| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC HIMACHAL PRADESH HP | ₹15.9 L Quoted ₹16.0 L | L1 | Accepted-AOC Award |
| 2 | L2₹16.4 LRejected-Finance | ₹16.4 L | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹19.0 LRejected-Finance HIMACHAL PRADESH HP | ₹19.0 L | L3 | Rejected-Finance Other than Lowest |
| 4 | L4₹19.3 LRejected-Finance | ₹19.3 L | L4 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | GULZARI LAL L3 | KARTIK MAHAJAN L2 | Raj Kumar Prop R.K. Construction L1 | Tehal Dass L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work.chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge. | 3.38 | Cum | 425 ₹1,436.50 | 350 ₹1,183 | 350 ₹1,183 | 450 ₹1,521 |
| 2.00 | Boulder filling dry hand packed tightly under floor in all leads and lifts as per entire satisfaction of Engineer-in-Charge. | 0.23 | Cum | 1,600 ₹368 | 2,000 ₹460 | 1,550 ₹356.50 | 1,700 ₹391 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts | 0.45 | Cum | 6,690 ₹3,010.50 | 7,000 ₹3,150 | 6,600 ₹2,970 | 6,700 ₹3,015 |
| 4.00 | Steel reinforcement for R.C.C. work includ straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts. | 202.8 | Kg | 93 ₹18,860.40 | 125 ₹25,350 | 90 ₹18,252 | 95 ₹19,266 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Foundations, footings, bases of columns, etc. for | 9 | Sqm | 280 ₹2,520 | 275 ₹2,475 | 250 ₹2,250 | 300 ₹2,700 |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | 3.38 | Cum | 8,300 ₹28,054 | 8,300 ₹28,054 | 8,000 ₹27,040 | 8,400 ₹28,392 |
| 7.00 | Steel work welded in built up sections/ framed work, GI Sheet 3.15mm thick, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (i) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works complete in all respect. | 4,855.81 | Kg | 375 ₹18.2 L | 320 ₹15.5 L | 313 ₹15.2 L | 382 ₹18.5 L |
| 8.00 | Steel work welded in built up sections/framedwork, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (i) in stringers, treads, landingsetc. of stair cases, including use of chequered plate wherever required, all complete. | 141.88 | Kg | 168 ₹23,835.84 | 170 ₹24,119.60 | 170 ₹24,119.60 | 170 ₹24,119.60 |
Tender Value
₹18.8 L
EMD Value
₹37,600
Closing Date
14 Apr 2026, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
Raising of Wet Well by Providing and installing GI Sheets and construction of stair case for wetwell at Bhiuli
2026_HPIPH_133598_1
671-770
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹37,600
18 May 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
14 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work.chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge. | - | Cum | - | - | |
Boulder filling dry hand packed tightly under floor in all leads and lifts as per entire satisfaction of Engineer-in-Charge. | - | Cum | - | - | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts | - | Cum | - | - | |
Steel reinforcement for R.C.C. work includ straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts. | - | Kg | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Foundations, footings, bases of columns, etc. for | - | Sqm | - | - | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | - | Cum | - | - | |
Steel work welded in built up sections/ framed work, GI Sheet 3.15mm thick, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (i) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works complete in all respect. | - | Kg | - | - | |
Steel work welded in built up sections/framedwork, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (i) in stringers, treads, landingsetc. of stair cases, including use of chequered plate wherever required, all complete. | - | Kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Form8.pdf
Tender Documents • 1.13 MB
Form6.pdf
Tender Documents • 0.67 MB
BOQ_197497.xls
BOQ • 0.24 MB