor has to arrange the same at his cost. GSECL will give the land only if
the spare land is available with the following conditions.
The contractor shall be permitted to use for the bonafide purpose of execution of this
contract free of cost. The contractor shall be permitted to use for the bonafide purpose
of execution of this contract free of cost.
1. Site required for the construction of the work.
2. Required approach road. The contractor shall make their own arrangements for the
necessary approach, road, for transport of their materials and be responsible for the
compensation on account of damage to crop etc. and shall till completion of work.
3. He will be charged the rent at the annual rate of rupees one hundred per every acre
or part thereof, for the construction of temporary hutments and his store yard.
However area required for such purpose may be clearly indicated in this offer.
All areas of operation, including those for his staff and labour colonies handed over to
the contractor shall be cleared and handed over back in good condition to the
EW- 372 PUR-F-006 RFQ-
Engineer except areas under works as per this contract or those for which specific
approval has been obtained from the Engineer. The contractor shall make good to the
satisfaction of the Engineer any damage or alternation made to areas which he has
to hand over back or to other property land handed over to him for purpose of this
Temporary structures may be erected by the contractor for storage sheds, offices,
residence etc. for noncommercial use on the land, handed over to him at his own
expense and with the permission of the Engineer. These structures shall comply with
the regulation that may be in force and/or specified by the Engineer with regard,
thereto. In any circumstances for constructing temporary structures for contractor's
use, GSECL's free supply materials shall not be used. If it is found that GSECL's free
supply materials are used for other than approved project drawings work, same will be
recovered at
penalized rate.
The contractor shall preserve all existing vegetation such as trees on or adjacent to the
sites which do not interfere with the construction as determined by the Engineer.
The contractors shall take all possible precautions in felling trees authorized for
removal to avoid any unnecessary damage to vegetation and trees not to be felled
and to structures under construction, or to workmen, and shall be responsible for any
damage if it occurs in such operations
All produce from cutting of trees; grass etc. shall be the property of GSECL and shall
be stocked at the place specified by the Engineer. No claim shall be made for such
cutting and stacking of trees or grass etc. by the contractor
The contractors shall not unnecessarily or for use as fuel, cut any trees brush wood,
grass or other vegetation nor shall set fire there to without the written permission of
the Engineer. When such permission is given, the contractor shall take necessary
measures to prevent damage or to prevent fire spreading to surrounding property, and
shall be responsible for any such damage, if cause.
The land shall as herein before mentioned be handed back to Engineer in Charge
immediately after the completion of the work under this contract. Also no land shall
be held by the contractor longer than the Engineer shall deem necessary and the
contractor shall, on due notice by the Engineer, vacate and return the land which the
Engineer may certify as no longer required by the contractor for purpose of the work.
9. START OF WORK:
The contractor shall not enter upon or commence any portion of work except with the
written authority or instructions of the Executive Engineer or his subordinate in charge of
the work, failing such the contractor shall have no claim to ask for measurement or
payment for work and shall be responsible for any claims or damages that may arise
due to such unauthorized commencement or entry.
10. COMPENSATION FOR THE DELAY:
The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the contractor and shall be reckoned from the date on which the order to
commence work is given to the contractor. The work shall throughout the stipulated
period of contract be proceeded with all due diligence (time being deemed to be the
essence of contract) and for delay, the contractor shall pay compensation, an amount
equal to ½ (half) percent per one week for the contract amount or part thereof, including
taxes & duties ( i.e. End cost of contract amount including taxes & duties) and maximum
up to 10 % of the order value, including taxes & duties ( i.e. End cost of contract amount
including taxes & duties) or such smaller amount as per the decision of the Competent
Authority of the GSECL The penalty will be invariably deducted from the bills of the
contractor and no refund will be given unless the competent authority approves the
reduction. The reasons for delay, attributable to GSECL as well as to party will be
brought out clearly while putting the proposal for waiver/reduction in penalty.
11. ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which under any clause or clauses of this contract the contractor shall
have tendered himself to pay compensation amounting to the whole of his security
deposit (whether paid one sum) or in the case of abandonment for the work owing to
serious illness or death of the contractor or any other cause, the Executive Engineer on
behalf of the Corporation, shall have powers to adopt (a) below and any of the following
courses under (b) and (c) as he may deem best suited to the interest of the Corporation.
(a) To rescind the contract (for which rescission notice of 10 days) in writing to the
contractor under the hand of the Executive Engineer shall be conclusive evidence and in
EW- 372 PUR-F-006 RFQ-
that case the security deposit of the contractor shall stand forfeited and absolutely at the
disposal of the Corporation. To employ labour paid by the Corporation, to supply
materials, to carry out the works or any part of the work debiting the contractor with the
cost of the labour and the price of the materials (as to the correctness of which cost and
price, the certificate of the Executive Engineer shall be final and conclusive against the
contractor) and crediting him with value of the work done in all respects in the same
manner and at the same rates as if it had been carried out by the Contractor under the
terms of this contract and in that case the certificate of the Executive Engineer as to the
value of the work shall be final and conclusive against the contractor.
(b) To order that the work of the contractor be measured up and to take such part thereof,
as shall be unexecuted, out of his hands and to give it to another contractor to complete,
in which case, any expenses, which may be incurred in excess of the sum, which would
have been paid to the original contractor, if the whole work would have been executed
by him (as to the amount of which excess expenses, the certificate in writing of the
Engineer-in-charge shall be final, conclusive and shall be borne and shall be paid by the
original contractors and shall be deducted from any money due to him by the
Corporation under the contract or otherwise from his security deposit of his proceeds
sale thereof or a sufficient part thereof.
(c) In the event of the above courses being adopted by the Executive Engineer, the
contractor shall have no claim to compensation for any loss sustained by him by reason
of his having purchased or procured any materials or entered into any engagements or
made any advances on account of or with a view to the execution of the work or the
performance of the contract. And in case the contract shall be rescinded under the
provision aforesaid, the contractor shall not be entitled to recovery or be paid any sum
for any works thereof actually performed by him under this contract unless and until the
Executive Engineer shall have certified in writing the performance of such work and the
amount payable to him in respect thereof and he only be entitled to be paid the amount
so certified.
12. NOTICE UNDER UNSATISFACTORY PROGRESS:
If the progress of a particular portion of the work is unsatisfactory, and also if as per the
opinion/observation of the Executive Engineer (whose decision shall be final) in charge
that the general progress of work is not satisfactory, then Executive Engineer in charge
shall be entitled to take action under clause 11 (c) after giving the contractor ten days’
notice in writing and the contractor will have no claim for compensation for any loss
sustained by him owing to such action.
13. ACTION IN THE CASE OF DEFAULT BY THE CONTRACTOR :
In any case in which any of the powers conferred upon the Executive Engineer by
Clauses 11 and 12 hereof shall have exercisable and the same shall not have been
exercised, the non-exercised thereof shall not constitute a waiver of any of the
conditions hereof and such powers shall not withstanding be exercisable in any further
case of default by the contractor of which, by any clauses hereof, he is declared liable to
pay compensation amounting to the whole of his security deposit and liability of the
contractor for past and future compensation shall remain unaffected in the event of the
Executive Engineer taking action under sub-clause (a) or (c) of Clause 11, he may if he
so desires, take possession of all or any tools, plants, materials, and stores in so upon
the work or the site thereof belonging to the contractor, or procured by him and intended
to be used for the execution of the work of any part thereof paying for allowing for the
same in account at the contract rates, or in the case of a contract rates not being
applicable of current market rates to be certified by the Executive Engineer whose
certificate thereof shall be final. In the alternative, the Executive Engineer may by notice
in writing to contractor or his clerk of works, foreman or other authorized agent, require
him to remove such tools, plant, materials or stores from the premises within a time to
be specified in such requisition, the decision to the contractor failing to comply with any
such requisition, the decision of the Executive Engineer as to the expense of any such
removal and the amount of the proceed and expense of any such sale, be final and
conclusive against the contractor
14. EXTENSION OF TIME LIMIT
If the contractor shall desire an extension of the time limit for completion of the work on
the ground of his having been unavoidably hindered in its execution or on any other
ground, he shall apply in writing to the Executive Engineer and the Executive Engineer
may, if in his opinion there are reasonable grounds for granting extension, recommend
EW- 372 PUR-F-006 RFQ-
such extension as he may think necessary or proper. The decision of the competent
authority in this regard shall be final, and binding to the contractor. Any delay attributed
to Corporation, shall be thus compensated only by way of extending the limit.
15. COMPLETION CERTIFICATE
On completion of the work, the Contractor shall be furnished with Completion Certificate
by the Executive Engineer. No such certificate shall be given nor shall be the work
considered to be completed until works are taken over and/or duly tested and put to
operation as the case may be, nor until the work shall have been measured by the
Engineer-in-Charge or where the measurement have been taken by his subordinates
until they have received the approval of the Executive Engineer the said measurement
being binding and conclusive against the contractor.
16. EFFECT OF THE CERTIFICATE :
No payment shall be made for any work estimated to cost less than Rs.1,000 till after
the whole of said work shall have been completed and a certificate of completion given.
But in the case of works estimated to cost more than Rs.1,000, contractor shall on
submitting a monthly bill thereof, be entitled to receive payments. Proportionate to the
part of the work then approved and passed by the Engineer-in-Charge, whose certificate
of such approval and a passing of the sum so payable shall be final and conclusive
against the contract. All such intermediate payment shall be regarded as payment by
way of advance against the final payment only and not as payments for work actually
done or completed and shall not preclude the Engineer-in-charge from requiring bad,
unsound, imperfect or unskillful work to be removed and taken away and reconstructed
or re-erected nor shall any such payment be considered as admission of the due
performance of the contract or any part thereof in any respect of the occurring of the
claim nor shall conclude, determine or effect in any way the powers of the Engineer-in-
Charge as to the final settlement and adjustment of the accounts otherwise or in any
other way, vary or affect the contract. The final bill shall be submitted by the contractor
within one month of the date fixed for completion of work; otherwise the certificate of the
Engineer-in-charge of the measurement and of total amount payable for the work shall
Engineer-in-charge of the measurement and of total amount payable for the work shall
be final and binding on all parties.
17. PAYMENT TO CONTRACTORS :
The rates for several items of works estimated to cost more than Rs.1, 000 agreed to
within shall be valid only when the item concerned is accepted, having been completed
full, in accordance with the sanctioned specification. In case, where the items of the
work, are not accepted, as so completed, the Engineer-in-charge, may make payment
on account of such items at such reduced rates, as he may consider reasonable in the
preparation of final or running accounts bills and it will be binding to the contractor.
18. BILLS :
The Bill Shall be submitted by the contactor each month on or before the date fixed by
the Engineer-in-charge, for all works, executed in the previous month and the Engineer-
in-charge shall take or cause to be taken the requisite measurement for the purpose or
having the same verified and the claim so far as it is admissible, shall be adjusted, if
possible, within Fifteen days from the presentation of the bills. If the contractor does not
submit the bill, within the time fixed, as aforesaid, the Engineer-in-charge may depute a
subordinate to measure up the said work in the presence of the contractor or his duly
authorized agent, whose counter signature in the measurement shall be sufficient
warrant and the Engineer-in-charge may prepare a bill from such list which shall be
binding on the contractor in all respects. In case if contractor/ representative does not
remain present on specified date for taking measurement than EIC may take the
measurement one sided and the same shall be binding to the contractor irrespective
whether he has signed or not.
19. SUPPLY OF MATERIALS TO CONTRACTOR [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
SCHEDULE A ]
If the specification of the estimated work provides for use of any special description of
material to be supplied from the Corporation’s stores or if it is required that the
contractor shall use certain stores to be provided by the Engineer-in-charge, (such
material and stores and the prices to be charged thereof as hereinafter mentioned being
so far as practicable for the convenience of contractor but not so as in any way to
control, the meaning or effect of this contract specified in the schedule or memorandum
EW- 372 PUR-F-006 RFQ-
hereto annexed). The contractors shall be supplied with such materials and stores as
may be required from time to time be used by him for the purpose of the contract only
and the value of the full quantity of materials and stores so supplied shall be set off or
deducted from any sum due or thereafter to become due to the contractor, under the
contract or otherwise or from the security deposit or the proceeds of sale thereof if the
deposit is held in government securities the same or a sufficient portion thereof, shall be
sold for the purpose. All materials supplied to the contractor shall remain the absolute
property of the Corporation and shall on account be removed from the site of work and
shall at all times be open to inspection by the Engineer-in-charge. Any such materials
unused and in perfectly good condition at time of completion or determination of the
contract shall be returned to the Corporation’s store if the Engineer-in-charge so
requires by notice in writing given under his hand but the contractor shall not be entitled
to return any such materials except with such consent and he shall have no claim for
compensation on account of any such materials supplied to him as aforesaid but
remaining unused by him or for any wastage in or damaged thereto. The contractor
shall be responsible for the loss, destruction or deterioration of the materials, stores or
articles supplied to him by the Corporation even if such loss, destruction or deterioration
has occurred under any circumstances whatsoever beyond his control as if the
materials, stores or articles so supplied were his property.
20. WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS, DRAWING,
ORDERS ETC.
The contractor shall execute the whole and every part of work in the most substantial
and workman like manner and both as regarding materials and in every other respect in
strict accordance with the specification. The contractor shall also confirm exactly, fully
and faithfully to the designs, drawings and instructions in writing relating to the work
signed by the Engineer-in-charge and lodged in his office and to which the contractor
shall be entitled to have access for the purpose of inspection at such office, or on the
site of the work during office hours and the contractor shall, if he so requires, be entitled
at his own expense to make or cause to be made copies of the specification and of all
such designs, drawings and instructions as aforesaid.
21. ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO INVALIDATE
The Executive Engineer shall have powers to make any alterations, or additions to the
original specification, designs and instructions that may appear to him to be necessary
or advisable during the progress of the work and the contractor shall be bound to carry
out the work in accordance with any instruction in this connection which may be given to
him in writing, signed by the Engineer-in-charge and such alterations shall not invalidate
the contract. Any additional work which the contractor may be directed to do in the
manner above specified as part of the work shall be carried out by the contractor on
same conditions in all respect on which he agreed to do the main works and at the
same rates as are specified in the tender for the main work.
Where, however, the work is to be executed according to the designs, drawings and the
specifications recommended by the contractor and accepted by the competent authority,
the alteration above referred to shall be within the scope of such designs, drawings and
specifications appended to the tender.
22. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE OF RATE OF
THE CORPORATION
If the additional and altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out at the rates
entered in the Schedule of Rates of the Corporation or at the rate mutually agreed upon
between the Executive Engineer and the Contractor, whichever are lower. If the
additional or altered work for which no rate is entered in the Schedule of Rates of the
Division is ordered to be carried out before the rates agreed upon then the contractor
within seven days of date of receipt by him of the order to carry out the work should
inform the Executive Engineer for the rate which it is his intention to charge for such
class of work and if the Executive Engineer does not agree to this rate, he shall be
noticed in writing, be at liberty to cancel his order to carry out such class of work and
arrange to carry it out in such manner as he may consider advisable provided always
that if the rates shall have been determined as lastly herein before mentioned then in
such case he shall only be entitled to be paid in respect of the work carried out or
EW- 372 PUR-F-006 RFQ-
expenditure incurred by him prior to the date of the determination of the rate as
aforesaid according to such rate or rates as shall be fixed by the Executive Engineer in
the event of disputes, the decision of the General Manager of the Corporation will be
23. EXTENSION OF TIME LIMIT IN CONSEQUENCE OF ADDITION OR ALTERATION
The time limit for the work shall be extended in the proportion that the increase in its
cost occasioned by alterations or additions bears to the cost of the original contract work
and the certificate of the Engineer-in-charge as to such proportions shall be conclusive.
24. NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK TO BE
CARRIED OUT
If at any time, after the execution of the contract documents, the Engineer-in-charge
shall, for any reason whatsoever, requires the whole or any part of the work, as
specified in the tender, to be stopped for any period or shall not require the whole or
part of the work to be carried out at all or to be carried out by the contractor, he shall
give notice in writing of the fact to the contractor who shall thereupon suspend or stop
the work totally or partially as the case may be in any such case, except as provided
here under. The contractor shall have no claim to any payment or compensation
whatsoever on account of any loss in profit or advantage which he might have derived
from the execution, of the work in full but which he did not so derive in consequence of
the full amount of work not having been carried out or on account of any loss that he
may be put to on account of materials purchased or agree to be purchased or for
unemployment of labour recruited by him. He shall not also have any claim for
compensation by reason of any alterations having been made in the original
specification, drawings, designs and instructions which may involve any curtailment of
the work as originally contemplated. Where, however, materials have already been
purchased or agreed to be purchased by the contractor before receipt by him of said
notice, the Executive Engineer provided they are not in excess or requirement and are
of approved quality and/or shall be compensated for the loss, if any, that he may put to
in respect of materials agreed to be purchased by him. The amount of such
compensation to be determined by the Executive Engineer, whose decision shall be
final. If the contractor suffers any loss on account of his having to pay, his labour
charges during the period, during which the stoppage of work has been ordered under
this clause the contractor shall on application be entitled to such compensation on
account of labour charges as the Executive Engineer whose decision shall be final, may
consider reasonable provided that the contractor shall not be entitled to any
compensation on account of labour charges if, in the opinion of the Executive Engineer,
the labour could have been employed by the contractor elsewhere for the whole or part
of the period during which the stoppage of the work has been ordered as aforesaid.
25. NO CLAIM FOR COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY IN
SUPPLY OF MATERIALS BY CORPORATION
The contractor shall not be entitled to claim any compensation from Corporation for the
loss suffered by him on account of delay by Corporation in the supply of materials
entered in Schedule A where such delay is caused by:
Difficulties relating to supply of railway wagons.
Force Majeure
Act of God
Any other reasonable cause beyond the control of Corporation, including shortage of
materials to be supplied by the Corporation and difficulties in time by reaching at the site
of any materials equipment.
In the case of such delay in the supply of materials, Corporation shall grant such
extension of time for the completion of the works as shall appear to the Executive
Engineer to be reasonable in accordance with the circumstances of the case. The
decision of the Executive Engineer as to the extension of time shall be accepted as final
by the contractor.
26. TIME LIMIT FOR COMPENSATION CLAIMS
Under no circumstances, whatsoever, shall the contractor be entitled to any
compensation from Corporation on any account unless the contractor has claimed in
writing to the Executive Engineer within one month of the cause thereof.
27. ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK
If at any time, before the security deposit is refunded to the contractor, it shall appear to
the Executive Engineer or his subordinate in charge of the work that any work has been
EW- 372 PUR-F-006 RFQ-
executed with unsound, imperfect or unskillful workmanship or with materials of inferior
quality or that any materials or articles provided by him for the execution of the work are
unsound or of inferior quality to that contract for or are otherwise not in accordance with
the contract, it shall be lawful for Engineer-in-charge to intimate this fact in writing to the
contractor and then notwithstanding the fact that the work, materials, or articles
complained of, may have been inadvertently passed, certified and paid for, the
contractor shall be bound forthwith to rectify or remove and reconstruct the work so
specified in whole or any part, as the case may require or if so required shall remove the
materials or articles so specified and provided other suitable materials or articles at his
own charge and cost, and in the event of his failing to do so within a period to be
specified by the Engineer-in-charge in the written intimation aforesaid the contractor
shall be liable to pay compensation at the rate of one percent on the amount of the
estimate for every day not exceeding ten days during which the failure so continues and
in the event of any such failure as aforesaid, the Engineer-in-charge may rectify or
remove or re-execute the work or remove and replace the materials or articles
complained of, as the case may be, at the risk and expense in all respects of contractor
should the Engineer-in-charge consider that any such inferior work or materials as
described above may be accepted, or made use of, it shall be within his discretion to
accept the same as such reduced rates as he may fix thereof.
Provided that in the case of any work of which visible check is not possible if the
Engineer-in-charge or his subordinate in charge of the work feels that such work has
been executed with unsound, imperfect or unskillful workmanship or with materials of
inferior quality, he shall take sample tests at random, cost of which shall have to be
borne by the contractor and if after taking such test part of such work is found to be
defective in any respect or to have been executed with materials of inferior quality then
the contractor shall pay for the whole work such amount as may be fixed by the office of
the Engineer-in-charge on the basis of the lowest quality of work found by him in such
sample tests.
28. WORK TO BE OPENED TO INSPECTION, CONTRACTOR OR RESPONSIBLE
AGENT TO BE PRESENT.
All works under execution or in pursuance of the contract shall at all times be open to
the inspection and supervision of the Executive Engineer and his subordinate and
contractor shall at all times, during the usual working hours and at all other times at
which reasonable
notice of the intention of the Executive Engineer or his subordinate to visit the works
shall have been given to the contractor, during which period either he should be present
to receive order and instruction, or have a responsible agent duly authorized agent shall
be considered to have the same force and effect as if they had been given to the
contractor himself.
29. NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days’ notice in writing to the Executive
Engineer or his subordinate in charge of the work, before covering up or otherwise
placing beyond the reach of measurement of any work, in order that the same may be
measured and correct dimensions thereof, taken before the same is so covered up or
placed beyond the reach of measurement and shall not be covered up or placed beyond
the reach of measurement and work without the consent in writing of Executive
Engineer or his Subordinate in charge of work. If any work shall be covered up or placed
beyond the reach without such notice having been given or consent obtained, the same
shall be uncovered at the contractor’s expense and in default thereof no payment or
allowance shall be made for such work or for the materials with which the same was
30. CONTRACTOR’S LIABILITIES
The contractor shall supply, at his own cost, all materials (except such special materials,
if any as may be supplied from the Corporation stored in accordance with the contract).
Plant, tools, appliances, implements, ladders, cordage, tackle, scaffolding and any
temporary works which may be required for the proper execution of the work, in the
original, altered or substituted form and whether included in the specification and other
document forming part of the contract or referred to in these conditions or not and which
may be necessary for the purpose of satisfying and complying with the requirements of
the Engineer-in-charge as to any matter on which under these conditions, he is entitled
EW- 372 PUR-F-006 RFQ-
to be satisfied or which he is entitled to require together with carriage thereof to and
from the work. The contractor shall also supply without any charge the requisite number
of persons of setting out works and counting, weighting and assisting in the
measurement of examination at the time and from time to time of the work or materials,
failing this the same may be provided by the Engineer-in-charge at the expenses of the
contractor and the expenses may be deducted from any money due to the contractor
under the contract or from his security deposit or the proceeds of sale thereof or of a
sufficient portion thereof, the contractor shall provide all necessary fencing and light
required to protect the public from accident and shall also be bound to bear expenses of
defense of every suit, action or other legal proceedings of law that may be brought by
any person for injury sustained. Owing to neglecting of the above precautions and to
pay any damage and cost which may be awarded in such suit, action or proceedings to
any such person or which may with the consent of the contractor be paid in comprising
any claim by any such person.
31. CONTRACTOR LIABLE FOR ALL DAMAGE
Compensation for all damage done intentionally or unintentionally by contractor’s
laborer, whether in or beyond the limit of Corporation’s property, shall be estimated by the
Executive Engineer or such other office as he may appoint and the estimates of the
Executive Engineer, subject to the decision of the Superintending Engineer, on appeal,
shall be final and the contractor shall be bound to pay the amount of the assessed
compensation demand, failing which, the same will be recovered from the contractor as
damages or deducted by the Engineer-in-charge from any sums that may be due to or
become due from Corporation to the contractor under this contract or otherwise.
The contactor shall bear the expenses of defending any action or other legal proceeding
that may be brought by any person for injury sustained by him owing to negligence of
precautions for prevent the spread of fire and he shall also pay any damage and cost
that may be awarded by the court, if in consequence
32. RESCISSION OF CONTRACT AND FORFEITURE OF DEPOSIT
The contractor shall not assign or sublet, without the written approval of the Engineer-in-
charge and if the contractor assign, or sublet his contract, or attempt to do so or become
insolvent or commence any proceedings to be adjudicated as insolvent or make any
composition with creditors, attempt to do so, the Engineer-in-charge may, by notice in
writing rescind the contract. Also, if any bribe, gratuity, gift, loan, perquisite, reward or
advantage pecuniary or otherwise shall either directly or indirectly be given, promised or
offered by the contractor or any of his servants, or agents, or any person to the employee
of the Corporation in any way relating to his office or indirectly interested in the contract,
the Executive Engineer may, by ten days’ notice in writing, rescind the contract. In the
event of a contract being rescinded the security deposit of the contractor shall there upon
stand forfeited and be absolutely at the disposal of the Corporation and the same
consequences shall ensure as if the contract has been rescinded under Clause
thereof and in addition the contractor shall not be entitled to recover or be paid for any
work thereof actually performed under the contract.
33. COMPENSATION
All sums payable by a contractor by way of compensation under any of these conditions
shall be considered as a reasonable compensation to be applied to the use of
Corporation without reference to the actual loss or damage sustained and whether any
damage has not been sustained.
34. CHANGE IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In case of tender by partners of a Firm, any change in constitution of firm shall be
forthwith notified by the contractor to the Executive Engineer for his information.
35. WORKS UNDER DIRECTION OF SUPERINTENDING ENGINEER
All works to be executed under the contract shall be executed under the direction and
subject to the approval of Superintending Engineer /Engineer-in-charge for the time being
who shall be entitled to direct at what point or points and in what manner they are to be
commenced and from time to time to be carried on.
36. DECISION OF SUPERINTENDING ENGINEER TO BE FINAL
Except where otherwise specified in contract and subject to the power delegated to him
by Corporation under the Corporation’s rules, then in force, the decision of the
Superintending Engineer/EIC for the time being shall be final, conclusive and binding on
all the specifications, designs, drawings and instructions herein before mentioned and as
to the quality of workmanship or material used on or as to any other question, claim, right
EW- 372 PUR-F-006 RFQ-
matter or thing whatsoever in any way arising out of or relating to the contract, designs,
drawings, specifications, estimates, instructions, orders or these conditions or otherwise
concerning, the works or the execution or failure to execute the same, whether arising
during the progress of the work or after the completion or abandonment thereof.
37. Dispute Resolution Mechanism: For works contracts and composite Contracts, the
arbitration mechanism shall be governed by the Gujarat Public Works Contracts
Disputes Arbitration Tribunal Act, 1992 as per below details.
sub clause 37(1) Amicable Settlement : Any dispute, difference, controversy or claim
between the Parties arising out of or relating to this contract with reference to the
construction, interpretation, breach, termination or validity thereof (hereinafter referred
as "the Dispute") shall, upon the written request of either Party be referred to the
authorized representatives of the Disputing Parties for resolution. The authorized
representatives shall promptly meet and attempt to negotiate in good faith a resolution
of the Dispute within thirty days of the service of the request.
sub clause 37(2) Arbitration : If the Parties fail to amicably resolve the disputes or
differences or contrary claims as indicated herewith in sub clause (1) of Clause
arising under or in connection with the present works contracts, whether pertaining to
works contracts alone or works and procurement both, the same shall be referred to
arbitration under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act,
38. STORES TO BE OBTAINED FROM CORPORATION [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
SCHEDULE A]
The contractor shall obtain from the Corporation stores, such articles as are mentioned
in schedule “A” which may be required for the work or any part of the work or in making
up any articles required therefore or in connection therewith, unless he has obtained
permission in writing from the Executive Engineer or obtained such stores and articles
from elsewhere. The value of such stores and articles as may be supplied to the
contractor by the Engineer-in-charge will be debited to the contractor in his account at
the rate shown in the schedule “A” attached to the contract and if they are not entered in
said Schedule, they shall be debited to him at cost price which for the purpose of this
contract shall include cost of carriage and all other expenses whatsoever which may
have to be incurred in obtaining delivery of the same at the stores aforesaid and further
overhead charges 15%.
The Contractor shall be responsible for the loss, destruction or deterioration of the
materials, stores or articles supplied to him by the Corporation, even if such loss,
destruction or deterioration has occurred under any circumstances whatsoever beyond
his control as if the materials, stores or articles so supplied were his property. The
contractor shall be responsible for returning the residual materials after completion of
the contract and it fails to return, the balance materials supplied to him by the
Corporation, the cost of the residual materials will be recovered from the contractor at
the market rate or stock issue rate whichever be higher at the time of materials account
39. LUMP SUMS IN ESTIMATE
When the estimate on which tender is made, includes lump sums in respect of parts of
the works the contractor shall be entitled to payment in respect of the items of works
involved or the part of the work in question at the same rates as are payable under this
contract or such items or if the part of work in question is not in the opinion of the
Engineer-in-charge capable of measurement the Engineer-in-charge may at his
discretion pay the lump sum amount entered in the estimate and the certificate in writing
of the Engineer shall be final and conclusive against the contractor with regard to any
sum or sums payable to him under the provision of this clause.
40. LUMP SUM TENDERS
Whenever lump sum tenders have been invited for buildings or other structures of the
same type, design, the contractor shall submit his bill stated in Clause No. 18 and the
Engineer-in-charge not below the rank of work, Executive Engineer shall certify by
general measurement or by other method considered suitable to him, the value of work
done and the contractor shall be paid monthly a sum equal to 90% of the total value the
work so certified, since the last payment, after deducting a part or whole of the secured
advance if not already paid for the materials utilized on the works. An additional secured
advance for any fresh materials utilized on the works. An additional secured advance for
EW- 372 PUR-F-006 RFQ-
any fresh materials brought on site will also be paid if certified by the officer not below
the rank of Executive Engineer. After the work is completed final bill would be paid on
the certification of officer not below the rank of Executive Engineer, that the work, is
done according to drawing and specifications attached to the tender. If any additions
and alterations have been carried out, detailed measurement in respect thereof shall be
recorded and extra payment or deductions are regulated as per item rates quoted by the
contractor while submitting the tender and if there are any items in the additions and
alterations for which the contractor has not quoted a rate, the payment shall be as per
Clause 39 above
41. ACTION WHERE NO SPECIFICATION
In the case of any class of work for which there is no such specification as is mentioned,
such work shall be carried out in accordance with the PWD and in the event of there
being no PWD specification, the work shall be carried out in all respects in accordance
with the instructions and requirements of the Engineer-in-charge of the Corporation etc.
42. NO CLAIM FOR VARIATION IN QUANTITIES OR WORK
Quantities shown in the tender are approximate and no claim shall be entertained for
quantities of work actually executed, being either more or less up to any extent than
those entered in the tender or less than those entered in the tender or estimate.
43. NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING WORK
No compensation shall be allowed for any delay caused into starting of work on account
of acquisition of land and in the case of clearance for works or any delay in according
sanction to estimates.
44. NO CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
No compensation shall be allowed for any delays in execution of the work on account of
water standing in borrow pits or compartment. The rates are inclusive for hard or
cracked soil, excavation in mud, sub-soil water or water standing in borrow pits and no
claim for any extra rate shall be entertained unless otherwise expressly specified and
mentioned in the tender.
45. EMPLOYMENT OF TECHNICAL PERSONS:
The contractor shall keep one full time qualified Civil Engineer at the site, who shall be
fully authorized to receive and comply with such instructions, as given by the Executive
Engineer. The contractor shall intimate the name of such Engineer with his qualifications
and experience. The Executive Engineer shall have the right to demand the removal of
any technical personnel, skilled or unskilled workmen, who in his opinion are considered
to cause bad workmanship in the execution of works or to cause indiscipline.
46. Terms and Conditions regarding Labour La w s
During the entire period of the contract, the Contractor and his Sub-Contractors shall at all
times comply with all applicable labour laws, rules, regulations, notifications, and bye-laws
issued by the Central Government, State Government, or Local Authorities. This includes all
existing laws as well as any amendments or new notifications that may come into force
during the contract period.
The Contractor and his Sub-Contractors shall, at all times abide by the following
Acts/Statutes related to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment & Conditions of
Service) Act, 1996;
5. ESI Act, 1948;
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Act, 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen’s Compensation Act, 1923;
11. ID Act, 1947;
12. Maternity Benefit Act, 1961;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions of Service) Act,
14. The Building And Other Construction Workers' Welfare Cess Act,
17. The Carriage by Road Act,
EW- 372 PUR-F-006 RFQ-
The above list is only indicative and not exhaustive. The Contractor shall remain fully
responsible for ensuring compliance with all other applicable labour and welfare
legislations, rules, and regulations in force during the contract.
The following are some of the major responsibilities of the contractor, in addition to other
obligations prescribed under various labour laws, rules, and regulations issued by statutory
authorities such as the State Government or Government of India from time to time, which
the contractor shall strictly comply with during the execution of the contract.
1) The Factories Act,
The contractor should not deploy worker below the age of 18 years and above
60 years for the awarded work.
Earn Leave shall be paid to their bonafide contract workers as per the
provisions of the Factories Act,
Payment of Earned Leave should be made monthly together with wages for better
compliance of law. The contractor shall maintain Earn Leave Register in Form No.
19 as per the provisions of the said Act and submit the same on demand.
All the written registers, Performa etc. shall be maintained up to date and kept
ready for inspection at any time or submitted on-time to the concerned
authorities as per applicability of the Acts by contractor.
2) The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour License under
Contract Labour (Regulation & Abolition) Act from the appropriate
authorities before commencement of work. The contractor shall maintain a valid
labour license under the Contract Labour (Regulation and Abolition) Act for
employing necessary man power to be required by contractor.
The contractor should not be allowed to engage fifty (50) or more contract
labourers without initiating to obtain the labour license under the Contract Labour
Act. (the said number i.e., fifty (50) or more includes Supervisor and other
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through nearest Nationalized Bank compulsory,
preferably situated in the premises of TPS area in case of all works contract. The
Contractor shall supply copy of Bank Statement duly stamped by the Concerned Bank as
well as debited entry of amount displayed in the contractors’ own bank account as token of
proof towards payment of Wages through CLIM/prevailing system at relevant time. Apart
from Payment of wages through Bank, Contractors shall have to make all other payments
like Advances, Bonus, Leave Encashment etc. to their labours through bank only and cash
payment/entry will not be allowed.
Wages rates for contract laborers are applicable as per the terms and conditions of the
license. The contractor shall have to pay wages to workers as notified by the Government
of Gujarat from time to time.
Any default to pay the minimum wages to the engaged workers and deprived of their right
EW- 372 PUR-F-006 RFQ-
to minimum wages payment on or before 7th of each month shall be dealt as per the
provision of labour laws. Recurrence of the same may lead to cancellation of awarded
4) The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of the Firm /
Agency / Company itself for the subject work.
It should be ensured that all the contract labours engaged by contractor are
covered under the provident fund scheme and employee’s pension scheme
and their contribution must be remitted regularly to the concerned R P F C . The
photocopies of challan along with E C R in this regards should be submitted
regularly to the User Department to enable their onward billing clearance.
The contractor shall submit along with his bill (month wise) statement
regarding deductions against employees’ provident fund and family
pension scheme in respect of each concerned employee. Provident fund and
family pension scheme at the rate of 12 % of wages (or at the rates made
applicable by the Government time to time). The contractor’s contribution
and his workers contribution towards provident fund and family pension
scheme shall deposited by the contractor with concerned PF Authorities.
5) W o r k me n’s Compensa tion & E m p l o y e r ’ s L ia b i l it y In su r a n c e.
The contractors shall have to obtain Employee Compensation Policy under
the Employees Compensation Act before starting the work. Employee
Compensation Insurance shall be obtained for all the workers engaged for the
execution of awarded contract. If any of the work is sub-letted, the contractor
shall ensure that the sub-contractor take and provide workmen's compensation
and Employer's liability insurance for the labours engaged. Contractor is liable to
pay compensation in case of accidental injury arising out of and in the course
of employment as per the said Act and shall bear medical expenses due to on
duty accident.
6) The Payment of Gratuity Act,
For better compliance, contractor shall pay amount of gratuity on a monthly basis along
with the payment of wages, calculated on a pro-rata basis per month, which is equivalent
to 15 days’ wages for each completed year of service for every worker. (* applicable
to A R C / B R C works contract only)
7) The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contractor in an accounting year,
bonus, in accordance with the provisions of this Act, For better compliance, the
contractor should pay bonus amount on a monthly basis along with wages
calculated on a pro-rata basis per month. Contractor has to submit the paid bonus
details of its worker in Form No. C as per the provisions of the said Act as and
when required by the Govt. Authority as well as by G S E C L .
8) The Maternity Benefit Act,
Contractor shall ensure that entitled female worker should provide
Maternity Leave and other benefits as per the provision of the said Act.
EW- 372 PUR-F-006 RFQ-
9) The Building and other Construction Workers’ Act,
For any construction work, fall under the definition of Section 2(1)(d),
happening outside / inside the Factory premises the said act will be
applicable and the contractor or its sub-contractor shall be liable to comply with
the provisions framed there under.
10) The contractor shall give preference to existing or local contract workers for
engagement in the awarded contract and shall issue appointment orders to
each and every workers individually at the time of their engagement during the
period of contract and terminate the same at the end of the each contract.
Follow the mentioned procedure at each milestone for the execution of
works contract.
11) On Commencement of Contractual Work
1. Before starting the work, the contractor may contact Labour Welfare
Officer / Industrial Relations Officer for all formalities related to labour law
compliance before commencement of the contract and onward Labour
Law compliance thereof, so that later no dispute will arise in respect of
compliance of labour laws.
2. It is the responsibility of the contractor to ensure that contractor’s
employees maintain strict discipline as regards security, methods of safe
working etc, and not to cause any hindrance to smooth running of power
station or in execution of duties by G S E C L staff. Any lapse in this regard will
be viewed seriously and if lapse found, contract is liable to be terminated. If
any of contractor’s staff is found unsuitable or not behaving properly,
the contractor shall have to remove such worker from the work-site on
demand by EIC. To maintain harmonious industrial relations amongst
contract labours is solely the responsibility of contractor. Any breach of the
same will be viewed seriously.
3. A digital system developed at the request of the agencies working at the
premises of GSECL, is to facilitate them for easy, efficient, effective
management of data, gate passes, attendances, medical records, Police
Verification documents etc related to their employees / workers deployed for
various works and services against work order of GSECL.
4. On receipt of LOA and before commencement of work, authorized
representatives of the agency shall login in the CLIMS online portal /
prevailing system at relevant time and apply for registration of their
employees / workers uploading all information with required documents in
digital form. Upon completion of due verifications, clearance by EIC and HR
departments, contracting agency will obtain gate passes. GSECL will only
consider documents like wage sheet duly accepted and signed by individual
workers, as per the engagement/deployment duration/hours of individual
worker duly certified by the agency, being the employer, for the purpose of
payment of bills and HR clearances.
Agency shall be solely responsible for maintaining accurate and up-to-date
data of their workers in the portal/ prevailing system at relevant time. All
statutory compliances under prevailing laws shall remain the responsibility of
the contracting agency. The agency shall indemnify GSECL against any
liabilities arising from non-compliance of legal provisions or inaccuracies in
EW- 372 PUR-F-006 RFQ-
the data maintained by them in the digital portal of CLIMS/prevailing system
at relevant time.
5. The Contractor who intends to engage labours more than the specified limit
under law, then necessary - Form No. V under the Contract Labour (R& A)
Act, 1970 or Form No. VI under the Interstate Migrant worker (employment
regulation) Act 1979 as applicable is to be obtained for the purpose of
obtaining Labour License from the Licensing Authority.
6. It shall be the duty of the Contractor or his Supervisor to ensure Bio-Metric
punching and reporting at the location of work.
7. The contractor shall employ adequate number of experienced staff at site
for daily supervision and for maintaining of various registers and records
required under the Labour laws and contracts. No payment for such
supervision shall be admissible.
8. The gate passes obtained for any specific work order will be valid for that
specific work order only and contractor should not divert the man power for
any other work order. If any work or part thereof is desired/required
to sublet, the contractor shall obtain the necessary permission of EIC in
black and white well in advance which is mandatory for considering the
statutory documents of agency other than the agency who awarded work
12) During Contractual Work under the progress:
1. All Contractors shall have to make the payment of wages to the Contract
Labours engaged by them, on or before 7th of every month through
Nearest Nationalized Bank compulsory, preferably situated in the
premises of p o w e r s t a t i o n area. The Contractor shall supply
copy of Bank Statement duly stamped by the Concerned Bank as a
token of proof towards payment of Wages through CLIMS / prevailing system at
relevant time.
2. All Contractors has to comply & maintain statutory documents / registers under
the provision of labour laws & E P F Act.
3. In case the contractor having more than one contract in the same T P S , the
contractor shall have to obtain work order wise separate Gate P ass e s
and submit the same with the documents of statutory compliance that too work
order wise every month to the User Department to enable their onward billing
clearance.
(13) CONTRACTOR TO INDEMNIFY THE GSECL REGARDING
LABOUR LAWS
The contractor shall indemnify and keep indemnified the G S E C L , and every
member, officer and employees of the G S E C L , also Engineer-in-charge and his
staff against all actions, proceedings, claims, demands, costs and expenses
whatsoever arising out of or in connection with the matter referred in above clauses
and elsewhere and against all actions, claims demands, cost and expenses which
may be made against the G S E C L by any workman/ employees of contractor or any
sub- contractor and or from any liability any wise to any workman/employees of the
contractor or sub-contractor under any laws, rules or regulation having in force of law
including but not limited to claims against the owner under employee compensation
Act, 1923. The Employee’s Provident Fund Act.1952, and/or the contract labour
(Abolition and Regulation) Act,
EW- 372 PUR-F-006 RFQ-
The G S E C L shall not be liable for or in respect of or in consequence of any accident
or injury to any workmen or other person in the employment of the contractor or his sub-
contractor, and the contractor shall indemnify and keep indemnified the G S E C L
against all such damage and compensation and against all claims, demands
proceedings costs, charges and expenses whatsoever in respect of or in relation thereto.
The contractor shall at his own expense / risk and cost to comply with all the labour laws
as above- m e n t i o n e d and keep the G . S. E.C . L. indemnified in respect thereof.
G S E C L : shall be entitled / empowered to deduct directly from the bills, the amount to be
paid to engaged bonafide contract workers or the contract workers engaged by Sub-
contractor; any sum or sums payable by main contractor / sub-contractor and which
sum/sums the Corporation is required to pay in capacity of Principal Employer on
account of the default
of contractor in respect of all liabilities incurred out of non-compliance regarding any
provisions of Labour Laws and same amount shall be recovered from the pending
dues of the contractor with 15% administrative charges.
Any other rules and regulation, conditions, circulars etc., that are in force at present and
that may be framed by the G S E C L from time to time in connection with contracts will
be binding and acceptable to contractor.
The above are some of the major liabilities of the contractor in addition to other liabilities
prescribed under the various labour laws in force from time to time from Statutory
Authorities like State Government / Government of India, which the contractor shall have
to comply with.
The contractor shall provide the name of authorized representative, as provided to other
statutory Government authorities and will be notified to Engineer In-Charge time to time.
14) Submission of Statutory documents to ensure the compliances:
The contractor shall upload statutory documents, work order-wise, under Labour Laws and EPF
in CLIMS / prevailing system at relevant time.
Required documents shall be u p l o a d e d by the contractor in existing portal /prevailing
system at relevant time invariably each month to Engineer In-Charge for onward process
and smooth clearance by HR Department.
List of docu men ts req u ired f or gat epasse s o f cont ract worker s
throu gh clims /pre va iling syste m
Sr. No. Description of documents attached
Copy of Work Order
2 Copy of P. F. Code No.
Insurance Policy as per subject of work order under the Workmen Compensation
4 Contract agreements/ subletting work contract documents with approval copy
Copy of Id proof of Aadhar card or Election voting card or driving license or Passport
6 Copy of Police Verification in respect of each contract workers
15. The contractor whose work order value is above Rs. 5 lacs shall have to submit
“Declaration cum Indemnity Bond” on Rs. 300/- Non-Judicial stamp paper in prescribed
Performa (Annexure- “B”) with Agreement and Indemnity Bond before the commencement of
the contract.
Annexure- “B”
D E C L A R A T IO N C U M INDEMNIT Y BOND
(On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARAT ION CUM INDEMNITY BOND made at ------------------------- (mention
location) by M/S. ------------------------- having its Reg. office at-------------------------------------
-----------------(hereinafter referred to as “Contractor” which expression shall unless
it be repugnant to the context or meaning thereof, be deemed to mean and include their
respective assigns, successors, executors, subcontractors and / or administrators) of the
ONE P A R T in favour of
M/S Gujarat State Electricity Corporation Limited having its power Station at
… … … … … . . T h e r m a l Power Station (hereinafter referred to as the “Company” ),
which expression shall unless it be repugnant to the context or meaning thereof be
deemed to mean and include its assigns, successors) of the OT H ER PART .
W H E R E A S the COMPANY has entered into a contract with the Contractor for the work of”-
-----------------------------------------------------------‘’ under order No: ------------------------- dated--------
-----------------“hereinafter called the “Contract”);
AND W H E R E A S it is one of the essential conditions of the Contract that the Contractor
shall comply with all the provisions of the Labour & Industrial Laws, as may be
applicable from time to time for the discharge and completion of the works and
completion of the Works and Services covered under said Contract Labour (R & A) Act
1970,Child Labour (Prohibition and Regulation) Act 1986,The Employees Provident
Funds & Miscellaneous Provisions Act,1952,Employees State Insurance Act
Minimum Wages Act,1948,Payment of Bonus Act,1965,Payment of Wages Act,1936,
Employees Compensation Act.1923, Factories Act,1948 and other Labour Laws, Rules,
Notifications and Codes which are at present applicable to the contractor and which may
be applicable during the tenure of the contract (hereinafter referred as the ‘Laws’).
AND W H E R E A S the Contractor has agreed to execute this Declaration cum Indemnity
Bond to this effect and has agreed to indemnify and Company, it’s Directors, Officers and
employees and representatives indemnified and hold harmless against all third party
claims, charges ,penalties, fines, expenses ,losses, damages costs, suits or any other
levy against the Company and/or the management due to the failure of the Contractor
to observe or follow all applicable laws.
NOW T HIS DEED W IT N E S S ET H A S UNDER
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct and lapse,
delays, misdeeds, faults, breaches, inactions etc done by his assigns, successors,
executors, subcontractor and / or administrators shall be construed to be have been
done by the contractor and he alone shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor subject
to the condition of execution of this Declaration cum Indemnity bond, the Contractor
declares and represents to the Company that the Contractor has obtained all
Statutory registrations, Certificates, licenses and approvals required under the
Laws enabling the Contractor to execute the Contract in a legal and lawful
3. That in the event of any liability arising out of non-compliance of any ‘Laws’ of the land by the
Contractor in connection with the Performance of the contract, the Contractor shall bear
all the resultant liability (ies) whatsoever, if any and that the company , its Directors, Officers and
employees, representatives, shall not be liable for any such liability(ies). The Contractor undertakes
to indemnify and keep the Company and its Directors, Officers and employees,
representatives indemnifies, defend and hold harmless, against all losses, costs,
damages, claims, penalties, interest, expenses, demands, fines, legal liability,
causes of action, injury to persons, suits etc., which may be suffered, incurred,
undergone and / sustained by the Company including the C os ts and expenses that
may be incurred in defending any such liability(ies) claim(S), Proceeding (S)
etc. that maybe made or taken or taken or arise on the same by any
Person, body, authority, government, judicial / quasi - judicial authority due to
the failure or non-compliance of any such laws and rules there
under (including any amendments in acts, laws, statutes & rules there under) of
whatsoever kind and nature arising out of or in any way connected with,
whether or not such acts or omissions are actual or alleged, active or passive
with regard to the discharge of the said Contract.
4. The Contractor further declares that in case of any suit / claim / right /
damages / compensation / fine / levy / charges / expenses / losses / penalties /
costs raised by the third party, including contract labours engaged by the
contractor, he shall join such proceedings in such Suit/Court/Tribunal/Authority and
effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss,
damage, claims, suits, demands, decrees, expenses that the Company may
suffer to the fullest satisfaction of the Company and if the Contractor fails to
make good the same then the Company shall have the right to recover the
same from and or any other loss sustained, without any restriction or
limitation, together with any other incidental expenses, costs, and all incidental logistic
expenses etc that may be suffered by the Company from the Contractor and the
Contractor hereby further confirms and declares that this Declaration cum
Indemnity Bond is irrevocable and shall be final and binding on him, his heirs,
executors, administrators, legal representatives, successors, subcontractors and
assigns, wherever the context applies. any claims, demands, shall be adjusted
against any amount due and payable to the Contractor and the Company
shall have the right to withhold any amounts due and payable to the
Contractor, till the settlement of such claims, disputes to the Contractor towards
discharge of such claims, obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the laws of India
and any dispute between the parties with regard to this Declaration cum Indemnity
Bond shall be resolved through the dispute resolution process mentioned in the
General Conditions of the Contract (G CC ) .
IN W I T N E S S W HEREO F, the said Contractor has hereunto set their hand the day and
year first hereinabove written.
SIG NED S E A L E D AND D E L I VE R E D By the within named “CONTRACTOR”
(Authorized Signatory)
Rubber Stamp of Firm/Company
Full Name:
Designation:
In presence of Witness
Name & Address of Witness Signature
1. Full Name :
Residential Address:
Contact No. :
2. Full Name :
Residential Address:
Contact No
On Non-Judicial Stamp Paper of Rs.
To be submitted with NOTORIZED at the time of final bill
UNDERTAKING FOR LABOUR LAW COMPLIANCES
I, Proprietor / Owner / Partner / Authorized Agent of
M/s. do hereby declare and undertake as under
1. That in capacity of independent contractor for M/s.
(Sub-Contractor of M/s. ) worked as
Contractor at GSECL, GTPS Thermal Power Station for the nature of work of
against Work Order
No. Dt. ., I have
complied with the provisions of all laws as applicable. I have paid the wages for the month/s
of my contractual period which is/are not less than the minimum rates as applicable, to all my
employee/s and no other dues are payable to my employee/s.
2. That I have covered all the eligible employee/s under the Employees’ Provident Funds and
Miscellaneous Provisions Act, 1952 and deposited the contributions under my P.F. Code No.
Place: for the month/s of my contractual
period and as such no amount towards contributions whatever is payable.
3. I further declare and undertake that in case any liability pertaining to any of my worker,
labour, employee/s is/are to be discharged by the Principal Employer i.e. Gujarat State
Electricity Corporation Limited, GTPS due to my lapse, I undertake to reimburse the same or
the Principal Employer is authorized to deduct the same from my dues as payable.
4. I further declare and undertake the legal consequences which may arise in future under the
said work awarded, and I bound myself to resolve the same at the risk and cost of M/s.
EW- 372 PUR-F-006 RFQ-
47. MATTERS RELATED TO EXECUTION OF WORK:
a) Work shall commence from the date given in letter to commence the work by EIC at site.
The Contractor shall make all necessary arrangements at site to mobilize labour, operators,
divers and materials and maintain necessary number of machinery and equipment, barge,
pontoons etc., to guarantee the agreed rate of progress of work as per schedule.
b) A detailed work schedule showing how he proposes to carry out the work, specifically
mentioning time periods as well as date of commencement and completion of each activity
and such approved schedules must be strictly adhered to by the CONTRACTOR. After the
owner has agreed with the schedule, the Contractor shall prepare detailed program of each
work front/activity breaking it down giving daily quantifiable/measure of progress. The
schedules are to be reviewed periodically with the OWNER / ENGINEER to ensure that the
completion date will be met or to institute corrective steps (at no extra cost to the
ENGINEER) to adhere to the completion dates. The OWNER reserves the right to revise the
schedule at his discretion in order to keep up to the completion date and to suit the project
requirement and such alterations shall not entitle the CONTRACTOR to any extra payment.
c) A work schedule with PERT / Bar Chart for carrying out the work in prescribed time limit
mentioning date of commencement, activity to be carried with its time period, starting &
finishing event for each activity, completion of total project in critical path etc, shall be jointly
fixed and approved by the GSECL. Such approved schedules must be strictly adhered by the
Contractor.
d) After the GSECL has agreed with the schedule, the Contractor shall prepare detailed
program of each work front / activity breaking it down to daily quantifiable measure of
progress. The schedules are to be reviewed periodically with the Owner / E.I.C to ensure that
the completion date will be met or to institute corrective steps (at no extra cost to the GSECL)
to adhere to the completion dates. The Owner reserves the right to revise the schedule at his
discretion in order to keep up to the completion date and to suit the project requirement and
such alterations shall not entitle the Contractor to any extra payment.
e) The GSECL reserves the right to delete any item of schedule-B for which contractor shall not
have any right to claim on this account.
f) One permanent reference bench mark and a reference base line shall be given for lay out of
work, which shall be maintained without disturbance by the CONTRACTOR during the tenure
of the contract. CONTRACTOR shall establish local bench marks as directed by the
ENGINEER IN CHARGE.
g) The contract or any part thereof shall not be subject to change without the written permission
of the Chief Engineer (Gen.) GSECL, GANDHINAGAR TPS or his authorized
representatives.
h) During the execution of the work if it is found that the work is not progressing as per the
scheduled program approved by the GSECL & planned by the contractor, due to the reasons
attributable to the contractor, suitable action shall be taken as per Clauses in this tender
elsewhere & other relevant clauses appearing in the section of “Terms & condition of tender
& works contract, Legal conditions of works contract” of tender document. And the GSECL
may also take such action as it may deem fit to ensure that the work is completed in time at
Risk and Cost of the contractor.
i) Contractor shall attend meetings at EIC's office at site or any other place as fixed by the EIC,
as and when required for review, discussion, coordination etc. Attending these meetings shall
be obligatory on the part of the Contractor, at no cost to the GSECL.
j) The Contractor shall take all requisite & necessary care to observe that no damage is caused
to the existing, pumps, existing works, service road, or any other structure etc. For any
damage to the existing structures of the GSECL, the Contractor shall be held responsible and
he will have to rectify the damage immediately up to the satisfaction of Engineer in Charge, at
his own cost.
k) The work shall be completed within the period stipulated in the contract. & site clearance
arranged according to the progress of work at site. Therefore, the contractor has to organize
& coordinate the work to suit these circumstantial conditions. In the event of any delay due to
the above or due to any other reason not attributable to the contractor, reasonable extension
in completing the work may be given at the discretion and as decided by the GSECL but no
compensation or idle charges will be payable to the contractor on this account or any site
conditions under any circumstances.
l) No idle charges shall be entertained by GSECL for any site condition or any circumstances.
The corporation will not pay any type of advances including mobilization advance
EW- 372 PUR-F-006 RFQ-
48. RECOVERIES:
a) In case of any damage to equipment / machinery or structure / building of GSECL or any
public property due to negligence of contractor or any other reasons attributed to contractor,
the decision of E.I.C. regarding the amount of recovery shall be final.
b) If the contractor fails to execute the work as per direction of E.I.C. within the time frame
given, the GSECL shall get the work done through any other contractor at the risk and cost of
the contractor and the cost of execution of such work along with 15% overhead charges shall
be deducted from contractor’s monthly bill over and above recovery as per rules.
c) Recoveries due from the contractor, up to the end of the month previous to the one in
which the bill is prepared shall be made from bills approved for payment every month or at
other periods when the bills are prepared, for the various items in the following order of
priorities and extents.
d) Deduction on account of security deposit in full together with shortage, if any, to be made
e) Penalty in full, if levied.
f) Expenditure, if any, incurred by the Corporation on Contractor’s behalf in labour or materials
g) Charges for services such as water and power supply etc. in full.
h) Charge on account of supply of materials like cement and steel in case of shortages found in
balance or excess consumption than specified.
i) Hire charges for Corporation or Government machinery if any.
j) Recoveries of advance and secured payment or payments for preliminary work in full or the
installment due if and as the same as may have been allowed.
k) Rent recovery on account of allotting quarters on rent as per Corporation’s rules.
l) Income tax and sales tax in full as per Government rules.
m) Outstanding recoveries in respect of other contracts awarded by the Corporation if any.
n) Other recoveries. (If any)
49. WORK TO BE EXECUTED TO THE SATISFACTION OF THE ENGINEER -IN-CHARGE:
The contractor shall proceed with the work with diligence and expedition and the whole
of the work herein specified as well as the mode of execution shall be under the
supervision and direction and shall be carried on to the entire satisfaction of the Engineer-
in-charge, who shall have full power to order the contractor to alter, enlarge or diminish
the form, dimensions, positions, or quantities of any of the work or to make use of material
and workman-ship of different descriptions and qualities from this herein specified.
The whole of the works, together with any temporary works, associated therewith, shall be
carried on in the most substantial proper and mannered workman like manner, with the best
materials and workmanship and to the entire satisfaction of the Engineer-in-charge and in
such order of time as he may direct. The contractor shall attend to and execute without delay
all orders and instruction which may from time to time be issued by the Engineer-in-charge.
50. MATERIALS WORKMANSHIP etc.:
The work shall be executed in thoroughly substantial manner with material and workmanship
of best quality and strictly in accordance with the specifications and with the drawings, or
with such other drawings or written instruction as may from time to time be furnished to the
contractor, in accordance with terms of this contract and shall be completed in every respect
with all materials and workmanship implied and necessary according to the fair interpretation
and meaning of the same and should there be any discrepancy between the drawings and
specifications or any difference or disputes as to the dimensions to be worked to or the
quality of the materials to be used, or the mode of doing periodical quantity of the work to be
executed or with respect to any subject arising out of this contract, the decision of the
Engineer-in-charge shall be final and binding on all parties. Rejected material shall be so
disposed off as to obviate any possibility of their use on works. The place, method and period
of disposal shall be as directed by the Engineer-in-charge.
51. SAMPLES OF DESCRIPTIVE DATE:
Samples of descriptive date, requiring approval, shall be submitted by contractor to the
Engineer-in-charge in good time before the use of such material for inspection and
permission of testing if required. The samples shall be properly marked to show the name
of the material, manufacture, place of origin, and place where to be used etc. Failure of
any sample to pass specified tests will be sufficient cause for the refusal to consider any
further sample from the same source.
52. FENCING AND LIGHTING AND VENTILATION
Except as herein after provided, the contractor shall unless otherwise specified, be
responsible for the proper fencing, guarding, lighting and taking of the necessary safety
EW- 372 PUR-F-006 RFQ-
measures for all works comprised in the contract and or the proper provision of temporary
roadway, footways, guards fences, caution notices etc. as far as the same may be
rendered necessary by reasons for the work for the accommodation and protection of
workman foot passenger or other traffic and of the owners and occupiers of adjacent
property and of the public and shall remain responsible for any accidents that may
occur on account of his failure to take proper and timely precautions.
All the arrangements made for fencing, lighting and ventilation shall be maintained by the
contractor throughout the tendency of the contract till physical taking over of the work by
the department.
53. LIABILITY FOR DAMAGE TO WORKS OR PLANTS
The contractor shall during, the progress of the work, properly cover up and protect the
work, and plant, and materials placed at his disposal or acquired for him by the
Corporation, from injury by exposure to the weather, or any cause what so ever and shall
take every reasonable proper timely and useful precaution against accident or injury to the
same from any cause and shall be and remain answerable and liable for all accidents, or
injuries thereto which until the same be or be deemed to be, taken over by the Corporation,
may arise or be occasioned by the acts or omissions of the contractor or his workmen of
sub-contractors, and all losses and damages to the works or such plant or material arising
from such accidents or injuries as aforesaid shall be made good in the most complete and
substantial manner by and at the sole cost of the contractor and to the reasonable satisfaction
of the Engineer-in-charge. If the contractor fails to make good such losses & damages
within the time given by the Engineer-in-charge, the Corporation shall be at liberty to recover
the amount fixed by the Engineer-in-charge for such losses or damages or any part thereof by
deducting it from any sum due by the Corporation to the contractor under this contract or
otherwise.
Further the contractor shall, at all time, protect and preserve all materials, plant and equipment
that he may himself have procured for the execution of the work. All reasonable requests of the
Engineer-in-charge to enclose or especially protect any of the above shall be expeditiously
compiled with.
If the Engineer-in-charge considers that the work or materials or plant is not sufficiently
protected by the contractor, he shall be entitled to arrange for such protection at his
unfettered discretion and recover the cost thereof from the contractor.
Until the work shall be or be deemed to be taken, over as aforesaid, the contractor shall also
be liable for and shall be deemed to have indemnified the Corporation in respect of all damage
or injury to any person or any property of the Corporation or of others, occasioned by the
negligence of the contractor or his workmen, or his sub-contractor, or by defective design,
work or materials.
54. EXPLOSIVE PROCUREMENT AND STORAGE (IF APPLICABLE)
i) Explosives, petrol, oils, fuels and other inflammable materials shall be stored strictly in
accordance with the rule of the Explosive Department.
ii) The contractor shall at his own expense construct and maintain, proper magazines which are
required for the storage of explosive and arrange for proper storage facilities for oils, fuels etc.
for use in connection with the work.
iii) The contractor shall at his own expense obtain such license or licenses as may be necessary
for strong and using explosives, oils, fuels etc. The department shall not take any responsibility
whatsoever in connection with the storage or use of explosives on the site, or any accident or
occurrence whatsoever in connection therewith. All operation of the contractor in which or for
which Explosives are employed shall be at risk of contractor and upon his own responsibility.
55. MATERIALS TOOLS AND PLANT BROUGHT ON THE SITE OF WORK
All materials, tools and tackle of the contractor brought to and delivered upon the site for the
purpose of the work shall from the time of their being so brought shall be deemed to be the
property of the Corporation in its possession to be used for the purpose of the work and for
that purpose only and shall not on any account be removed or taken away by the contractor
or any other person without the written permission of the Engineer-in-charge but the
contractor shall nevertheless be solely liable and responsible for and loss destruction
thereof or damage thereto. The Corporation shall have a lien on such materials, tools and
tackle for any sum of sums which may at any time prior to the completion of the works be
due or owing to the Corporation by the contractor, under in respect of and dispose of any
such materials, tools and tackle in such manner as the Corporation may think fit and to apply
the proceeding in or towards the satisfaction of such sum or sums so due or owing as
aforesaid but subject to such lien and power of sale and disposal such surplus materials,
EW- 372 PUR-F-006 RFQ-
tools and tackle shall belong to the contractor and may be removed and disposed off by him
as he may think fit.
56. ACCESS TO SITE AND WORK ON SITE
The Engineer-in-charge or his authorized representative may if he consider fit from time to
time enter upon any lands which may be in the possession of the contractor under this
contract, for the purpose of executing any work not included in this contract and may
execute such work not included in this contract by agents, or by other contractors at his
option and the contractor shall in accordance with the requirements of the Engineer-in-
charge, afford all reasonable facilities for execution of the works including occupation of
lands by structure or otherwise for any other contractor employed by the Corporation and
his workmen or for the workmen of the Corporation who may be employed in the execution
on or near the site of the work not included in the contractor’s any contract in connection
with or ancillary to the works and in default, the contractor shall be liable to the Corporation
for any delay or expense incurred by reason of such default. Provided always that if the
exercise of those power shall cause any damage to the contractor he may within fifteen days
of such damage arising make a statement of the same to the Engineer-in-charge who shall
from time to time assess the value in his Judgment of such damage and the Corporation
shall from time to time shall pay to the contractor the amounts (if any accepted as justified)
by the Engineer-in-charge. The contractor shall not however, on account of any such
modified, new or extra work executed by or for the same of the Corporation be entitled to
claim relief from the obligation to execute other works.
57. INSPECTION OF WORKS
The Engineer-in-charge or his duly authorized agent shall have at all time full power to
inspect the works, wherever in progress, either on the site, on the contractor's premises or
at the premises wherever situated, of any firm or Corporation where work in connection with
this contract may be in hand.
Further, the contractor shall not allow, without written authorization permit entry on site of
work, any person except authorized agents of the Corporation of the Engineer-in-charge or
the contractor's staff and labour directly engaged on and in connection with the work.
The contractor shall, during working hours, maintain supervisors having sufficient training
and experience to supervise the various items and operations of the work and the said
supervisors shall remain present during the inspections of the Engineer-in-charge. All orders
and directions given to such supervisors or other staff of the contractor shall be deemed to
have been given to contractor. Further the Engineer-in-charge may be due notice, desire a
higher ranking members of the supervisory staff of the contractor to be present on any
specified inspection and the contractor shall comply with such direction.
58. CLEANING UP
The contractor shall at all times keep the construction area and his power house and storage
areas free from accumulation of waste, or rejected materials.
Prior to the completion of the work the contractor shall remove all rubbish from and about the
premises, and all tools, scaffolding, equipment and materials which are not part of permanent
structure. The premise will be left in a manner fully satisfactory to the Engineer-in-charge,
thereafter only the completion certificate will be issued.
59. CONTRACTOR TO KEEP INVENTORY OF MATERIALS etc.
The contractor shall prepare and maintain an inventory of all materials temporary rolling
stock, plant purchased or hired for use of employment or for any of the purposed for this
contract and such inventory or a copy thereof shall at all times be available for inspection by
the Engineer-in-charge. A complete and up to date copy of the inventory shall be submitted
to the Engineer-in-charge in the beginning and once a year; thereafter changes in the interim
period, if any shall be communicated on every three months.
60. CONTRACTOR TO RESTORE PLANT
Upon completion of the work, the contractor shall deliver to the Corporation, all appliances,
materials, and plants which may have been loaned or hired to him by the Corporation and
make good all damages which may have occurred to them, except such as shall be caused
by fair wear and tear in execution of the works.
61. PROGRESS SCHEDULE
i) The contractor shall furnish, within one week unless extended by the Engineer of the order to
start the work, a progress schedule in quadruplicate indicating the date of start the weekly
progress expected to be achieved and the anticipated completion date of each major items of
work to be done by him, also indicating dates of procurement and setting up of materials,
plant and machinery. The schedule should be such as is practicable of achievement towards
completion of the whole work in the time limit and of the particular items on due dates
EW- 372 PUR-F-006 RFQ-
specified in the contract and shall have the approval of the Engineer. Further, the dates for
the progress as in this schedule shall be kept up-to-date. In case it is subsequently found
necessary to alter this schedule, the contractor shall submit in good time a revised schedule
incorporating necessary modifications proposed and get the same approved by the Engineer.
No revised schedule shall be operative within such acceptance in writing.
Detailed schedules for each week showing the progress proposed to achieve shall be
submitted to the Engineer and got approved. The Engineer is further empowered to ask for
more detailed schedule or schedules any week by week, for any items or items, and the
contractor shall supply the same as and when asked for.
ii) The Engineer shall have, at all times the right without in any way vitiating this contract, or
forming grounds for any claim to alter the order of the works or any part thereof and the
contractor shall after receiving such direction proceed in the order directed. The contractors
shall also revise the progress schedule accordingly and submit four copies of the revised
schedule to the Engineer within seven days of the Engineer's direction to alter the order of
iii)The contractor shall furnish sufficient plant equipment and labour and shall work such hours
and shifts as may be necessary to maintain the progress on the work as per the approved
progress schedule. The working and shift hours shall comply with all GSECL's regulations in
force and shall be such as may be approved by the Engineer. They shall not be varied
without the prior approval of the Engineer.
iv)The contractor shall from time to time as may be required by the Engineer, furnish the
Engineer, with a statement in writing of the arrangement he proposes to adopt for the
execution of this contract and the Engineer may if he considers, necessary at any time advise
alteration in the same, which the contractor shall adopt on notice thereof.
v) The progress schedules shall be in the form of progress charts, forms, statement and/or
reports as may be approved by the Engineer. Further, the contractor shall submit four copies
showing the progress of work in forms and charts etc. at periodicals intervals as may be
specified by the Engineer.
62. DATE OF COMPLETION
The contractor shall supply, erect, equip and construct the whole of the works and hand
over them to the Corporation on or before the date specified in the tender document
including "Special Conditions" and save as herein provided, in no circumstances whatever
shall extend or alter the date for the completion of works. Provided always that if in the
opinion of the Engineer-in-charge the completion of the works shall be delayed by any
change of original design or by the order of the Engineer-in-charge, of any altered,
modified substituted or additional works or materials omitted or by strikes, lock outs or
stoppages of labour, or revolution, riots, civil or political disturbance or by causes directly
due to war or by the contractor not being given possession of the site or any part there-of or
by the Corporation taking possession of and using the site or any part thereof or the works
or any part thereof, whether any nonperformance of work under the powers herein
contained or otherwise or by any nonperformance of work or non-supply of materials to be
performed or supplied by the Corporation or by the contractor not receiving any orders,
drawings, instructions or directions in time or by the suspensions of the works or by fire,
flood exceptionally bad weather tempest, storm, or by from unforeseen circumstances
(and whether the same shall be due to any act or omission of the Corporation or its agents
or those in their respective service or not) the Engineer-in-charge may, if in his unfettered
discretion, he thinks fit either forthwith or at any later time and from time to time not
withstanding that the prescribed or extended time for completion has expired or that the
work have been completed, by writing under his hand, extend the time for the completion
of the works to such date as he shall appoint. Provided always that unless the contractor
makes a written application to the Engineer-in-charge within one month of the cause of
delay and unless the time is extended by the Engineer-in-charge, the prescribed time shall
not be extended notwithstanding delays from the aforesaid foregoing or any other causes
of whatsoever kind.
63. SUBLETTING OF CONTRACT
There will be generally no objection on the component parts for the work, being given over
to responsible sub-contractors but Corporation shall under no circumstances
recognize these sub-contractors and the responsibility of executing the work in the
accordance with the conditions of contract will entirely rest on the main contracts. The
main contractors will therefore always have the very responsible member, preferably a
technical hand present on the works with power to sign all work orders issued on the site of
work and to take requisite actions in the interest of very efficient execution of work.
EW- 372 PUR-F-006 RFQ-
However, the subletting of the contract can be made only with the prior approval of the
competent authority of the Corporation.
64. OTHERCONTRACTS FOR THE WORK SUSPENSION STOPPAGEOR CURTAILMENTS
If during the tendency of the contract the Engineer-in-charge shall for any reasons (which
shall be unquestioned) whatsoever require the whole or any part of the work as specified
in the contract to be suspended for any period or shall not require the whole or any part
of the work as specified in the contract to be carried out at all by the contractor, he shall
give notice in writing of the fact to the contractor who shall thereupon suspend or stop the
work totally or partially as the case may be. In any, case, except as provided hereunder,
the contractor shall have no claim to any payment or compensation whatsoever on account
of any profit or advantage which he might have derived from the execution of the work in full
but which he did not so derive in consequence of the full amount of the work not having
being carried out, or on account of any loss that he may be put to on account of materials
purchased or agreed to be purchased or for unemployment of labour recruited by him. He
shall not also have any claim for compensation by reason of any alterations having been
made in the original specifications, drawings, designs and instruction which may involve any
curtailment of the work as originally contemplated. Where, however, materials have
already been purchased or agreed to be purchased by the contractor, before receipt by
him of the aforesaid notice, the contractor shall be paid for such materials at the rate
determined by the Engineer-in-charge, provided they would have been useful for the work
curtailed or stopped are not in excess of requirements, are of approved quality and
cannot be used on other contract works or otherwise by the contractor and/or shall be
compensated for the loss if any, that he may be put to, in respect of materials agreed to be
purchased by him, the amount of such compensation to be determined by the Engineer-in-
charge, whose decision shall be final.
The Engineer-in-charge may grant extension of time for the execution of any item or items of
work affected by such suspension of work. The decision for the Engineer-in-charge,
regarding the granting of extension and the period thereof shall be final. The Engineer-in-
charge may order the contractor to suspend any work on account of bad weather; rain or
storm and such other adverse climate conditions and the contractor shall comply with the
The contractor shall not be entitled to an compensation for such suspension of work,
concrete lining at the junctions of the different works under different contract shall be done
with particular care regarding forms, construction joints, interconnecting reinforcement
etc. If any and the joint planning of such work shall be with prior approval of the Engineer-
in-charge.
65. OTHER CONTRACTORS
Apart from this work, the other works connected with the power house will be simultaneous
going on either departmentally or through agencies inside or outside the power house. Each
contractor or agency shall co-operate with others to the fullest extent and shall allow to
each other every facility and co-ordination for execution of their works simultaneously
and satisfactorily, during their action of machinery or execution of any other co-ordination
works of the power house, the contractor will have to work only at places as directed by
the Engineer-in-charge. He will have some time to suspend his work partially or totally in the
interest of the work at large.
In such cases and at such time, he will be informed from time to time and directed by the
Engineer-in-charge where to work. He may also be required to remove the scaffolding or to
erect the scaffolding and shuttering in such a manner as to be of little obstruction and
inconvenience for erection of machinery. In such cases he shall not be given any
compensation on account of reduction or stoppage or labour force or removal and
reinstatement of scaffolding shuttering etc. It will be seen that contractor is not put to
unnecessary inconvenience.
In the matter of dumps, haul, roads, drainage, diversion and the like, each contractor shall
take into consideration the needs and requirements of the other constructors, if any working
in the vicinity. Further no contractor shall take or cause to be taken any stops or action
that may cause disruption, discontent or disturbance to the work, labour of arrangements
etc. or other contractors in the neighboring project localities.
Any action, by any contractor, which the Engineer-in-charge in his unquestioned discretion
may consider as infringement of the above code, would be considered as a breach of the
EW- 372 PUR-F-006 RFQ-
contract conditions and the Engineer-in-charge may take such action as he may deem fit
against the contractor and the action taken shall be considered as final and binding.
66. SPEED OF WORK
The contractor shall at all times maintain the speed of work to confirm to the latest operative
progress schedule but the Engineer-in-charge may at any time with sufficient notice in
writing direct the contractor to slow down any part or the whole of the work for any reason
(which shall not be question whatsoever, and the contractor shall comply with such orders of
the Engineer-in-charge. The compliance of such orders shall not entitle the contractor to
any claim or compensation.
67. CONTRACT DOCUMENT AND MATTERS TO BE TREATED AS CONFIDENTIAL
All documents, correspondence, decisions and other matter concerning the contract shall be
considered as of confident and restricted nature by the contractor and he shall not divulge or
allow access there to any unauthorized persons of any kind.
68. ACCESS TO THE CONTRACTOR'S BOOK
Whenever it is considered necessary by the Engineer-in-charge to ascertain the actual cost
for execution of any particular item of work of supply of plant or material shall direct the
contractor to produce the relevant documents such as pay rolls records of personnel,
invoices of materials and any other data relevant to the item or necessary to determine its
cost etc. and the contractor to the aforesaid items in the mode and manner that may be
specified.
69. INTEREST ON MONEY DUE TO THE CONTRACTOR
The contractors shall not be entitled to get interest on any amount either of their bills or
arrears whatsoever because of delay in payment by the Corporation. Similarly they shall not
be entitled for any interest on amount of bank guarantees given by them. Non-payment of
interest by the Corporation therefore, shall not cause breach of contract.
70. MEASUREMENTS TO BE PROVISIONAL AND SUBJECT TO CORRECTION
Every measurements for running payment on account of work, done or supplies made, shall
be subject to adjustment or final measurements. In case of disagreement between such
intermediate and final measurements, the latter shall prevail. All works shall be measured,
met by standard measure and according to rules and custom and usual in the use in Gujarat
State Electricity Corporation Ltd., and no proposal to adopt alternative method will be
accepted, the Executive Engineer’s decision as to what is “the usual method in use in the
Gujarat State Electricity Corporation Ltd.” shall be final.
71. BREACH ON PART OF CORPORATION NOT TO ANNUAL CONTRACT
No breach or non-observance on the part of the Corporation of any of the agreements
contained herein, shall annul this contract or discharge the contractor from the observance
and performance thereof, or of any part thereof, but on application by the contractor and
in the unfettered discretion of the Engineer-in-charge an extension of time may be given
to the contractor in respect of such breach or non-observance by the Corporation.
72. PROFORMA RETURNS
The contractor shall maintain Performa, charts and details regarding machinery equipment
materials, labour personnel and other matters as may be specified by the Engineer-in-
charge. He shall further, submit returns of Performa and details as may be specified by
the Engineer-in-charge from time to time.
73. LOCAL LAWS
All local laws in force at the time of entering into the contract and those enacted thereafter
shall be binding on the contractor and he shall abide by the same.
All import duties, sales tax and other local taxes shall be borne by the contractor and they
shall be deemed to have been covered by this quoted tender rate
74. WORKS IN SHIFT DUTY
Works shall be planned in shift duties, if possible in three shifts, depending on emergency of
the work with prior approval of Eng. - in- charge. 0n Sunday or any other holidays work shall
EW- 372 PUR-F-006 RFQ-
be continued in order to maintain progress with prior permission of Eng.-in -charge. Such
works shall not form any grounds for complaint, compensation or extension of time limit.
If on the other hand, the Engineer-in-charge directs that the work shall be proceeded with
on days and during hours which are not permissible under this contract, the contractor
shall proceed with the work as directed without in any way vitiating this contract or
forming any grounds for compensation of claim.
The contractor shall in his dealing with labour, at all times, during the period of this contract,
have due regard to local festivals and religious and other customs.
A working day shall consist of two shifts each of eight hours, a working day shall constitute
any day on which in the opinion of the Engineer-in-charge, work can be carried out in one or
more shifts.
Final payment to the contractor shall not be made until the contractor shall deliver to the
purchaser or receipts in full in lieu thereof, and in either case, an affidavit that so far he has
knowledge or information the releases and receipts include all the labour and material for
which in lien could be filed. If any lien remains unsatisfied after all payments are made, the
contractor shall refund to the purchaser all moneys that the latter may be compelled to pay in
discharging such a lien, including all costs and a reasonable attorney's.
76. MISCELLANEOUS:
1. In case of conflict / discrepancies among clauses of different specifications given in this
document, the stringent specification shall be followed and under such circumstances, the
decision of the EIC shall be final and binding to the Contractor
2. The Notice inviting tender, general instruction to bidders and all other documents of this tender
shall form part of the contract
3. No receipt for any payment alleged to have been made by a Contractor in regard to any
matter relating to tender of the contract shall be valid and binding on the Corporation unless
it is signed by the Engineer-in-Charge.
4. As per provisions of Income Tax Act, Corporation shall deduct Income Tax at the applicable
5. Agency has to note that the extension of Time limit/excess saving in the works if required to
approve, than it shall be processed as per the provision of DoP and will take time for
process the same.
6. The contract is inclusive of the cost of materials required to complete the work in totality.
7. It will be absolutely incumbent on the contractors to have on the site of work only such of the
materials as have been duly passed by the Engineer-in-charge. Materials that have been
rejected must on no account be allowed to remain on the site, and in spite of written order to
do so, any such rejected materials is on the site beyond a period of 48 hours’ notice, the
Engineer-in-charge shall have the right to remove it, at the risk and cost of the contractors
and even to destroy it.
8. It must be distinctly understood that conditions of contract and of claims in respect of extra
work, will not be allowed unless the works to which they relate is clearly without the spirit
and meaning of the specifications or unless such works are ordered in writing by the
Engineer-in-charge and claimed for in specified manner.
9. Contractor will be asked to present the sample of materials, and the approved samples will
be preserved at the site of work, and no change in the approved sample will be allowed,
without the written permission of the Engineer-in-charge.
10. The department reserves the right to make any change in the design and the plans of the
works. The contractor shall be bound to carry them out at the rates tendered. No claim or
compensation will be allowed on this account.
11. The contractor shall keep instruction book on site, for taking site instructions from time to
time. This book shall be made available on site whenever asked for.
12. Above construction equipment brought to site shall be allowed to be taken out only after the
work for which it has been brought is over. The equipment shall be taken out only with the
specific permission in writing from the E.I.C. Only the equipment required for the work and in
fit condition shall be brought to the site. The Contractor shall ensure that proper
documentation is followed at entry gate of GSECL's premises for such items which shall be
carried back by Contractor after completion of work.
13. The Contractor shall provide all temporary ladders, scaffolding materials, platforms, supports
and other necessary facilities required for trimming & cutting of trees. The Contractor shall
provide sufficient, strong and safe staging so as to ensure safety of the laborers.
14. The Contractor shall provide sufficient fencing, notice Corporations and lights to protect and
warn others as may be considered necessary by the GSECL and safety authority.
EW- 372 PUR-F-006 RFQ-
15. The GSECL may during the progress of work, order the removal of part or whole of the work
executed, found not in accordance with the approved drawings, specifications/ instructions.
No extra claims shall be entertained for re-executing or altering of such work.
16. On completion of the work, the site shall be left in good order and the excess materials,
scraps, debris, if any shall be removed and dumped by the Contractor at place/places as
designated by the GSECL. The Contractor shall also dismantle and remove the staging and
other temporary facilities like stores, offices, labor camp etc. on completion of work.
17. Contractor is required to maintain proper records at site of work in addition to normal routine
requirement of own office. The records to be maintained shall include but not limited to the
following:
(a) Daily Progress Record.
(b) Work Site Order Book.
(c) Instruction by GSECL's Officers.
(d) Test Registers of other materials/fittings, fixtures, equipment as stipulated in the
(e) Register for Working Details.
(f) Log Book of Defects.
(g) Hindrance Register giving details of commencement and removal of each hindrance.
(h) Supply and consumption registers of all materials shall be maintained.
(i) Day to day Record of used/received materials shall be entered in the register and
signed by the Site Engineer of the GSECL as well as contractors' representative at
(j) Measurement Book.
77. SALES TAX ON WORK CONTRACT
The Gujarat Government by its amendment to the Gujarat sales tax act has also
made works contract subject to Sales Tax. However works contract tax shall be
liability of the contractor and shall be born by the contractor. More ever you shall also
have to submit form No 702 as prescribed by Gujarat Sales Tax act while submitting
More ever the purchaser will not pay any composite tax/turnover tax/works contract
tax which contractor has to pay as per act. Hence the incidence of sales tax or such
type of taxes shall not be payable by the purchaser in any case even if such taxes are
levied on the party/contractor at a future date.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 372 PUR-F-006 RFQ-
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES
LIST OF SAFETY TOOLS
EW- 372 PUR-F-006 RFQ-
TENDER & CONTRACT FOR WORKS
I/We hereby tender for the Gujarat State Electricity Corporation Ltd. (herein Referred as “Corporation”)
of the work specified in the underwritten memorandum within the time specified in Schedule B
(memorandum showing items of work to be carried out) and in accordance, in all respect, with the
specifications, design, drawings and instructions in writing and as per annexed conditions of contract
and agree that when the materials for works are provided by the Corporation, such materials and rates
to be paid for them shall be as provided in Schedule A hereto.
MEMORANDUM
(a) General description of work : Providing and fixing Additional partition and other misc. work at
Administrative office GTPS.”
(b) Estimated cost : Rs. 4,95,808.69/-
(c) Earnest money (3%) : Rs. 14,874.26/-
(d) Security deposit (5%) : As per cl no.7 of Section C (i.e General condition of contract).
(e) Time allowed for the completion of work from date of written order to commence.: 02 Months.
Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms and provision of
the conditions of contract annexed hereto as applicable and in default thereof forfeit and pay to the
Corporation, the sums of money mentioned in the said conditions.
Receipt No. Date from the Gujarat State Electricity Corporation Ltd. in respect of the sum of
Rs____________________________________. (The amount to be specified in figures and
words) is herewith forwarded representing the earnest money (the full value of which is to be
absolutely forfeited to the Corporation, should I/We not deposit the full amount of security deposit
specified in above memorandum in accordance with clause (d). Security Deposit of the said
conditions/otherwise the said sum of Rs…………………. shall be refunded on surrendering the original
receipt, in case of non-awardance of contract.
Signature of the Contractor:
Address of the Contractor:
Dated__________________ day of _______________year
Signature of Witness:
Address of the Witness:
Occupation:
Dated__________________ day of _______________year
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity Corporation Ltd.
For & On behalf of GSECL
Chief Engineer (Gen)
GSECL GANDHINAGAR TPS
his duly authorized Assistant
EW- 372 PUR-F-006 RFQ-
General Safety Rules & List of Safety Tools.
“GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTORS
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety Rules.
Concern principle contractors are responsible for informing & observance of these rules by their
supervisors/contract workers as well as the owner/supervisors/ workers of sub-Contractors engaged, if any, by
them for the work contract awarded to them. Prior to commencement of the work, Contractor shall have to
submit a written assurance on their letterhead to the concerned Sectional Head / Engineer-in-charge that they
have thoroughly gone through these Rules, have educated their employees / workers of their sub contractor
and will strictly observe the said Rules while execution of work under work contract awarded to them. They will
have to indemnify the company for any loss or damage / accident / injury to the company’s property / employee
or employee of their own in default of non - observing these rules.
(01) Contractor s houl d i s s ue p hoto gate pas s for t hei r workers f rom GSE CL Fa ctory Ma nager
as per Gujarat Factori es rul es , 1963 & detai l s s hal l be fi l l ed up i n GSE CL gate pas s
format as per Aadhar card /E l ecti on card i d proof & to fol l ow the gate pas s i ss ue
procedur e through concern department EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical
Officer, Safety Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for three days
with prior permission of Factory Manager only. More than three days, Permanent photo gate pass
procedure shall be completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of Gujarat Factories
rules, 1963 shall be issued by GSECL Factory Medical Officer for all contractor workers before
commencement of work & examination responsibility shall be taken by contractor as well as concerned
Head of Department .Pre-employment & Periodical medical examination of contractor workers shall be
carried out in form no.32 from GSECL Factory Medical Officer after every six (06) months of contractor
with their contractor workers. Contractor shall be fulfilled all health requirements before commencement of
work. After completion of medical examination in form no.32/33, GSECL Factory Medical Officer shall be
signed in contract worker gate pass procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D animation movie & Training
record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the issue PPE to
contract workers as per nature of job, Form no.10 of lifting tools and tackles, Driving license, Electrical
contractor license, Electrical trade qualifications, Safety induction training, SOP, supervisor qualifications
etc. After fulfillment of all Safety compliances, Safety Officer/Dy. Safety Officer shall be signed in Contract
worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is awarded the work order.
Subletting of contract shall be allowed only if prior approval of Power station chief before execution of
work. Contractor/agency shall be submitted the entire subletting contract documents with gate pass
application through concern department EE & SE, LWO/DGM, Safety Officer/Dy.Safety Officer & Factory
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules, 1956, Valid
Electrical contractor License shall be submitted to concern electrical department EE/SE/Electrical Safety
Officer/ Safety Officer/Factory Manager at the time of apply gate pass by agency/party with latest renewal
from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical License photocopy shall be checked by
Concerned HOD of Electrical Department/Electrical Safety Officer/Dy.Safety Officer/ Safety Officer/Factory
(08) As per natu re of job/work, qualified supervisor (Diploma (Electrical/ Mechanical/Civil/C&I) + 3 years
experiences or ITI + 10 years) shall be engaged by contract agency & qualification certificate with
experience certificate shall be submitted to concern EE/SE/LWO/IRO/DGM/ Dy.Safety Officer /Safety
Officer/Factory Manager at the time of apply gate pass.
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out the work on
electrical lines and Apparatus, Contract person/worker possesses a certificate of competency or
electrical work permit, issued by the Appropriate Government. That means, Electrical trade Qualification of
contract worker/person like ITI-wireman/ Electrician, Diploma (Elect), BE/B. TECH (Elect), ME/ M. TECH
(Elect) shall be submitted to concern EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety Officer/Factory
Manager at the time of apply for photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7 round the
clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor (BE/Diploma
(Elect/Mech/Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged by contractor during
dangerous operations/dangerous works as well as day to day dangerous activities, safety supervision, tool
box talk, Safety awareness programme, SOP preparation with hazards & its control measures with each
EW- 372 PUR-F-006 RFQ-
step , checking of lifting tools & tackles, hydra mobile crane, Safety precautions, coordination with Safety
Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of vehicles & to follow
the Motor vehicle Act,1988, the Central Motor Vehicles (Amendment) Rules,2016 as well as Gujarat Motor
Vehicles rules,1989 & driver license shall be checked every day by security shift in charge before entry in
the Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person as per GFR,
1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences. SOP will review & approve by
concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety Officer/Factory Manager before
execution of work.
(13) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide standard
make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue format by concern
JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective Equipments / Safety Gadgets suitable to
give sufficient protection against hazards involved in their work / job to their staff, as per the job
requirement and insist / enforce their workers to put on the same while at works.
The ongoing work is liable to be stopped at any time if your contract workers/staffs found working without
P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI approved only) to be used for
various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety Shoes, Safety Helmet,
Safety goggles, Mask & Reusable Ear plug to their workers/supervisor compulsory & it will check by
concern section HOD & Dy.Safety Officer /Safety Officer at the time of gate pass procedure.
Industrial Safety Helmet For protection of head against falling objects or during fall of person from
height. Yellow Colour helmet is used for contract worker with agency
Safety Goggles/welding For protection of eyes against flying particles / dust, chemical splash, welding
goggles/chemical splash goggles spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust, chemical splash, spark,
arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in high noise level area.
Chemical suit/Gas tight suit /Fire For body protection against chemicals, oils, sharp edged objects, heat, hot
proximity suit/FR Boiler Suit objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp edged objects, heat, hot
metals/objects, electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects, sharp edged objects, heat,
Oil/Chemical/water/heat/ Electrical hot metals/objects, electricity etc..
resistance etc.
Safety Belt(full body hardness with For fall prevention while working at heights or in depth, working in vessel or
double lanyard & shock absorber) / in confined space.
Rope / Life line / Fall arrestor etc.
Dust Mask/Respirator with valve(FFP2) Protection of respiratory system against dust.
Chemical Cartridge Respirator with full Protection against toxic chemical fumes / gases/vapors/dust etc.
face mask type A2B2E2K2
Trolley mounted Air line respirators Working in oxygen deficient zone or confine space area
with full face mask
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen, etc
Portable Multi gas Detector ( Working in oxygen deficient zone & use in entry of confine space & Major fire
LEL,O2,CO,H2S,SO2, etc)
Automatic voltage detector To check the present voltage or induction voltage of electrical equipments/
bus/switch gears from 01 (one) feet distance before starting the any
electrical work .
Auto darkening welding helmet (EN 379 The new auto darkening welding helmet combines legendary Speed glass
& EN 175 Level-B) with PAPR as per EN quality and auto darkening technology with an innovative wide-view grinding
12941:1998, class TH2 and AS/NZS visor to give welders an all-in-one solution for more flexibility, precision, and
1716 efficiency.
Respiratory System is a combined face and breathing protection device, for
increased comfort and safety in welding. The unit is equipped with a particle
filter which removes particles from the air. The unit provides a constant
airflow independent of filter combinations and clogging. The unit can also be
equipped with a gas filter (for example A1B1E1). The unit supplies air to the
head top via the connecting breathing tube. The airflow creates a slight
positive pressure which together with the sealing to the face prevents
particles and other contaminants from entering the head top.
EW- 372 PUR-F-006 RFQ-
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by party/agency/contractor to their
contractor workers as per nature of job and allotment of PPE list shall be submitted to Safety Officer,
Dhuvaran on his letter head as per below mentioned format by Contractor before commencement of work
through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Work order no.
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name of Designa Name of Name of PPE IS Make Qty Unit Date Receiving
no. workers tion Section under :Code of PPE of signature
work no. of issue
execution PPE
01 Safety Helmet Nos
Safety goggles Nos
Reusable Ear Plug Pair
Dust Mask Nos
Safety Shoes Pair
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all contractor
workers at entry gate of Factory Premises & shall entered contractor workers with Safety Shoes & Safety
Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor workers
on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should always remain present
at work site. Concern JE/DE of GSECL shall be supervised the contract work as per SOP .
(18) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/C&I/Environment
survey/Chemical etc measuring /testing equipments/instruments which are used during contract work
shall be submitted before starting the work & shall be checked by concern JE/DE/EE before starting work
& it’s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of work on dangerous
substances, machineries or area at which cautionary notice is displayed and obtain “Line Clear” or “Work
Permit” through the concern Department / Section JE/DE and shall be informed to concern section JE/DE
for closed/ returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE regarding
hazards of specific work, risk & it’s control measure (mentioned in HIRA) before starting the job work
and records shall be maintained for each & every job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working in factory premises.
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief Chemist/Control room
& work related Chemical information shall be taken by contractor & contractor workers from Concern
EE/Chief Chemist before starting of chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened fixed vessel, sump,
tank, pit or opening in ground or in floor which, by reason of its depth, situation, construction or
contents ,is or may be a source of danger before starting the work each & every days or after
interval/recess. Contractor supervisor shall be informed to concerned HOD regarding any unsafe
conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile phone etc
are to be strictly followed by all workers who are working in factory premises.
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all the
inflammable material lying at or nearby worksite or cover it properly by suitable protective covering.
Also, special care shall be taken before carrying out such job & see that all possible contributing factors
to set fire shall be removed / vanished prior to commencement of the work. Advance intimation shall be
given to concerned section / fire section to commence the work in fire prone areas. They should also
keep ready all the First Aid Fire Extinguishers / equipments & fire extinguishing media / material like
sand / water buckets or other appropriate equipment at such place.
(26) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space /
Vessel Entry Permit” from concerned department prior to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be used. For
taking care of the persons working inside the confined space / vessel, a supervisor / person capable to
keep continuous watch on person(s) working inside, assist them in case of emergency or arrange to get
immediate outside help, shall remain present at entry point. Use full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants / passers etc
shall remain available near entry point or the entry point shall be cordoned by a barricaded tape with a
EW- 372 PUR-F-006 RFQ-
cautionary notice. After completion of the works, all the lids / covers / grills / grits opened, shall be re-
fixed / re-placed in the original position as it were prior to commencement of the work and leave the
work place in safe condition in all respect, so as to prevent accident to fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking material, spare parts,
tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases / ladders / lifts
or any other approaches / roads leading to plans or its auxiliaries, on which there is traffic movements or
possible traffic movements in case of emergency. Such passages are meant for safe escape in the event
of emergency. If it is utmost necessary to carry out work in such area with blocking of passage, prior
permission of Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate / declare
the area as “UNSAFE”, cordon it using barricading tape & display suitable caution notice or keep a
person to restrict / divert the traffic on this route through other safe passage.
(28) The contractor shall see that he / his persons do not work on or block (by stacking material, spare parts,
tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases / ladders / lifts
or any other approaches / roads leading to plans or its auxiliaries, on which there is traffic movements or
possible traffic movements in case of emergency. Such passages are meant for safe escape in the event
of emergency. If it is utmost necessary to carry out work in such area with blocking of passage, prior
permission of Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate / declare
the area as “UNSAFE”, cordon it using barricading tape & display suitable caution notice or keep a
person to restrict / divert the traffic on this route through other safe passage.
(29) Prior to use power / electrically operated hand tools / equipments / machines / gadgets like welding
machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is found safe to use.
Do not use defective, unsafe or improperly maintained equipments.
The electrical power supply required to run such equipments shall not be taken directly at their own but
shall be obtained through concerned Electrical Maintenance Departments or their authorized persons or
under their observations / guidance only. The Electrical Section shall provide temporary electrical
connection up to contractor’s Mains Board on which it is compulsory to install mains switch, ELCB &
fuses of adequate capacity. All such equipments shall invariably be earthed adequately to prevent
electrical shock, sparking, short circuit etc. Power cord to be used shall be of adequate capacity, without
any joint & shall consist of earth wire also. Hence, it is necessary to use adequate capacity 3-wire power
cord for single & 5-wire power cord for three phase power connections. The plugs, receptacles, pins,
holders etc shall be of adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting machine, Grinder,
Drill, Chain Pulley Blocks, Hook chooks etc required to be used during work execution shall be of
standard make & bear ISI certification mark on it. The consumables like welding electrodes, grinding
wheels / discs etc which has specific prescribed life span shall not be used in any case if its expiry date is
(30) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical contractor for
safe use in areas where hazardous, flammable, or combustible vapors, liquids, dusts, or residues may be
present in Gas Based power plant and list of tools and tackles shall be submitted with technical bid.
Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be checked by JE/DE before
commencement of Electrical work.
(31) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane, EOT
crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it shall be
checked and used only if found safe to use. Also, ensure that these are tested, examined & certified in
form no.10 by Competent Person as per the Factory act-1948 & Gujarat Factories Rules and its validity
do not expire. Further, it shall be fixed properly and firmly prior to lifting the weight. Valid Test
certificate of all Lifting machines used by Contractor to be submitted to Dy.Safety Officer/
Safety Officer before commencement of work through concerned EE/SE.
(32) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain the work
permit when working at height. While climbing on such scaffolding or working on any structure at
height, use of full body safety belt /full body hardness with double lanyard & Fall arrestor & Helmet is
compulsory. It is also necessary to fasten chinstraps of the helmet.
(33) Contractor or their employee shall not interfere in day-to-day routine plant activities / works except the
work assigned to them, shall not loiter in the areas other than their work jurisdiction, as well as shall not
temper / operate / touch the machineries/equipments/auxiliaries with which they are not concerned.
Also, the contractor shall strictly instruct their staff for not to sit or take rest at/near/below running
plants, auxiliaries, systems or any place which is risky, hazardous & prone to accident.
(34) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen, Acetylene, LPG,
Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking due care. To handle / shift such
cylinders a special trolley /cage meant for it must be used but in no case it should be rolled.
(35) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour generated area, Spark
arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on each vehicle by
party/agency and it will check by shift security in charge before entry of vehicles in the factory premises.
EW- 372 PUR-F-006 RFQ-
(36) No women or young person shall be employed or permitted to work in Lead-compound area like battery
room etc. as per schedule VI of GFR
(37) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime mover or of
any transmission machinery while the prime mover or transmission machinery is in motion. Examination
or operation of motion machinery shall be made or carried out only by a specially trained adult male
worker wearing tight fitting clothing as per section 22 of factories act
(38) In all risky job, before start the work, contractor should obtain General Safety Work Permit through
concerned section from Shift –in-charge well in advance.
(39) In case of noticing smoke or fire during their work execution, they shall make immediate efforts to
extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station Fire Officer
or Emergency Control room no which is displayed at prominent place of factory like Main Security Gate,
All unit control room, Canteen area, Safe Assembly points, Fire Station, All security gates, Occupational
Health Centre.
(40) In case of any injury / accident while working, it shall immediately be reported to Safety Department
through concerned Sectional Head / Engineer. The prescribed Form No. 21 & ANNEXURE may be
obtained from concerned section or Dy. Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer through
concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as per electricity
act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall be filled up by concern
department JE/DE with written consent of contractor. The Form may be obtained from concerned
Electrical section or Electrical Safety Officer. Electrical accident investigation shall be carried out by
Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate of injured person
with endorsement of GSECL factory Medical Officer to LWO/Dy. Safety Officer/Safety Officer/Electrical
Safety Officer then after injured person may allow for work.
(41) For any incident occurred but have no injury to any persons should also reported as per GSECL format
and informed to Dy. Safety Officer/Safety Officer as Near Miss Incident.
(42) Safety penalty shall be imposed against violation by contract workers: if any contract worker worked in a
factory contravenes any provision of factories act or any rules or orders made there under. Imposing any
duty or liability on workers, contractors/agency shall be punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, confine Rs.1000/- per day
space entry, hot work etc.
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge regulator set Rs.1000/- per set
(v) Operate Portable power tool without ELCB Rs.1000/-per equipment
(vi) Work without qualified Supervisor as per nature of job like Rs.1000/-per day
mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs. 2000/-per day
(viii) Work without test report of lifting machines / tackles (like C.P.Bs., Rs.2000/- per equipment
Hook chooks, winch, forklift, mobile crane, EOT crane etc) & its
attachments (like D-shackles, slings, U-clamps, Eye bolts or any
fixtures) in Form No.10 of Gujarat Factories Rules,1963
(ix) Work without Double lynyer Safety belt during working at Height Rs.3000/-per person
work, work without anchoring in hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
(xi) (a) Grinding machine used without safety guard/ machine guard Rs. 500/- per equipment/
(b) Unsafe welding machine like open body. Knob without per set
insulation. Connection without plug
(c) Damaged welding cables/gas pipelines
(d) Welding work doing without welding blanket.
(e) Electrical supply without 3 pin plug/industrial plug.
(f) Use of damaged electrical wire for lighting/equipments.
(g) Use of lighting lamp without cage.
(h) Use of open halogen tube.
(i) Use of damaged PPEs/use of non standard PPEs
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB. etc
EW- 372 PUR-F-006 RFQ-
During plants visit/supervision of concern JE/DE/EE,SE. Safety officer/Dy. safety officer. Electrical safety
officer , factory manager, if they will observed any safety violations as per CO circular/statutory requirements
then they must imposed safety penalty through office note directly against contract workers/contract agency
and Office Note process through proper channel to concern sectional head and Account head for recovery
purpose. Photograph/CCTV Footage is to be put a with penalty note by imposing officer.
(43) Party will damage any fire equipments or property or machinery in factory during execution of work, total
damage cost will be recovered from party RA bill and recovery Office note put up by concern HOD.
(44) All the relevant labour and industrial laws shall also be followed compulsorily.
(45) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces, scrap etc. are to be
removed by contractor and scrap shall be deposited to scrap yard of Main Store.
(46) For performance evaluation of contractor, safety factors of work accident, fire incident & near miss accident
will be considered. Steps can be taken to review the job assignment up to cancellation for negligence.
(47) Over & above these, contractor shall have to follow all the safety requirements /rules & regulations / norms
and legal provisions laid down in various statutes. Particularly the provisions of The Factories Act-1948 & the
Gujarat State Factories Rules-1963 (Amended up to date), The Electricity Act-2003 & rules, BOCW Act/Rules
shall be followed strictly. The contractor shall also obey the rules / regulations / instructions of the local
Competent Authority for safety & health requirements.
(48) The above rules shall be scrupulously followed and where required, Contractor /contractor workers may
contact to the Dy.Safety Officer/Safety Officer/Electrical Safety Officer in case of any ambiguity or needs
further guidance in this regard.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
ANNEXURE - I
EW- 372 PUR-F-006 RFQ-
ON STAMP PAPER OF Rs.300/-
FORM OF BANKER’S UNERTAKING
(For Security Deposit for work period as per Terms and Conditions of Tender)
We, Bank of ______________________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Gujarat State Electricity Corporation
Limited, or any Officer authorized by it in this behalf any amount up to and not exceeding
Rs.__________ (in words) Rupees
to the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract for
the supply / works specified below :
L.O.I. No. _____________________________________________________ dated ______________.
This agreement shall be valid and binding on this Bank up to and inclusive of________________ and
shall not be terminable by notice or by change in the constitution of the Bank or the firm of Contractors
/ Suppliers or by any other reason whatsoever and our liability hereunder shall not be impaired or
discharged by any extension of time or variations or alterations made, given conceded or agreed, with
or without our knowledge or consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice
this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL or Subsidiaries).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be
entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is restricted
to Rs._______________ (Rupees _______________________________________________________
only). Our guarantee shall remain in force until _______________ (date of validity of the Guarantee).
[Unless demands or claims under this Bank Guarantee are made to us in writing on or before
_____________ (date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee
shall be forfeited and we shall be released and discharged from all liabilities there under]:
Please Mention here Complete Postal Signature of
Address of the Bank with Branch Code, Bank’s Authorized Signatory
Telephone and Fax Nos. with Official Round Seal
EW- 372 PUR-F-006 RFQ-
List of Banks for acceptance of Bank Guarantee as security deposit(SD)/ EMD :
As per Finance department GR No: FD/MSM/e-file/4/2025/2712/DMO dt: 01.04.2026
A) As per the Government Resolution issued by the Finance Department, Government of Gujarat, Bank
Guarantees accepted towards Security Deposit and Earnest Money Deposit shall be from the institutions
listed below.
B) Guarantees issued by the following banks will be accepted as SD/EMD for the period up to March
2027. The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee irrespective
of the date of termination of Bank Guarantee.
1. AXIS Bank
2. A U Small Finance Bank
3. Bandhan Bank
4. City Union Bank
5. CSB Bank
6. DBS Bank India Limited
7. DCB Bank
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. Federal Bank
11. HDFC Bank
12. HSBC Bank
13. ICICI Bank
14. IDBI Bank
15. IDFC First Bank
16. Indusland Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
22. RBL Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnadu Mercantile Bank
26. Ujjivan Small Finance Bank
27. Yes Bank
28. Ahmedabad Mercantile Co-Operative Bank
29. Nutan Nagrik Sahakari Bank Ltd.
30. Rajkot Nagrik Sahakari Bank Limited.
31. Sarswat Co-Operative Bank Ltd.
32. SBPP Co-operative Bank LTD
33. SVC Co-Operative Bank Ltd.
34. The Cosmos Co-op Bank Ltd., Baroda
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-operative Bank
37. The Surat Peoples Co-operative Bank Ltd.
38. The Baroda Central Co-Operative Bank
39. The Panchmahal District Co-operative Bank
40. The Kalupur Commercial Co-operative Bank
41. The Rajkot Commercial Co-operative Bank
42. The Banaskantha Mercantile Co-operative Bank
43. Gujarat Gramin Bank
EW- 372 PUR-F-006 RFQ-
EMD BANK GUARANTEE FORMAT
FOR TENDER /ENQ. NO. ___________________________________
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300)
WHERE as M/s. _______________________________________________________________
(Name and Address of the Firm) having their registered Office at
_________________________________________________(Address of the Firm’s registered Office)
(hereinafter called the Tenderer) wish to participate in the Tender No.__________________________
for______________________________________ of (supply / Erection / Supply & Erection / Work) of
__________________________________ (Name of the material / equipment / work) for
_________________________ Gujarat State Electricity Corporation Limited and WHEREAS a Bank
Guarantee for (hereinafter called the “Beneficiary”) Rs. _____________ (Amount of EMD) valid till
____________ (mention here date of validity of this Guarantee which will be 4 (FOUR) months beyond
initial validity of Tender’s offer) which is required to be submitted by the Tenderer along with the
(Name of the Bank and address of the Branch giving the Bank Guarantee) having our registered Office
at _____________________ (Address of Bank’s registered Office) hereby give this Bank Guarantee No.
_________________dated ____________ and hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Gujarat State Electricity Corporation Limited or any Officer
authorized by it in this behalf any amount not exceeding Rs.____________ (amount of EMD) (Rupees
______________________________________________________) (in words) to the said Gujarat State
Electricity Corporation Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the tender or part thereof by the Tenderer within its validity or non-submission of Security
Deposit by the Tenderer within one month from the date of tender or a part thereof has been accepted
by the Gujarat State Electricity Corporation Limited would constitute a default on the part of the
Tenderer and that this Bank Guarantee is liable to be invoked and encased within its validity by the
Beneficiary in case of any occurrence of a default on the part of the Tenderer and that the encased
amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of____________________
(mention here the date of validity of Bank Guarantee) and shall not be terminated by notice or by
Guarantor change in the constitution of the Bank or the Firm of Tenderer or by any reason whatsoever
and our liability hereunder shall not be impaired or discharged by any extension of time or variations or
alterations made, given, conceded with or without our knowledge or consent by or between the
EW- 372 PUR-F-006 RFQ-
Tenderer and the Gujarat State Electricity Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice
this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL or Subsidiaries).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be
entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee is restricted to
Rs. ________ (amount of EMD) (Rupees ________________________________________ (in words).
Our Guarantee shall remain in force till _____________ (date of validity of the Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before ___________
(date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited
and we shall be released and discharged from all liabilities there under.
Please mention here complete Postal Signature of the
Address of the Bank with Branch Code, Bank’s authorized
Telephone and Fax Nos. Signatory with Official Seal.
EW- 372 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED- GTPS
INTEGRITY PACT
OUR ENDEAVOUR
To create an environment where Business Confidence is built through Best Business Practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and their users
for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical Not to bring pressure recommendations
standards in business and professions. from outside GSECL to influence its
decision..
Ensure maximum transparency to the Not to use intimidation, threat, inducement
satisfaction of stakeholders. or pressure of any kind on GSECL OR ANY
OF it’s employees under any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in fulfilling
agreement/contract and to consider the contract, agreement, legal obligations.
objectively the view point.
To ensure regular and timely release of To provide goods and / or services timely
payments on due dates for work done. as per agreed quality and specifications at
minimum cost to GSECL.
To ensure that no improper demand is To abide by the general discipline to be
made by employees or by anyone on maintained in our dealings.
our behalf.
To give maximum possible assistance to To be true and honest in furnishing
all the Vendors/Suppliers/Service information.
Provider and other to enable them to
complete the contract in time
To provide all information to Not to divulge any information, business
suppliers/contractors relating to details available during the course of
contract / job which facilitate him to business relationship to others without the
complete the contract / job successfully written consent to GSECL.
To ensure minimum hurdles to vendors Not to enter into carter / syndicate
/ suppliers / contractors in completion /understanding whether formal / non
of agreement / contract / work order. formal so as to influence the price.
Seal & Signature Seal & Signature
(GSECL’s Authorized Signatory) (Party’s Authorized Person)
Name : Name:
Designation:
Name : Name:
Designation:
EW- 372 PUR-F-006 RFQ-
On Firm’s Letter Head
CERTIFICATE - A
I / We ________________________________________________ authorized signatory of
M/s._________________________________________________here by Certify that
M/s. _____________________________________________ is not related with other firms who have
submitted tenders for the same items under this inquiry / Tender.
Signature of the Tenderer
With Designation
Seal of the Firm
EW- 372 PUR-F-006 RFQ-
GENERAL GUIDELINES RELEVANT TO I.S.
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF
STEEL / CEMENT
EW- 372 PUR-F-006 RFQ-
GENERAL GUIDELINES RELEVANT TO IS
Please refer latest edition of relevant Indian Standard Specification of Code i.e. B.I.S.
General relevant I.S. of B.I.S. shall prevail for all items including materials,
measurements etc.
The Item wise detailed specifications are intended for full description of items covered
by Schedule “B”. The specifications are not however intended to cover every detail and
the works shall be executed according to the spirit of the specifications below and the
best prevailing P.W.D. practice. The clarification to any clause in detailed specifications
shall be sought from the latest edition of relevant I.S. specification and codes. Where
these specifications are at variance with the specification laid down in the I.S. Books
stated above, the former will be applicable. As regarded matters not covered by any of
the above specification, the decision of the Engineer-in-charge shall be treated as final
and shall be binding upon the contractor. The contractor is expected to get clarified any
doubt about specification, etc. before tendering by discussing with Engineer-in-charge.
For detail technical specification, the item wise description along with above general
specifications shall hold good.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
SPECIAL CONDITIONS FOR USE OF CEMENT IN WORK
1 The rates in Schedule – ‘B’ is inclusive of cement cost. Contractor has to purchase
fresh 43 grade cement confirming to as per IS 8112 Or PPC IS 1489 (Part-I) or as per
tender condition.
2 Contractor has to construct pucca Go down at site of work so that cement bags can be
properly preserved to avoid damage due to any kind of water/Humidity.
3 Contractor has to bring sufficient quantities of cement bags to maintain progress of
work. The work should not suffer for want of cement.
4 Cement should be used to achieve required strength in cement concrete or as per item
proportion.
5 To bring sufficient & timely cement at site is full responsibility of contractor. Nothing
extra will be paid on account of any reason to maintain progress of work and to
complete the work in schedule time.
6 Contractor has to submit material A/c. For consumption of cement used with every bills.
In case of not submitting the same, bill will not be passed. Party has to submit the copy
of cement purchased bill and Challan/invoice along with each RA Bill/Final Bill.
7 No negative variation will be allowed for consumption in cement less then prescribed as
per R & B SoROR Corporation/mix design and nothing will be paid extra for over
consumption.
8 Contractor is fully responsible for safety of cement at site; nothing will be paid extra on
account of safety.
9 If Corporation’s authorized representative wants to check cement stock at site,
contractor has to allow for the same at any time.
10 Contractor has to maintain day to day cement consumption / balance account at site.
11 As far as possible, contractor has to maintain supply of cement of only one brand &
grade throughout the work and on account of closer/shortage of approved brand,
cement of other brand in accordance of condition No. (1) Will be allowed by Engineer –
in – Charge.
12 Minimum cement consumption considered for cement concrete having grade of M–15 /
M – 20 / M – 25 is 320 Kgs. / 375 Kgs / 400 Kgs. respectively. Contractor has to use
minimum cement as above. Contractor should not use less than the prescribed
quantities of cement even in the case of mix design recommends lower quantity. For
other items cement consumption shall be as per provisions of SoR without any negative
variation. Nothing will be paid extra for over consumption.
13 Contractor will be allowed to carry out work only after physical verification of cement
brought at site.
14 Full cement bags brought by contractor shall be entered at IN GATE of
Gayatri/Control/Sangol of Wanakbori, TPS.
EW- 372 PUR-F-006 RFQ-
Approved Name of Firms of Manufactures of Civil Items Allowed to use being supplied by
contractors in civil works
Sr. Name of approved Vendor List of Company & their Brand Name in Market
01 A.C.C. Cement A.C.C
02 Ambuja Cement Ambuja
03. Ultratech Cement (L&T) Ultra-tech
04 Birla Cement Birla A-1
05 J.K. Cement J.K.
06 J.K. Laxmi Cement J.K.Laxmi
07 India Cement Corromandal King
08 Sanghi Cement Ltd. Sanghi
09 Shree Digvijay Cement (SDCC) Kamal
10 Wonder cement Ltd, Rajasthan Wonder, Wonder Xtreme, Wonder Plus
11 HI-BOND Cement Hi-Bond
12 Shree Cement Limited Shree/Bangur/Rock
Strong/Roofon/Bangur Power
13 Midland Concrete Pvt. Ltd., Rajkot S O L ID
CONSTRUCTION CHEMICALS
01 Red Wop Chemicals Rajkot
02 Samrock Chemicals Ahmedabad
03 MAPEI Construction Products India Pvt Ltd., Vadodara
04 Krishna Conchem Products Pvt Ltd., Navi Mumbai
05 Ultra Tech Cement Limited, Mumbai, Wada
(Building Product Division).
06 Asian Paints Ltd. (Construction Chemicals Ankleshwar
07 Prashita Associates L.L.P.,Por, Vadodara FAIR MATE
Water Proofing &Wrapping Coating
01 Bitumag Industries Vadodara
02 A.R. Industries Vadodara
03 Tiki Tar Danosa (India) Pvt. Ltd. Halol
04 STP Ltd., Ankleshwar
Flooring Tiles
01 Asian Granito Sabarkantha
02 Somany Kaloal
03 Simpolo Morbi
04 Varmora Morbi
05 Sunheart Morbi
06 Emcer Morbi
07 Cengres Ahmedabad
EW- 372 PUR-F-006 RFQ-
Pipes and Fittings
1 Astral Limited, Ahmedabad ASTRAL
2 Dutron Polymers Limited, Ahmedabad DURTON
01 Tata Iron & Steel Co. Ltd TATA
02 Jindal Jindal
03 Lloyds Llyods
04 Essar Steel Ltd. Essar
05 Steel Authority of India. SAIL
06 Parmeshwar Steel Pvt ltd. God TMT
07 Gallant Ispat Ltd. Gallant TMX
08 Aditya Ultra Steel Pvt. Ltd. KAMDHENU NXT & Kay 2 TMT
09 Mono steel India Ltd. MONO TMT
10 Aashiana Rolling Mills Ltd. Friends Steel
11 Electro Therm (I) Ltd. ET TMT
12 H.K. Ispat .Pvt. Ltd. Kothi
13 SRJ peety steel Pvt. Ltd. SHREE OM TMT/SRJ TMT/KAPILA
PURE STEEL
14 NilkanthConcast Private Limited Nilkanth
15 Shreeyam Power & Steel Industries Limited National
16 Utkarsh Bars Private Limited Utkarsh
17 Bhagyalaxmi Rolling Mill Pvt. Ltd Polad
18 ShriKhatuShyam Alloys Pvt. Ltd., Khatu TMT
19 Steefo Steels LLP, Ahmedabad STEEFO TMT
20 Haq Steel &MetaliksLtd.,Kutch GERMAN TMX
21 K.B. Ispat Private Ltd., Bhavnagar KB TMT
22 VMS TMT Private Ltd., Ahmedabad KAMDHENU NXT & Kay 2 TMT
23 BriskonMultimetals LLP
24 Kalika Steel Alloys Pvt. Ltd., Jalna KALIKA 500 TMT
25 Anjar TMT Steel Pvt.Ltd.,Anjar Welspun Shield
26 ShriBajrang Power &Ispat Ltd. Goel TMT & Pipes
27 Rajuri Steels &TMT Bars Pvt. Ltd. Rajuri Steel
28 SMW Steel Sangam
29 Rathi Steel & Metal Pvt. Ltd. Icon Steel
30 MetarollsIspat Pvt. Ltd. Metarolls TMT
31 SaiBandhanInfinium Pvt. Ltd., BANDHAN TMX
32 Gajkesari Steels & Alloys Pvt. Ltd GAJKESARI TMX
33 Rudra Global Infra Product Ltd., RUDRA TMX
34 Varrsana Ispat Ltd.,Gandhidham VARRSANA TMT
35 Jay Bharat Steel Corporation, Kutch JAY BHARAT TMX &
36 Jideep Ispat & Alloys Pvt Ltd, Indore MOIRA CRS &TMT
37 N.N. Ispat Pvt. Ltd., West Bengal U L T R AMAX TMT
38 R S VIRLA Pvt Ltd, Rajkot R S VIRLA TMT & R STMT
39 Bindra Steel Pvt. Ltd, Jalna ROOPAM TMT
40 Rashmi Metaliks Ltd, Kolkata, W.B RASHMI TMT
41 Vinayak TMT Bars Pvt.Ltd.,Gandhinagar VINAYAK TMT
42 MS Agarwal Foundries Pvt. Limited, AF STAR TMT
Secunderabad
EW- 372 PUR-F-006 RFQ-
In addition to the above Approved Vendor List of GSECL, the approved vendor list of GUVNL
and its subsidiary company i.e. GSECL/GETCO/MGVCL /PGVCL/DGVCL & UGVCL which are
available on their website- in tender head including above mention various manufacturers are
also to be treated as Approved Vendors.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LTD
GANDHINAGAR THERMAL POWER STATION
GANDHINAGAR-388239
work at Administrative office GTPS.”
DEVIATION FROM BIDDER (IF ANY)
1. GSECL does not bind to accept the deviation offered by bidder for evaluation of tender.
2. If there is any deviation from bidder, it should be clearly mentioned on this page.
3. Deviation mentioned on other page should not be considered and order will be placed according to
the tender documents.
4. If there is no any deviation from bidder, than it must be clearly mentioned in this page “NO
DEVIATION OFFERRED”
Signature of the Contractor
EW- 372 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LTD
WANAKBORI THERMAL POWER STATION
PO :THERMAL, TA:GALTESHWAR,
DI:KHEDA-388239
at Administrative office GTPS.”
ANNEXURE -
(UNDERTAKING IN REGARD TO STOP DEAL / BLACK LIST
All Bidders will have to furnish the following Undertaking duly filled in, signed and stamped for
each quoted item of the Tender along with the Technical Bid.
Sub:- Undertaking in regard to Stop Seal / Banned for Business Dealing / Black List Thereof.
Ref:- Tender No:
I / We ________________________________________________________________ Authorized
signatory of M/s. _________________________________ _____________
Hereby certify that M/s.____________________________________________________
And their proprietor / any partner / any directors of the firm is not stop deal and/or banned for
business dealing and/or black listed by GUVNL and/or their any subsidiary company viz. GSECL /
GETCO / DGVCL / MGVCL / UGVCL / PGVCL”.
Seal of the Firm.
Signature of the Tenderer.
EW- 372 PUR-F-006 RFQ-
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
EW- 372 PUR-F-006 RFQ-
GENERAL SPECIFICATIONS
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as directed”/”approved”
by the Engineer-in-charge.
02. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
03. In “Mode of Measurement” in the specification wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points or
aspects in the relevant Indian Standards shall be referred to.
04. All measurements and computations, unless otherwise specified, shall be carried out as per
Latest IS:
05. The distance which constitutes lead shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard
shall be taken as final.
06. Where no lead is specified, it shall mean “all leads”.
07. Lift shall be measured from plinth level.
08. Up to “floor two levels” means actual height of floor up to 6.5 Mt. Above plinth level.
09. Definite particulars covered in the items of work, though not mentioned or elucidated in it,
specification shall be deemed to be included therein.
10. Reference to specifications of materials as made in the detailed specification of the items of work
is in the form of a designation containing the number of the specification of the material and
prefix ‘M’ e.g. ‘M-5’.
11. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any
payment or compensation whatsoever on account of any such materials being rejected by the
Engineer-in-charge.
12. The contract rate of the item of work shall be for the work completed in all respects.
13. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
14. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign
matter and to ensure the preservation of their quality and fitness for the work.
15. Cement, reinforcements bars & all other materials to be used shall be got approved from EIC
before starting of work. The cement, reinforcement steel & other materials to be brought at site
shall be entered at GANDHINAGAR, TPS main entry gate.
16. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work.
17. No materials shall be stored prior to, during and after execution of a structure in such a way as
to cause or lead to damage or overloading of the various components of the structure.
18. All works shall be carried out in a workmanlike manner as per the best techniques for the
particular item.
19. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
20. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion of
the structure.
21. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides satisfactory
evidence that such special mode of construction is safe, sound and helps in speedy construction
and completion of work to the required strength and quality. Acceptance of the same by the
Engineer-in-charge shall not, however, absolve the contractor of the responsibility of any adverse
effects and consequences of adopting the same in the course of execution of completion of the
EW- 372 PUR-F-006 RFQ-
22. All installations pertaining to water supply and fixtures thereof as well as drainage lines and
sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
Contractor.
23. The contractor shall be responsible for observing the rules and regulations imposed under ‘Minor
Minerals Act’ and such other laws and rules prescribed by Government from time to time.
24. All necessary safety measures and precaution [including those laid down in the various relevant
Indian Standards shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
25. The testing charge of all materials shall be borne by the Contractor unless recovery at one
percent towards using charges is separately made.
26. Approval to any of the executed items for the work does not in any way relieves the contractor
of his responsibility for the correctness, soundness and strength of the structure as the drawings
and specification.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
TECHNICAL SPECIFICATIONS
Administrative office GTPS.”
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as directed”/”approved” by the
Engineer-in-charge.
02. In “Mode of Measurement” in the specification wherever a dispute arises in the absence of specific mention of
a particular point or aspect, the provisions on these particular points, or aspects - the relevant Indian Standards
shall be referred to.
03. All measurements and computations, unless otherwise specified, shall be carried out nearest to the following
a. Length, width and depth (height) -----------0.01 Meter.
b. Areas-------------------------------------------- 0.01 sq Mt.
c. Cubic Contents-------------------------------- 0.01 Cu. Mt.
04. The distance which constitutes lead shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
05. Where no lead is specified, it shall mean “all leads”.
06. Lift shall be measured from plinth level.
07. Reference to specifications of materials as made in the detailed specification of the items of work is in the
form of a designation containing the number of the specification of the material and prefix ‘M’ e.g. ‘M5’.
08. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the contractor
from the responsibility of replacing defective material brought on site or materials used in the work found defective
at a later date. The contractor shall have no claim to any payment or compensation whatsoever on account of any
such materials being rejected by the Engineer-in-charge.
09. The contract rate of the item of work shall be for the work completed in all respects.
10. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
11. Collection of approved materials shall be done at site of work in a systematic & sequantial manner. Materials
shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign matter and to ensure
the preservation of their quality and fitness for the work.
12. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site of
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking lines,
levels, alignment of the works during execution shall be kept in sufficient numbers and in good working condition
on the site of the work.
14. Special modes of construction not adopted in general Engineering practice, if proposed to be adopted by the
Contractor, shall be considered only if the contractor provides satisfactory evidence that such special mode of
construction is safe, sound and helps in speedy construction and completion of work to the required strength and
quality. Acceptance of the same by the Engineer-in-charge shall not, however, absolve the contractor of the
responsibility of any adverse effects and consequences of adopting the same in the course of execution of
completion of the work.
15. All installations pertaining to water supply and fixtures thereof as well as drainage lines and sanitary fittings
shall be deemed to be completed only after giving satisfactory tests by the Contractor.
16. The contractor shall be responsible for observing the rules and regulations imposed under ‘Minor Minerals Act’
and such other laws and rules prescribed by Government from time to time.
17. The testing charge of all materials shall be borne by the Contractor & reports of authorize laboratory shall be
submitted timely.
18. Approval to any of the executed items for the work does not in any way relieves the contractor of his
responsibility for the correctness, soundness and strength of the structure as per the drawings and specification.
19. Due care at all the items shall be taken to see that no damage is caused to the existing setup of GSECL. In
case of any such damage is caused, it shall be restored by the agency at his own cost.
EW- 372 PUR-F-006 RFQ-
DETAILED TECHNICAL SPECIFICATIONS
NOTE: BOOKLET FOR “GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS” OF R. & B.
DEPARTMENT, GOG, GUJARAT AND BOOKLET OF “GENERAL SPECIFICATION FOR CIVIL WORKS” OF
GSECL WILL BE AVAILABLE IN CIVIL OFFICE AT GANDHINAGAR TPS FOR REFERNCE OF RELEVANT
DETAIL SPECIFICATIONS OF ITEMS. SHALL BE CONSIDERED & ADOPTED IN WORK.
DETAIL SPECIFICATION
Item no.
PARTITION WALL: Providing and fixing aluminum solid or glazed or solid and glazed single
skin 55mm thick partition of dimension 55mm x 25mm aluminum powder coated, extruded
sections with 12mm thick prelam MDF panel in solid or solid and glazed partition fitted with
bidding clips These clips shall be made from aluminum and the powder coating shalt be
done of the same shade as directed by EIC
Detail specification as per item description and as per instruction of EIC.
The material shall be of ISI mark Jindal/Hindalco/Nalco/Balco/Manakshia make or as approved by EIC.
Size of partition section shall be 55mm x 25mm x 1.2mm thick having minimum weight of 0.400 kg/m.
Item includes provision of door if required at site with all required fixtures and fasteners and door closure
of standard make.
Glass to be used for glazing shall be of 5mm thickness and of Saint Gobain or Modiguard make or as
approved by EIC.
Mode of Measurement:
Payment shall be made on square meter (SQM).
Item no.2 TUFFEN GLASS: Providing and fixing in position 12 mm Thick Glass (saint gobain
or modi guard) to be fixed with both side teak wood bidding patti,as per Architect's design,
approved shade - strictly as per design and drawing complete to be measured and paid
inSq.fts. incl. Fixing & Transport.
The detailed specification for this item, as outlined in Schedule B and directed by the Engineer-
in- Charge (EIC). All materials and workmanship must adhere to the highest quality standards,
be inspected by the EIC, and comply with relevant Indian Standards (IS Codes) and
manufacturer's specifications. Skilled workers under experienced supervision will execute the
work, following industry’s best practices. Material samples may be required for approval. The
EIC or their representative can inspect materials and workmanship at any stage, and non-
conforming work must be rectified immediately. The contractor must adhere to the approved
items, report any delays, and ensure safety compliance throughout the work.
Mode of Measurement:
Payment shall be made on square Feet (SFT).
Item no.3 GLASS DOOR: Providing and fixing in true line level and in position Glass door of
size 6'8" x 3' & 12 MM Thick toughened glass as per Design with Hardware of approved SS
Grade 304 and Floor spring of approved brand like JKV, Aura, or equivalent Brands incl.
Fixing and Tansport Complete.
The detailed specification for this item, as outlined in Schedule B and directed by the Engineer-
in- Charge (EIC). All materials and workmanship must adhere to the highest quality standards,
be inspected by the EIC, and comply with relevant Indian Standards (IS Codes) and
manufacturer's specifications. Skilled workers under experienced supervision will execute the
work, following industry best practices. Material samples may be required for approval. The EIC
or their representative can inspect materials and workmanship at any stage, and non-
conforming work must be rectified immediately. The contractor must adhere to the approved
items, report any delays, and ensure safety compliance throughout the work.
Mode of Measurement:
Payment shall be made on Nos..
EW- 372 PUR-F-006 RFQ-
Item No.4 CABINETS: Providing and Fixing in position cabinates made with 8 &19mm thick
plywood of brand Euro, Greenply, SRG or equivalent approved brand for Back and
Partition,25 mm block Board Shutters, 1 mm Thick white Laminate of Greenlam, merino or
equivalent brand for internal Surface and 1 mm over Shutters along with all Necessary
accessory fittigs of SS Grade 304 including L-SS Hinges, screws, Knobs, Chain, Magnets,
locks etc. complete to be measured and made with depth upto 1'6" and paid in Sq.ft
The detailed specification for this item, as outlined in Schedule B and directed by the Engineer-in- Charge
(EIC). All materials and workmanship must adhere to the highest quality standards, be inspected by the EIC,
and comply with relevant Indian Standards (IS Codes) and manufacturer's specifications. Skilled workers
under experienced supervision will execute the work, following industry best practices. Material samples may
be required for approval. The EIC or their representative can inspect materials and workmanship at any
stage, and non-conforming work must be rectified immediately. The contractor must adhere to the approved
items, report any delays, and ensure safety compliance throughout the work.
Mode of Measurement:
Payment shall be made on SFT.
Item No. 5: Pro. And fixing single layer water proof gypsum board 12.5 mm thick sections
using water proof board of size 1220 mm x 1830 mm x 8.0 mm suspended by GI suspender
channel of size 25 mm x 3 mm with intermediate channel og size 18 mm x 40 mm x 0.8 mm
at 1220 mm center to center ceiling section of size 40 mm x 35 mm x0.55 mm at 457 mm
c/c and perimeter channel A of size 20 mm x27 mm x 30 mm x 0.5 mm at edges & drops
incl.paper tap sand sofit cleat, anchor fastener, scoch bolt connecting cleat,joining
compound top coat on ceiling incl. making necy. opening for light fitting, diffuser etc. comp.
as per detail drawing as directed.
Work shall be carried out as per the item description and as per the directives of engineer in charge.
The rate shall be for a unit of Square Meter.
Item No. 6: Execution of Any item of Latest GOG SOR-2024-25, Approved PO, Rate analysis
for completion of above work.
Work shall be carried out as per the item description and as per the directives of engineer in charge.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
SECTION –H
SCHEDULE - B
Administrative office GTPS.
EW- 372 PUR-F-006 RFQ-
Schedule B
office GTPS.”
Description Qty Unit Rate Amount
PARTITION WALL : Providing and fixing
aluminium solid or glazed or solid and
glazed single skin 55mm thick partition of
dimension 55mm x 25mm aluminium
powder coated, extruded sections with 12mm
thick prelam MDF panel in solid or solid and
glazed partition fitted with bidding clips
These clips shall be made from aluminium
and the powder coating shalt be done of the
same shade as directed by EIC.
TUFFEN GLASS: Providing and fixing in
position 12 mm Thick Glass (saint gobain or
modi guard) to be fixed with both side teak
wood bidding patti,as per Architect's design,
wood bidding patti to be colored with
approved shade - strictly as per design and
drawing complete to be measured and paid
inSq.fts. incl. Fixing & Transport.
GLASS DOOR: Providing and fixing in
true line level and in position Glass door of
size 6'8" x 3' & 12 MM Thick tuffen glass as
per Design with Hardware of approved SS
Grade 304 and Floor spring of approved
brand like JKV, Aura, or equivalent Brands
incl. Fixing and Tansport Complete
CABINETS: Providing and Fixing in
postion cabinates made with 8 &19mm thick
plywood of brand Euro,Greenply,SRG or
equivalent approved brand for Back and
Partition,25 mm block Board Shutters, 1 mm
Thick white Laminate of Greenlam,merino
4 or equivalent brand for internal Surface and 61.00 SFT 1038.91
1 mm over Shutters along with all Necessary
accessory fittigs of SS Grade 304 including
L-SS Hinges, screws, Knobs, Chain,
Magnets ,Locks etc. complete to be
measured and made with depth upto 1'6" and
paid in Sq.fts
Pro. And fixing single layer water proof
gypsum board 12.5 mm thick sections using
water proof board of size 1220 mm x
mm x 8.0 mm suspended by GI suspender
channel of size 25 mm x 3 mm with
intermediate channel og size 18 mm x
mm x 0.8 mm at 1220 mm center to center
ceiling section of size 40 mm x 35 mm x0.55
mm at 457 mm c/c and perimeter channel A
of size 20 mm x27 mm x 30 mm x 0.5 mm at
EW- 372 PUR-F-006 RFQ-
edges & drops incl. paper tap sand sofit
cleat, anchor fastener, scoch bolt connecting
cleat, joining compound top coat on ceiling
incl. making necy. opening for light fitting,
diffuser etc. comp. as per detail drawing as
Execution of Any item of Latest GOG SOR-
6 2024-25, Approved PO, Rate analysis for 1.00 JOB 20000
completion of above work.
In word:- In word Four Lakh Ninety five Thousand Eight hundred eight and paisa sixty nine only.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 372 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
Ph. 91-79-23215663Fax: 91-79-23217673, e-mail:
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Safe Maintenance Procedure
office GTPS”
1. Scope: :- “ Providing and fixing Additional partition and other misc. work at Administrative office
2. Isolation :
1. Prohibit work on new and existing live circuits until all power is shut off and a positive permit to
work system is in place.
2. Do not use worn electrical cords or cables.
3. Use only 3-wire type extension cords.
4. Maintain all electrical tools and equipment in safe condition and check regularly for defects.
5. Remove broken or damaged tools and equipment from the jobsite.
6. Protect all temporary power (including extension cords) with circuit protection device.
7. Do not bypass any protection system or device designed to protect employees from contact with
electrical current.
8. Locate and identify overhead electrical power lines. Make sure that ladders, scaffolds, equipment or
materials never come into close proximity of electrical power lines.
9. Unsafe hand tools should not be used.
10. Impact tools, such as drift pins, wedges, and chisels, should be kept free of mushroomed heads.
11. The wooden handles of tools should be kept free of splinters or cracks and should be kept tight
and fit in the tool
12. Electric power operated tools should either be of the approved double-insulated type and clearly
labeled or properly grounded using approved three-wire cord having the ground wire permanently
connected to the tool frame as a means for grounding the other end
13. All hydraulic or tools which are used on or around live power lines or equipment should be
equipped with suitable non-conducting hoses and properly maintained.
3. Work Procedure
(A) Disposal of building debris/waste/rubbish
1. Rubbish burning on worksites or cigarette butts left by workers igniting combustible waste on
site could cause fire.
2. Scrap wood or chips, saw dust waste, and paper bags or cartons should be removed from the
immediate work area as the work progresses.
3. All solvent waste, oily rags, and flammable liquids should be kept in fire resistant covered
containers until they are removed from the worksite.
(B)Safe access
1. provide stairways, ladders, ramps, or other safe means of egress to workplaces such as working
platforms position the means of egress within a reasonable distance from workers use structural ramps
solely for access or egress from excavations designed by a competent person ensure that when two or
more components form a ramp or runway, they must be connected to prevent displacement
(C) Working platforms and Scaffolds
A contractor has to make and keep every place of work on construction site safe, and in particular, to
take suitable and adequate steps to prevent persons from falling from a height of 2m or more from any
of these structures
1. Provide safe access to and egress from all platforms.
2. Keep all work platforms free from load, such as construction wastes.
3. Suitably place platforms on sound base, such as scaffolds, to prevent displacements.
EW- 372 PUR-F-006 RFQ-
4. Prevent movement or tipping, especially surface dirt of platforms.
5. Erect and dismantle scaffolds and platforms only under the supervision of a competent person.
6. Each scaffold must be capable of supporting the load intended.
7. The competent person must inspect scaffolds before each use.
8. Use sound base plates to level or stabilize the footings.
(D) Planking
1. Closely plank a scaffold to provide a safe working platform. The working platform decking must
be free from patent defects.
2. Extend planks or decking material sufficiently over the edges or cleat them to prevent
displacement.
3. Avoid over extending the platform beyond the end supports to prevent tipping when workers are
stepping or working on it.
4. Avoid over extending the platform beyond the end supports to prevent tipping when workers are
stepping or working on it.
5. Be sure that working platforms are of a proper size and, for metal scaffolds, end hooks are
available and attached to the scaffold frame.
(E) Ladders
1. Secure ladders near the top and/or at the bottom to prevent them from slipping.
2. Place ladders at the proper angle (1:4 from base to vertical rise).
3. Extend ladders above the landing by 1 m.
4. Avoid using ladders near busy passageways or roads with busy car traffic, use other means or
otherwise fence off the area.
5. Keep ladders in good conditions and free of defects.
6. Check all ladders before use for broken rungs or other defects periodically.
(F) Cement and concrete Work
1. To protect skin from cement and cement grout, workers should wear:
2. suitable chemical resistant gloves
3. coveralls
4. waterproof boots
5. suitable respiratory protective equipment against dusts, e.g. cement dust
6. suitable eye protectors such as shields and goggles with side-shields should be provided for
mixing, grouting, or cement and other activities
(G) Working with solvents and paints
1. Don’t touch solvents and paints with bare hands. Wear protective gloves.
2. Don’t try to suck solvents and paints with your mouth. Use appropriate liquid delivery tools.
3. Don’t use container with narrow opening as it traps heat and/or gases.
4. Don’t mix oxidizing agents with flammable/ combustible substances.
5. Don’t eat, drink and smoke while using solvents and paints.
4 Reporting
Contractor supervisor reported to consult department site in charge engineer. After completion of
work all man and material removing from site and cleaning site as per direct site in charge.
EW- 372 PUR-F-006 RFQ-
JOB SAFETY ANALYSIS
JSA for: :- “Providing and fixing Additional partition and other misc. work at Section:
Administrative office GTPS” Civil PH
Job Step Hazard Risk Control responsibility
level measures
Partition wall, other wooden and glass work Injury to High Wear Contractor
hands, safety supervisor
feet, shooes
resistance
Prepared by Checked by Reviewed by Approved by
( ) SE ( ) Safety Officer Factory Manager Chief Engineer
EW- 372 PUR-F-006 RFQ-
COMPULSORY UNDERTAKING OF BIDDER REGARDING QUALITY OF PPES
(PERSONNEL PROTECTIVE EQUIPMENTS)
Ref.: Tender no.:
Authorized signatory of M/s
Sr. No. Name of PPE IS: Code no. of PPE Make of PPE Qty Unit
1 Safety Helmet Nos.
2 Safety Goggles Nos.
3 Reusable ear Plug Pair
4 Dust Mask Nos.
5 Safety Shoes Pair
6 Hand Gloves Pair
7 Gum Boots Pair
lf our company is not provided above mentioned good quality of PPE's, Safety Officer and Factory
manager shall be empowered to stop the work without any notice.
Seal of the Firm
Signature of Authorized signatory
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-372_05_11_2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .