EXECUTIVE ENGINEER, MEHSANA ELECTRICAL (R&B) DIVISION, MEHSANA
Providing Lift for court Building Jotana (G+1) at Jotana, Dist : Mehsana (8/10 person capacity
349240
06/04 OF 2026/2027
Open
Electrical
Works
Mehsana
11 documents required · 11 mandatory
₹900
Executive Engineer, Mehsana Electrical (R&B) Division, Mehsana
₹15,000
28 Sept 2026
28 Sept 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
Tender Document & Technical Bid
Name of Work : Providing Lift For Court Building Jotana
(G+1 ) at Jotana, Dist-Mehsana. (8/10 Person Capacity)
Invited by: Opened by:
Executive Engineer, Executive Engineer,
Mehsana Electrical Division, Mehsana Electrical Division,
M.s Building , Block No.1, Third M.s Building , Block No.1, Third
Floor Mehsana Floor Mehsana
Name of Work : Providing Lift For Court Building Jotana (G+1 )
at Jotana, Dist-Mehsana. (8/10 Person Capacity)
Tender Document & Technical Bid
No. Description Page No.
1 Information & Instructions for Tenderers
2 Time Schedule
3 Declaration Form
4 Memorandum of Tender For work
5 Form of Tender for Electrical Works R&B Department
6 General Condition of Work
7 General Condition of Contract
8 Special Condition of Contract
9 Detailed Technical Specification
10 Features of Lift
11 Scope of work covered under All in Comprehensive Service Contract
12 Maintenance of Lift
13 Annexure – A : Bank Guarantee Form ( EMD)
14 Annexure – B : Bank Guarantee Form (Security Deposit)
15 Annexure – C : Performance Bond
16 Annexure – D : Model Form of Warranty Clause
INFORMATION & INSTRUCTIONS FOR TENDERERS
1.0 Mode of Submitting Tender:
The tenders shall be submitted in Electronic format only on online Web-site
www.nprocure.com till the date & time shown in Details Notice Inviting On-
Offers in Physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate (Class-III) as per Information
Technology Act-2000 using which they can sign their electronic bids. Bidders
can procure the same from any of the license certifying Authority of India are
as mentioned under :
Sr. No. Name of Certifying Agency Website Address
1. (n) Code solution (G.N.F.C) www.gnvfc.com
2. Safecrypt www.safescrypt.com
3. TCS www.tcs.-ca.tcs.co.in
4. MTNL www.mtnltrustline.com
2.0 Competency of Tenderer:
No contract will be awarded except to responsible bidders capable of
performing the class of work contemplated. Before the award of the contract,
any bidder may be required to show that he has the necessary facilities,
experience, ability and financial resources to perform the work in satisfactory
manner within the time stipulated. Tender may be required to frnish the tender
inviting authority with the statements as to their experience and their financial
status. Tenderer shall be a original manufacturer of Lifts.
3.0 Tenderer to inform Himself:
Tenderer will be deemed to have inspected the site and to have satisfied
himself as to the nature of all works, all existing roads, water-way and other
means of communication and access to and from the site and work and the
building that may be required for temporary purpose in connection with the
construction, completion and maintenance of the works and must make his
own inquiries as to work, yard sites and depot, and dumps and as to
acquisition of such additional sites, rates and areas as may be necessary for
temporary purpose for constructing, completing and maintaining the works
and availability of water for construction activities, power, quarries and
4.0 Late / Delayed physical receipt of tender fee, EMD & other documents
After online submission of tender, tender fee, EMD & other documents should
reach the office of tender opening authority within time and last date stipulated
for the purpose in any of the modes of physical submission, the same is
received early or later than the time Specified will not be accepted in any case,
their bid will not be opened online and will be considered NON-
5.0 Payment - The tenderer must understand clearly that the rates quoted are for
completed works and include all costs due to labour, scaffolding plant,
supervision, service work, power, royalties and octroi etc. and to include all
extras to cover the cost of night work if and when required and no claim for
additional payment beyond the price/rates quoted will be entertained and the
tenderers will not be entitled subsequently to make any claim on the ground of
misrepresentation or on the ground that he was supplied with information
given by any person (whether the member is the employee of Public Works
Department or not). Any failure on his part to obtain all necessary information
for the purpose of making his tender and filling the several prices and rates
therein shall not relieve him from any risks or liabilities arising out of or
consequent upon the submission of the tender.
6.0 Tender Forms - This form will state work to be carried out as well as the date
of submitting and opening tenders and the time allowed for carrying out the
work, also the amount of earnest money to be deposited with the tender and
the amount of the security deposit to be paid by the successful tenderer and
percentage, if any, to be deducted from bill.It will also state whether a refund
of Quarry Fees, Royalties, Octroi dues and ground rents will be granted.
Copies of the specifications, designs and dawings and estimated rates, and any
other documents required in connection with work which shall be signed by
the Executive Engineer for the purpose of identification shall also be open for
inspection by Contractor at the office of the Executive Engineer during office
hours. However every 'blank' in the form of the e-tender and in the Schedule
and Annexures must be filled up by the tenderer and must be submitted online.
7.0 Quoting of Rates :-
The Tenderer shall quote the rate per unit for all items listed in Schedule-B in
figures as well as in words. Thereafter the system will work out the total
amount of each item in Column No.7 of Schedule-B and sum up the total at
the end of column No.7 on each page and on last page of Schedule-B. After
striking the total of all items, he may give rebate if he desires on the total
amount so worked out and thereafter express in the figures, as the net amount
of his offer which will be termed as "Tendered Amount"
The following rule shall apply only to the works having estimated cost
above Rs.100 lacs (Rupees One Hundred lacs) (G.R. R&B.D No. TNC-
1777-281-C, dated 30-7-1992 may be referred to)
(a) Tenderes are normally not permitted to suggest any alteration in the works
specified in the tender form or in the time allowed for carrying out the work or
any other conditions of any soft. However, if it is felt necessary by the
tenderer to have any conditions, he shall have to clearly mention the same in
very clear terms in the appropriate section of technical bid. The tenderer will
have to fill in necessary details online in 'technical bid' and 'price-bid'
separately. No such tender shall include more than one work but contractors
who wish to tender for two or more works shall submit a separate tender or
each work online.
(b) If price-bid contains any conditions, the same shall be rejected outright.
(c) It should be very clearly understood by all the tenderers that the technical bid
should be restricted only to technical matters and conditions / stipulations
having financial implications. The technical and price bids shall contain
adequate cross reference wherever necessary to ensure clear and proper
correlation of them with two bids without any ambiguity whatsoever. The
price bid of main tender should not be disclosed in the technical bid.
(d) The Pre - Qualification bid will be opened first online on specified day or any
other suitable time thereafter by the competent tender opening authority of the
Government. The technical bid, tenderers who qualified in Pre – Qualification
Bid, will be opened online on same day or any other suitable time thereafter
by the competent tender opening authority of the Government. Bidders who
wish may remain present. The technical bid shall be evaluated first and
wanting details, if any and clarifications in respect of conditions if any will be
called from the tenderers. In such case, the contractor will be required to
submit clarification/ details (including with respect to conditions if any) within
the stipulated time allowed for the purpose. If the contractor does not furnish
the wanting details / clarification in time, his tender would be liable for
(e) The conditions specified in technical bid should invariably be accompanied by
proper financial evaluation with mode of calculation specifying assumptions,
quantities, rate and ceiling amounts for each condition and shall also
accompany the information in the form stating
(b) Description of the condition
(c) Financial evaluation (Vide R&B.D. G.R.No. TNC/7777/281-C, dated 30-9-
(d) Ceiling amount to be added in price-bid, in case condition is not accepted.
(f) Ceiling amounts shall be binding on the contractors and are liable to be added
to the tender amount.
(g) The evaluation as given by the contractor as modified by tender opening
authority with the ceiling limit will then be intimated to all the bidders. No
further opportunity shall be given to the contractors to modify/ withdraw
conditions at that stage. After completion of evaluation of the technical bid in
all respects the competent authority will decide about date of opening of price
bid and the same will be intimated to the bidders. After opening of price bid
and their evaluation the tender inviting authority reserves the right to negotiate
about the tender(s) further will any or all the contractors.
8.0 Earnest Money :-
Earnest money in specified form @ 1% of the estimated cost must be sent
electronically. Tenderer may pay earnest money up to Rs.50.00 in the form of
Crossed Demand Draft or fixed deposit or fixed deposit at call receipts with a
validity period of not less than six months of Nationalized or Scheduled blank
or Narmada/ Shrinidhi F.D.Rs drawn in favour of Executive Engineer,
Electrical (R&B) Division, Mehsana. Earnest money by Cash, Cheque & Bank
Guarantee shall not be accepted. (vide R&B.D. G.R.No. TNC/ 1090/ (100)
(4)-C, dated 4-11-2000). However, in case of tenderer is a member of IEEMA,
Earnest Money may be submitted in the form of Bank Guarantee of
Nationalized or Scheduled Bank. However, in respect of the works estimated
to cost above Rs.50 lacs, the amount of earnest money in excess of Rs.50,000
can be offered by the contractor, at his choice, in the form of in the following
form. In such cases also, the amount of earnest money first Rs.50,000 will be
paid only in the form of crossed demand drafts or fixed deposit receipts or
deposit at call receipts worth the validity period of not less than 6 months of
the nationalized or scheduled or Narmada/ Shrinidhi F.D.Rs.
The Contractors who have secured exemption certificate for payment of
earnest money by depositing Lump Sum Earnest money Deposit need not pay
earnest money, but produce the certified copy of the exemption certificate
along with the tender.
If the contractor does not turn up to pay the Security Deposit and execute
contract agreement within specified (or extended) time after intimation to him
about acceptance of his offer, the earnest money paid for this work will be
forfeited and according to Clause-1 of this tender form tenderer's tender shall
be rejected and then according to aforesaid provision of tender, action to
blacklist the Contractor will be initiated without Delay. (Vide R & B D G.R.
8.2 The Earnest Money submitted in the form of deposit-At-call receipt shall need
minimum validity of six months from the last date of online submission of
tender. Tender not supported with tender fee. Earnest Money & documents
and not submitted in electronic format (by scanning) while uploading the bid
shall be rejected as NON Responsive. If the tenderer modifies or withdraws
his tender, the Earnest Money (in case of EMD exemption certificate,
proportionate amount equivalent to EMD of particular tender) shall be
forfeited and the tenderer may be disqualified from tendering for future works
under the Government.
8.3 The Earnest Money will be returned to the unsuccessful tenderers. The Earnest
Money will be returned to the successful tenderer after he furnishes security
deposit and duly enters into the contract.
8.4 Within Ten days or within such time as may be decided by the Tender Inviting
Authority from date of receipt of the letter accepting his tender, the successful
tenderer shall furnish the required security deposit and attend the office of the
Tender Inviting Authority for execution of the contract documents. If he fails
to furnish the security deposit or execute the contract document, his Earnest
Money (in case of EMD exemption certificate equivalent amount there from)
shall be forfeited and action to blacklist the contractor will be initiated without
delay (Vide R&B.D. G.R.No. Misc. 1097-90-1091-97-Z/ C dated4-10-97)
9.0 Accompaniments of Tender : (to be submitted in electronic format only
through on line (by scanning) as duly certified true copies)
The contractor shall have to furnish:
(i) Copy of Partnership Deed or Memorandum as well as Articles of Association
in case of the company and intimate permanent addresses of his partners/
Directors of Company. All copies submitted shall be duly attested.
(ii) Copies of certificate regarding previous experience, as required.
(iii) Declaration showing all works completed during preceding 5 years and works
on hand with the Contractor and the value of woks that remained to be
executed in each case.
(iv) A certificate of Registration as approved contractor of prescribed category
from authorities stipulated in Notice Inviting Tenders.
(v) P.A.N. issued by Income-Tax Department.
(vi) Copy of Provident Fund Registration – Code No.
(vii) Duly filled in and digitally signed declaration form & Memorandum of Work
as provided in Tender Documents.
(viii) A solvency certificate of an amount equal to 20 per cent of the amount of
work put to tender will have to be produced. Such solvency certificate should
be issued by either Scheduled bank or Nationalized bank.
(ix) Required Annexures duly filled in when pre-qualification in involved.
(x) All above documents are to be submitted in electronic format only as part
of tender document failing which the tender will be rejected outright and
will be considered as NON-RESPONSIVE.
10.0 Tender liable to be Invalid:
It may please be noted that the tender is liable to be considered invalid
especially, if the requirements as per Instruction No. (i) to (ix) above are not
11.0 Right of rejection of tenders.
(i) Right is reserved by the Tender Inviting Authority to reject any or all tender(s)
without assigning any reason thereof.
(ii) In addition to the above, the tender will also be liable to be rejected outright if:
(a) The tenderer proposes any alteration in the work specified or in the
time allowed for carrying out the work or in any condition.
(b) The tenderer or in the case of a firm, each partner or the person holding
the power of attorney thereof does not digitally sign Memorandum of
Work or signature/s is/are not attested by a witness.
(c) Any person who submits & tender shall fill forms online including the
rates of items put to tender. No single tender shall include more than
one work but contractors who wish to tender for two or more works
shall submit a separate tender for each work online.
12.0 Method of Tendering:-
12.1 If the tender is made by an individual, it shall be digitally signed by the
individual above his full name and current address.
12.2 If the tender is made by a proprietary firm, it shall be digitally signed by the
proprietor above his full name and the full name of his firm with its current
12.3 If the tender is made by a firm of partnership, it shall be digitally signed by a
Partner of the firm holding the power of attorney and digital certificate for the
firm. A certified copy of the power of attorney shall be provided in physical
form along with other documents. A certificated copy of the partnership deed,
full name and current address of the firm and full name and the current
addresses of all the partners of the firm shall also be provided along with other
12.4 If the tender is made by a limited company or a limited corporation, it shall be
digitally signed by duly authorized person holding digital certificate for the
company/ corporation and power of attorney for signing the tender in which
documents. Such limited Company or Corporation may be required to furnish
satisfactory evidence of its existence before the contract is awarded.
12.5 All digital signatures in the tender documents shall be dated.
13.0 Eligibility and qualification requirement.
To establish acceptability of the satisfaction of Tender Inviting Authority the
tenderer shall provide the following :
13.1 Details of plant and machinery immediately available with tenderer for use on
13.2 Details of plant and machinery proposed to be procured for the works.
13.3 Details of technical, supervisory and administrative personnel already
employed by the tenderer that the proposes to utilize for this work and such
other personnel he proposes to employ further for the work.
13.4 Copies of registration certificate and P.A.N. allotted by income Tax Office.
13.5 Separate Notes in sufficient details on each of the following :
(i) Method and technique of construction
(ii) Sequence of execution of various important components of the work;
(iii) Cash-flow arrangement
14.0 Deviation or modifications In Tender Documents:
14.1 All tenderers are cautioned that tender containing any condition and/or
deviation from the contractual terms and conditions, specifications, quoting/
offering rates/ prices in different manner than specified in the tender and/or
any other requirements of tender shall make the tender liable for outright
rejection and shall be considered as non-responsive for all practical purposes.
The decision of the Tender inviting authority in this regard shall be final and
binding to the tenderer.
14.2 Alternative tenders are not acceptable.
15.0 Submission of tender
15.1 Tender shall be submitted in an online manner only on website
www.rnb.nprocure.com
Last date & time of online submission as specified in Details Notice Inviting
On-Line Tender.
15.2 Tender fee, EMD and other documents should be submitted in electronic
format only through on line (by scanning) while uploading the bid. However
for the purpose of realization of D.D. / F.D.R. the bidder shall send the D.D. /
F.D.R. in original through R.P.A.D. or Speed Post, So as to reach the office of
Tender Inviting Authority within 7 (Seven) days counted from the stipulated
last date of receiving of the tenders online for this wok.
16.0 Evaluation of Tenders
16.1 Technical evaluation will be made of the tenderer's proposed method and
technique of construction, construction programmer, sequence of components
of the work, proposed resources assigned to do the work to determine the
acceptability, adequacy and reasonability of rates, his past performance and
present resourcefulness.
16.2 To assist in the examination, evaluation and comparison of tender, the tender
inviting authority may ask tenderer individually for clarification of their
tenders including breakdown of unit rates. The request for clarification and
response shall be in writing but no change in substance of the tender shall be
sought, offered or permitted at that stage.
16.3 Award may be made to the tenderer whose responsive tender is determined to
be the lowest evaluated tender and who meets the appropriate standards of
capacity and financial resources.
17.0 Receipt of Payments:
Receipt of payment made on account of any work, when executed by a firm
shall be signed by all the partners except where the contractors are described
in their tender as firm in which case the receipt shall be signed in the name of
the firm by one of the partners or by some other person having authority to
give effectual receipts for the firm.
18.0 Opening of tenders:
The Authorized Officer / competent authority shall open tender online on
website www.rnb.nprocure.com on specified day or any other suitable time
thereafter, in his office in the presence of intending Tenderers or their
representative who wish to remain present at that time. He will enter the
amount of the tenders in a comparative statement in a suitable form. In the
event of a tender being accepted, the contractor shall, thereupon for the
purpose of identification, sign copies of the specifications and other
documents mentioned in his tender.
19.0 General rules and directions:
19.1 No receipt for any payment made by a Contractor will be entertained by the
Government in regard to any matter relating to this tender or the contract shall
be valid and binding on the Employer unless it is signed by the Authorized
staff members of the Government.
19.2 All works shall be measured net by standard measure and according to the
rules and customs of the R & B Department or any other method approved by
the R & B Department without reference to any local custom. The
measurements of work will be taken according to the usual method in use in
the Roads & Buildings Department and no proposal to adopt alternative
method will be accepted. The Executive Engineer's decision as to what is the
usual method in use the Roads & Building department will be final.
19.3 Under no circumstance shall any Contractor be entitled to claim enhanced rate
for any item in this contract except as provided in contract conditions.
19.4 The contractor shall not be permitted to tender for the work in which his near
relative is working as the office in the sphere of his jurisdiction in the Tender
inviting authority.
Note:- By term "near relative" is meant wife, husband, parents, children,
brothers, sisters, uncles, aunts, consigns, and in laws.
19.5 The contractor should compulsorily furnish his latest address(es) including the
latest address of his partners and the place(s) of filing his/their income-tax
returns along with the tender. Any changes, in such addresses, during the
tenure of contract should invariably and forthwith be intimated by the
Contractor to the Executive Engineer.
20.0 Submission of additional information / documents:
In addition to various specified documents and information required to be
submitted along with tender, the bidder may be required to provide any other
document/ relevant information as considered necessary by the tender inviting
authority and the tenderer shall be required to provide the same as per the
requirement of the tender inviting authority. Even the successful bidder may
be required to provide the same as and when required by the authority during
subsistence of the contract.
Wherever the word "Bank" is used in the document, it would mean Schedule
or Nationalized Bank only. (R&B.D. G.R.No. TNC/ 1090/ 100-(4) (C) dated
22.0 Tender validity period
The tender for the work shall remain open for a period of 120 days counted
from the stipulated last date of receiving of the tenders online for this wok.
23.0 The successful contractor shall exhibit the board in prominent place of
worksite showing the brief deails of project work under execution, financier,
cost of work and broad details of inputs/ specifications and targeted goals.
24.0 The contractor will not use the premises of project/ work under construction
for his staff, labourers or for any other purpose. If he do so, market rent for
such unauthorized used will be recovered. The marker rent will be decided by
the Engineer-in-charge.
The Machine Room & Hoist way are ready.
The installation work of Lift may be taken up on hand immediately.
The Time Schedule is as under.
(a) For Preparation and Approval of Drawing 10 Days
(b) For Manufacturing, Erection, Final Testing & Remaining
Commissioning of Lift Period
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
DECLARATION FORM
The tenderer will have to make declaration enlisted in the form attached herewith and
shall affix his signature to the form in token of correctness of declaration made therein
(G.R. R&B.D. No. TNC-IIB-22 (10)-C dated 24-5-90 should be referred to)
1. I/We hereby declare that I/we have visited the site and fully acquainted
myself/ourselves with the local situations regarding materials, labour and other
factors pertaining to the work before submitting this tender.
2. I/We hereby declare that I/We have carefully studied the conditions of
contract, specifications and other documents of this work and agree for
execute the same accordingly.
3. We agree to receive payments, if delay is due to late receipt of grant -in-aid
from Government for panchayat works. (Applicable to panchayat works only)
DECLARATION CERTIFICATE (G. R. date 4-2-89 as revised by GR.
4. I/We hereby declare that my/our near relative are not working in this Division
or in its sub-division as an Ex. Engineer, Deputy Executive Engineer,
Assistant Engineer, Additional Assistant Engineer, overseer, Divisional
Accountant, Store Keeper, Manager of Atithi / Vishram Gruha and in the
circle as a Superintending Engineer in addition for Panchayat works not
working nor having posting as chairman of P.W. committee or as incumbent in
Jilla Panchayat at today.
Place : (Digital Signature of the Contractor with
MEMORANDUM OF TENDER FOR WORKS
I/We hereby tender for the execution of the work specified in the underwritten
memorandum for the Government of Gujarat (hereinbefore and hereinafter referred to
as the Government) at the tendered rates specified by me/ us in Schedule showing
items and rates of works to be carried out and in accordance in all respects with the
specifications, designs, drawings and instructions in writing referred to in this tender
and in clauses of the annexed conditions.
1. General Description of work (If it includes sub works, the details thereof will be
given Separately):
Name of Work : Providing Lift For Court Building Jotana (G+1 ) at
Jotana, Dist-Mehsana. (8/10 Person Capacity)
2. Estimated Cost ……… Rs.
3. Earnest Money … 1% Rs
5. Security Deposit 5% Rs.
6. Additional performance security … Rs.
(i) In the form of small
savings or Narmada Bonds
(of minimum one year time limit)… 2.5% Rs. -
(ii) To be deducted from bills … 2.5% Rs. -
(iii) Performance bond of Schedule bank… 5% Rs.
* Vide R&B.D. G.R. No. TNC – 1088 – 1B/ 1 (13)/ C dated 4-5-1983 & revised vide
5. Time Limit : 3 months from the date of workorder .
Deposit furnished in the form of interest bearing documents as per item 4 (i) can
further be extended for renewal if so desired and communicated by the contractor in
writing before one month from the date expiry date. Similarly cash Deposit deducts as
the item No.4 (ii) can also be converted into interest bearing fixed term securities of
schedule and Nationalised Banks. If so desired and communicated by the contractor in
Should this tender to accepted, I/We hereby agree to abide by and fulfill all the terms
and provisions of the conditions of the contract annexed here to so far as applicable
and in default thereof to forfeit and pay to Government in office the sums of money
mentioned in the said conditions.
(Receipt No. dated from the Government Treasury
or Sub-Treasury at in respect of sum Rs.*
is forwarded herewith representing the earnest money + (a) the full of value of which
is to be absolutely forfeited to Government should I/We not deposit the full amount of
security deposit specified in the above memorandum in accordance with Clause I of
the said conditions, otherwise the said sum of above Rs. shall be
Place:- * Digital Signature of the Contractor
** Signature of the Contractor
(Witness) *** (At the time of execution of contract document)
Name and address
* Digital Signature of Contractor before submission of tender
** Signature of the Contractor of the time of execution of contract document.
*** Signature of witness to Contractor's signature at the time of execution of contract
The above tender is hereby accepted by me on behalf of the Government of Gujarat
Dated the day of
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
FORM OF TENDER FOR ELECTRICAL WORKS
R & B Department
I/We do hereby tender to execute the whole of the work of
Providing Lift For Court Building Jotana (G+1 ) at Jotana, Dist-
Mehsana. (8/10 Person Capacity)
1. Described in the accompanying tender for the case of measured works, at the
several rates, set forth in the tender hereto attached and signed by me/us and
should this tender be accepted. I/we further undertake to complete the work
within the time stated below reckoned for the date of acceptance of tender.
2. I/We do agree and bind myself / ourselves to abide by and fulfill the general
conditions of contract and Special Conditions of contract annexed to the
Specification or in default thereof to pay to the purchaser, as reasonable
compensation for such breach of such conditions, the sums of money
mentioned in the said conditions.
3. I/We do further agree to make good at my/ our expense all defect in the
installation which appear within 12 (Twelve) months from the date bringing
the installation into beneficial use when such defects are due to defective
workmanship or material executed or supplied by me/us.
Dated at: The_____ Day of ___________
The above tender is hereby accepted by me for and on behalf of the Governor of
Dated at: The_____ Day of ___________
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
FORM OF TENDER FOR ELECTRICAL WORKS
R & B Department
1. I/We do hereby tender to execute the whole of the work of Providing Lift For
Court Building Jotana (G+1 ) at Jotana, Dist-Mehsana. (8/10 Person
Capacity) Described in the accompanying tender the case of
measured works, at the several rates, set forth in the tender hereto
attached and signed by me/us and should this tender be accepted.
I/we further undertake to complete the work within the time stated
below reckoned for the date of acceptance of tender.
2. I/We do agree and bind myself / ourselves to abide by and fulfill the general
conditions of contract and Special Conditions of contract annexed to the
Specification or in default thereof to pay to the purchaser, as reasonable
compensation for such breach of such conditions, the sums of money
mentioned in the said conditions.
3. I/We do further agree to make good at my/ our expense all defect in the
installation which appear within 12 (Twelve) months from the date bringing
the installation into beneficial use when such defects are due to defective
workmanship or material executed or supplied by me/us.
Dated at: The_____ Day of ___________
The above tender is hereby accepted by me for and on behalf of the Governor of
Dated at: The_____ Day of ___________
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
GENERAL CONDITIONS OF WORK
1) The work of the Electrical Installation shall be carried out as per IS
Specifications IS 732 – Code Part I, II & III – 1982 of practice of Electrical
wiring and fitting in building.
i) For Hospital I. S. 7732 of
ii) For Educational Installation I. S. 108941 –
iii) For Aluminum Conductor I. S. 398 – 1984 Part III
2) The fitting should be fixed with mild steel hooks to be supplied and erected
and duly grounded in the cement concrete by the contractor where ever
possible the decision of the Executive Engineer, in respect of the feasibility of
providing such hooks in the cement concrete, shall be final and binding on the
3) The work shall have to be completed within the prescribed time limit unless
the extension in the time limit at the instance and the request of the contractor
is granted by the authorities in which case, the application for the extension in
time limit have to made by the contractors by registered post before the date of
expiry of the schedule time limit under the agreement.
4) Materials required for the work shall be supplied to the contractor as per rates
mentioned in the Schedule ‘A’ attached herewith and cost of materials will be
recovered from their bills.
5) The several documents forming the contract are the essential parts of the
contract and requirement occurring in one is as binding as through occurring
in all, they are intended to be mutually explanatory and complementary and to
describe and provide for a complete work.
6) In the event of any discrepancy the several documents forming the contract or
in any one documents the following order of precedence should apply.
(a) Dimension and quantities :
(ii) Schedule ‘B’ of the tender form
(iii) Specification.
On drawing figures, dimension unless obvious in contact will be followed in
preference to sealed dimension.
(b) Description :
(i) Schedule B of the tender form
(iii) Specification.
In case of defective description or an ambiguity the Executive Engineer in
charge should issue further instructions directing in what manner the work is
to be carried out is being understood that the last modern practice is to be
followed. The contractor should forthwith comply with such instruction.
The Contractor should take no advantage if any apparent error,
omission in drawings or a specification and the Executive Engineer in charge
should be permitted to make fulfill the intent of the pans and specifications.
7) Controlled materials (Essentiality certificate)
(i) As regards ’Controlled materials’, the R&B Department will help to
arrange for the permits as far as possible and hold the contractor in
securing the same. All incidental charge in procuring these materials
shall be borne by the contractor himself. Though the R&B Department
will help to arrange for the permit as far as possible and help the
contractor in obtaining the materials, it shall not be accept any
responsibility for any delay or loss on account of delay caused to the
contractor while obtaining the same.
(ii) The Contractor shall submit the monthly returns in the prescribed form
as to receipts and actual use of the controlled materials during the
month to the Executive Engineer of every calendar month.
(iii) The Contractor shall submit the Executive Engineer or his
representative to inspect the stock of the controlled ma by him at any
time whenever the Executive Engineer or representative so desires.
8) The tender for the work shall remain open for a period of 90 days (Ninety
days) from the date of opening of tenders for the works. The offer having
validity less than 90 days will be rejected outright. The tenderer will not be
allowed to withdraw or modify the offer on his/their own during the course of
finalization of tender.
9) The Contractor shall employ only such labourers who shall produce a valid
certificate of having been vaccinated against small pox within a period of last
10) The Contractor shall provide drinking water facilities to the workers, labourers
to comply with the provisions, the Engineer In charge shall give notice for such
facility to the workers labourers within a period of ten days from the date of the
notice in writing the Engineer In charge shall there upon make the arrangement
for the drinking water at the cost of the contractor.
(Govt. Resolution PWD No. TNC-2171 (I) 76-C Dt.4.7.73)
11) Earnest Money Deposit should be accompanying with tender. Tenderer may pay
earnest money in the from of CROSSED Demand Draft for Fixed Deposit
receipt or in form of bank Guarantee in case of tenderer is member of only
IEEMA, DEPOSIT at Call receipts of nationalized or Schedule Bank, drawn in
favour of Executive Engineer, Mehsana.Electrical (R&B) Division, Mehsana.
Earnest money in cash or by cheque(s) shall not be accepted.
12) Wires of I. S. I. Mark will be allowed to be use on the work.
13) The rates should be written both in words and figures, inclusive of all taxes and
14) The percentage additions in total amount tendered of any items is not allowed,
14) The percentage additions in total amount tendered of any items is not allowed,
however, if overall reduction in percentage is offered, the same should be stated
in prescribed clause added at the end of Schedule B in words and figures. If no
reduction is to be made, the gap should be filled in by the words ‘NIL’.
(Govt Resolution No. CDN/1269/PAC/51-C Date: 15/04/1978)
15) Whatever secured advance has been granted the contractor should provide
necessary sign board indicating the fact of hypothecation of the materials to the
Government and exhibited the same publicly prominently.
(Govt. in P.W.D. Reso. No. PWD-2675-1B-905-66-C Dt.30-11-77)
The contractor should give a written undertaking while applying for the grant of
secured advance in case of the agreement indenture bond already prescribed to
the effect that he has not taken or caused to be taken any advance on the same
materials or any financing institution like Bank etc. by hypothecating or
pledging the materials.
(Govt. Reso. No.PWD/2675-B/905/66-C Dt. 30-11-77.)
In case of granting secured advance for more than Rs.50,000/- the material
brought on site shall be 100% checked by Executive Engineer.
Contractors shall have to produce the purchase Bill / Invoice Delivery Challan
with Bank Guarantee for the amount of secured advance along with the secured
advance application. The Sub-Divisional Officer will verify all the documents.
(Govt. Reso. No. PWM-1090/UO-13/()/S Dt. 4-10-77)
16) Whenever Government materials are issued, the contractor shall be responsible
for the safe custody and proper use of the materials.
17) Loose electric fitting should be done connected at the time of handing over
possession of building to concerned civil or administrative department and
accordingly after taking over possession of these connections concerned
Civil/Administrative department is responsible for fittings.
GENEREAL CONDITIONS OF CONTRACT
1. Definition of terms
In constructing these general conditions and the annexed specification the
following works shall have the meaning here assigned to them unless there is
something in the subject or context inconsistent with such constructions:
The GOVERNER OF GUJARAT shall include his successors and assigns.
The ENGINEER shall mean the Executive Engineer, Electrical (R & B)
Division, Mehsana for the time being attached to Public Works Department of
the Gujarat State or such other officer as may be appointed by the Executive
Engineer, Mehsana.Electrical (R & B) Division, Mehsana to supervise the
work on behalf of Governor of Gujarat.
The CONTRACTOR shall mean the Tenderer whose tender, shall be accepted
by the Governor of Gujarat, and shall include the tenderer’s legal personal,
representatives or successors and assigns.
PLANT shall mean and include on machine, fixed or movable used for the
generation or transmission of power or accreted by power.
WORK or WORKS shall mean the whole of the plant and material to be
provided and work to be done executed or carried out by contractor under the
The CONTRACT shall mean all the documents by which the agreement by
the contractor to be provided to execute or carry out the plant work or works
shall be constituted or by which the terms of such agreement or any of them
are contained or set forth specially as per these General conditions, any special
conditions attached to or issued, with these conditions, the specification the
Drawings, the invitation for tenders (if any) or any other letter, notice or
documents upon or with reference to which the Tender is made and the
schedule of prices (if any) furnished by the contractor with his Tender.
The SPECIFICATION shall mean the specification annexed to these General
conditions and Schedule there to (if any).
The SITE shall mean the whole of the premises, building and ground in or
upon which the Plant work or works is or are to be provided, executed, erected
done or carried out.
The DRAWINGS shall mean the drawings issued with the specification which
will ordinarily be identified by being signed by the Engineer and any further
drawing submitted by the contractor with his tender and duly signed by him
and accepted or approved by the Engineer and all other drawings supplied or
furnished by the contractor or by the Engineer in accordance with these
General conditions.
The SPECIAL CONDITIONS shall mean the special condition of contract (if
any) attached to general conditions.
The SCHEDULE shall mean the schedule or schedules attached to the
specifications.
2. Contractor to inform himself fully
The contractor shall be deemed to have carefully examined the invitation for
Tenders (if any) the general and any special conditions, the specification and
Drawing and Schedule of price (if any). Incase of discordance or want of
agreement between or amongst the several things herein described as the
grounds or data of contact, then these conditions shall have precedence of and
be held to be more correct and binding than the specification or any conditions
refereed to therein, or in any other documents forming the part of contract and
in like manner detailed drawings shall be held to be more correct, and binding
than general drawings and instruction shall be held to be more correct and
binding than general drawing and instruction shall be held to be more correct
and binding then figured dimensions shall be held to be more correct than
dimensions by scale but subject nevertheless, in case of doubt o dispute as to
any of the matters aforesaid to the determination and decision of Engineer as
hereinafter is more particularly mentioned and provided always that nothing
herein contained shall limit the powers of the Engineer herein after mentioned.
3. Security Deposit
The contractor shall within ten days of the intimation, to him acceptance of a
tender, deposit a sum equal to five percent of the amount put to tender as
security for the performance of the contact. This deposit shall be in cash, if the
amount dose not exceeds Rs.500.00 and if the amount exceeds Rs.500.00, the
amount equal to 2.5% in the form of small saving or Narmada Bond endorsed
as may be required by the Engineer, of the same market value at date of
deposit as the amount fixed and the balance 2.5% shall be recovered from R.
A. bills at 5 % of each bill subject to limit of 2.5% of the tender amount. All
damages consist, charges, expenses and other sums which may become due or
payable by the contractor to the Governor of Gujarat under the terms of the
contract may be deducted from the cash or paid out of the proceeds of sales of
the securities so deposited (which the officer or person to whom the same may
be endorsed as aforesaid is authorized to sell for that purpose) or from the
interest of any such securities or from any sum due or which may become due
to him by the Governor of Gujarat the whole of the balance unapplied to
aforesaid of the cash or securities so deposited being repaid or transferred and
returned as the case may be to the contractor at the end of the period of
maintenance provided by clause 16 of these conditions. In the event of any and
on the occasion of every such deduction or sale and payment as aforesaid the
contractor shall forthwith make up in cash or such securities as after said the
deficiency thereby occasional in the said security deposit. In case of those
bidders, who are members of IEEMA, the bank guarantee (Annexure - B) will
be accepted. In addition to the security deposit as above, where the estimate
cost is more than 15 lakh the agency shall have to furnish performance bond
equivalent to 5 % of the tender cost, in the prescribed form (Annexure - C)
duly supported by the F. D. R. or unconditional Bank Guarantee of a Schedule
Commercial Bank in favour of the Executive Engineer, Electrical R & B Dn.,
4. Mistake in Contractor’s Drawings.
The contractor shall be submit such drawing as may be required and shall be
responsible for any discrepancies, errors or omissions in any drawing of other
particulars supplied by him not with standing that such drawing or particulars
may have been approved by Engineer.
5. Patent Right etc.
The contractor shall fully indemnify the Governor of Gujarat against all
actions, suits, claims, demands, costs, charges and expenses arising from or
incurred by reason of any infringement or alleged infringement, of any letters
patent, design, trade mark or name copyright or other protected rights in
respect of any machine, plant, work materials thing or system or method of
using, fixing, working or arrangement used or fixed or supplied by the
contractor but this indemnity shall not extend or apply to any action, suit,
claim, demand, cost charges, or expenses arising from or incurred by reason of
the use of the work or any part thereof otherwise than in the manner or for a
purpose contemplated by the contract. All royalties and other similar
payments which may have to be paid for the use of any machine, plant, work,
material, thing, system, or method as aforesaid (Whether payable in one sum
or by installments or otherwise) shall be covered by the contract price and
payable by the contractor.
In the event of any claim or demand being made or action or suit brought
against the Governor of Gujarat in respect of any such matter or matters as all
negotiations for the settlement of such claim or demand and such action
aforesaid the contractor shall be duly notified, thereof, and he shall conduct or
suit also be conducted by him subject if and so far as the Governor of Gujarat
shall think proper under the Supervision & Control of Governor of Gujarat
through the officer duly authorized on his behalf.
6. Sub-letting of Contract
The contractor shall not without the consent in writing of the Governor of
Gujarat under the hand of the Engineer assign or sublet the contract nor make
any sub contract with any person or persons for the execution of any portion of
the work other than for materials, or for any part of the work of which the
manufacturers are named on has contract.
7. Workmanship and Materials
The work shall be carried out in all respects with workmanship and materials
of the best and most substantial and approved qualities to the entire
satisfaction of the Engineer who may reject any plant, apparatus of material or
workmanship which shall in his opinion be of defective quality and such
rejection to be final and conclusive. The Contractor shall at his own expenses
provide all material, labour, haulage, power, tools, tackles and apparatus
necessary to execute and complete the works and plant in the manner
8. Use of Work Pending Completion.
The Governor of Gujarat shall be al liberty at any time to put into beneficial
use the whole or any part of the work he may desire to use pending the formal
completion and taking over of the same.
9. Power to vary or omit work.
9.1 The Engineer shall have full power, subject to the provision next hereinafter
contained, from time to time before the works have been taken over by notice
in writing to order the contractor to alter, amend, omit, and to or otherwise
vary any work, and any such order shall be without prejudice to the liability of
the contractor under the contract and the contractor shall carry out any
alterations, amendments, omissions, additions or variations so ordered and he
be bound in carrying them out by the same conditions (as far as possible) as
though the said alternations, amendments, omissions, additions or variations,
so ordered as aforesaid shall be difference of cost (if any) occasioned by any
alternations, amendments shall be, added to or deducted from the contract
price, as the case may require. The amount of such difference (if any) shall
subject to the provision hereinafter contained be ascertained and determined in
accordance with rates specified in the schedule of price, so far as the same
shall be applicable, but the Governor of Gujarat shall not become liable for
payment of any change in respect of any such alternations, amendments,
omission, additions or variations unless the order of instructions for the
performance of the same shall have been given in writing by the Engineer.
9.2 (a)Tender rates shall apply for excess up to a maximum of 30% over the
(b) For excess any, beyond 30%, payment shall be made as per mutually agreed
rates. However, the agency will furnish the conclusive evidence of the rates of the
involved components of exceeding items prevailing on the date of
commencement of erection of that item, and the rate prevailing on the date of
exceeding excess.
In the event of any order being under the powers made conferred by this clause
reasonable and proper allowances shall be made in time for any delay occasioned
thereby and in money for any plant or materials already prepared or work done and
requiring to be altered in consequence thereof.
10. Protection and Liability for Accidents, Theft and Damage
The contractor shall at all times until the commencement of period maintain
property a sufficiently cover up and protect all materials delivered on site from
damage or injury by exposure to the weather and shall take every proper
precaution against accident, damage or injury to the same from any cause. The
contractor shall be and remain answerable and liable for all accident and
damage thereto which until the commencement of the period of maintenance
may arise or be occasioned by the acts or omissions of the contractor or his
workmen, agents, servants or sub-contractors and all losses and damages
arising from such accidents, damage, or injuries as aforesaid shall be made
good in the most complete and substantial manner by and at sole cost of the
contractor and to the satisfaction of the Engineer.
Provided that should the Engineer certify that the work has been completed
but that owning to circumstances over which the contractor has no control the
work cannot be taken over the contractor shall not be held liable for any loss
of or damage to the work occasioned by such delay in taking over and
occurring more than One Month after date of completion of the work as
certified by the Engineer.
Until the work shall be or deemed to taken over as hereinafter provided the
contractor shall also indemnify to Governor of Gujarat from and against all
claims and demands, suits, proceedings, cost and expenses in respect of or in
connection with any injury to person or damage to property by whom so ever
sustained or by defective design work or materials made done furnished or
supplied by the contractor. The contractor shall also be responsible for thefts
of any property of the Governor of Gujarat or of others committed by any
employees of his own or his subcontractors and shall be liable for the costs of
replacing any property stolen.
Subject as hereinafter provided the contractor shall at his own expense insure
and at all times prior to the commencement of the period of maintenance keep
insured against destruction or damage by fire or earthquake storm and tempest
such plant and materials ordered for the work as may for the time being be
upon the site for the full value of such plant and materials.
12. Materials brought on the site
All materials, tools and tackle brought to and delivered upon the site for the
purpose of the work shall from the time of their being so brought vest in and
be the property of the Governor of Gujarat but may be used for the purpose of
the work but for that purpose only and not on any account be removed or
taken away by the contractor or any other person without the express
permission in writing of the Engineer, but the contractor shall nevertheless
(subject as hereinafter provided) be solely liable and responsible for any loss
or destruction thereof or damage there to unless resulting from causes beyond
the contractor’s control not being causes insurance against destruction or
damage from which is provided for in clause 11. The Governor of Gujarat
shall have a lien on such materials, tools and tackle for any sum which may to
any time prior to the completion of the works be due or owing to him by the
contractor under in respect of or by reason of the contract and shall be at
liberty to sell and dispose of any of such materials, tools and tackle remaining
after the completion of the works in such manner as he shall think fit, and to
apply the proceeds in or towards the satisfaction of such sum or sums so due
or owing as aforesaid but subject to such lien and power of sale and disposal
such surplus materials, tools and tackle shall being to the contractor and may
be removed and disposed of by him as he shall think fit after the lien is
withdrawn by the Engineer in charge.
If the contractor shall at any time fail in the opinion of the Engineer to proceed
with the work with due diligence and expedition, or shall refuse, neglect or
omit to comply with any orders given to him in writing by the Engineer in
accordance with the provisions of these conditions or shall commit any other
breach of the provision of the contract, the Engineer shall be at liberty to give
notice in writing to the contractor to make good the failure neglect, omission
or breach of contract and should the contractor fail to comply with any such
notice within such period as may be prescribed in such period as may be
prescribed in such notice then and in such case the Governor of Gujarat shall
be at liberty to employ workmen other than those of the contractor to perform
and execute the work in respect of which the failure, neglect or omission
referred to in such notice shall have been committed or occurred. If the
Governor of Gujarat shall be think fit, It shall be lawful for him to enter into a
new contract with any other persons, or person, for the execution of such part
of the work as may not have been executed and in that event the Governor of
Gujarat shall without incurring any liability to the contractor be entitled to use
all or any of the materials, tools, tackle or other things which may then be on
site for the purpose of completing the work or any part thereof and to provide
any additional materials tools, or tackle required for the provide any additional
materials tools, or tackle required for the purpose and the cost of executing
any such work and providing any such materials shall be paid by the
contractor to the Governor of Gujarat on demand.
Subject to and after satisfaction of the lien of the Governor of Gujarat for any
sum due to him by the contractor for any expenses, cost or charges incurred in
the completion of the work all materials, tools, tackle or other things
remaining on the site and unsold after such completion shall forthwith
hereafter be removed by contractor.
14. Replacement of Defective work of material.
If during the progress of the work, the Engineer shall notify in writing to the
contractor that in his opinion the contractor has executed any unsound or has
supplied any material inferior in quality to those stipulated for by the
contractor, the contractor shall at his own expense, within ten days of his
receiving the notice, proceed with due expedition to remove or alter and
reconstruct or replace the work, or as the case may be supplied fresh materials
up to the standard of the specification. In place of the work or materials
complained of by the notice (as the case may be) and in case the contractor
shall fail to do so the Governor of Gujarat may after the expiration of ten days
from the giving of such notice in writing stating that the Governor of Gujarat
intention so to do forthwith at the cost of the contractor remove the work or
materials complained of and perform all such work or (as the case may be)
supply all such materials in place of those complained of any such removed
and performance of work or supply of materials shall be paid by the
contractor to the Governor of Gujarat on demand, provided always that
nothing in this clause shall be deemed to deprived the Governor of Gujarat or
effect any other right or remedies under the contract or otherwise which he
may have in respect of such defects or deficiencies. No payment which have
been made on account of materials delivered or work executed shall be looked
on as acceptance of such or any work or materials.
15. Cutting away and making good
The tender is to include all necessary cutting and making good for the purpose
of the contract of the wood work, walls, floors, etc. of the site. The contractor
will be held responsible for, and will have to make good at his own expenses,
to the satisfaction of the Engineer, any damages to or disfigurement of the site
which may have been caused by the acts or omissions of himself or his
servants or agents in connection with the carrying out of the contract.
16. Contractor’s Representative and Workmen.
The contractor shall employ at least one competent representative whose name
or names shall have previously been communicated in writing to the Engineer
by the Contractor to superintend the carrying out the works. The said
representative, or if more than one shall be employed then, one if such,
representatives, shall always be present on the site during working hours and
any written orders or instructions which the Engineer may give to the said
representative of contractor, shall be deemed to have been given to the
The Engineer shall be at liberty to object to any representative or person
employed by the contractor in the execution of or otherwise about the work,
who, in the Engineers opinion shall misconduct himself or be incompetent or
negligent and the contractor shall remove every person so objected to
forthwith upon receipt from the Engineer of notice in writing requiring him to
17. A Minimum age of persons employed and employment of donkeys or
(i) The contractor shall not employ any person who is under the age of 18 years.
(ii) The contractor shall not employ donkeys or other animals with breaching of
string or thin rope. The breaching must be at least three inches side and should
be of tape (Nawar).
(iii) No animal suffering from sores, lameness or emaciation or which is immature
shall be employed on the work.
(iv) If contractor does not accept the preceding conditions nos. (i), (ii) & (iii) his
tender shall not be accepted and his name shall be removed from the list of
(v) The Engineer shall remove from the work any person or animal found working
which does not satisfy these conditions and to responsibility shall be accepted
by the Governor of Gujarat for any delay caused in the completion of the work
by such removal.
18. SUBMISSION OF SAMPLES
The contractor shall not without written sanction of Engineer use for the
execution of the work any materials plant or stores of any type of description
other than those specified in his tender. He shall, if required to do so, or at his
options, deposit samples, at the office of the Engineer of approval and the
Engineer shall within 14 days of the receipt of the samples, express in writing
to the contractor his approval or otherwise of the samples deposited, and all
materials, plant and stores used in the execution of the work must be in every
way equal to the deposited samples. All the deposited samples will be returned
to the contractor within one month of the work being taken over.
19. DEDUCTIION FROM CONTRACT PRICE
The amount or all costs or works, expenses or other sums which under the
contract shall be payable by the contractor to the Governor of Gujarat from
any moneys due or becoming due by him to the contractor under contract,
without prejudice to the Governor of Gujarat, right to recover the same by the
ordinary process of law.
20. TERMS OF PAYMENT
Subject to any deduction which the Governor of Gujarat may be authorized to
make under the contract, the contractor shall be entitled upon the certificate of
the Engineer to the effect hereinafter stated payments of R.A. Bills shall be
made to the contractor as per items, in measurable units executed according to
the specifications. The payment shall be made as per the following: and
subject to availability of Fund/Grant.
Terms and Conditions
1. 75% of the cost of materials brought to the sites. (The details of the cost of
materials shall have to be furnished by the Agency on prorate basis, and) shall
be restricted to maximum 80% of the contact value.
2. Balance amount on account of the cost of material and 15% of the contract
value shall be paid after the satisfactory installation, testing and
commissioning of the Lifts.
3. Balance amount of 5% of the contract value shall be paid to the contractor
after satisfactory running of the Lifts up to 2 months from the date of handling
over the Lift to the department.
21. Certificate of Engineers
Every application to the Engineer for a certificate must be accompanied by a
detailed claim (in duplicate) setting forth (in the order of the Schedule for
price, if any) particulars of the plant or materials delivered and work executed
to the date of the claim, and the certificate as to such of the plant and work
mentioned in the claim as is in the opinion of the Engineer in accordance with
the contract shall be issued within 14 days of the application. No application
for a certificate shall be made within 14 days of previous applications.
22. Certificate not to affect rights of the Governor of Gujarat or
The Engineer may by any certificate make any correction or modification in
any certificate previously issued by him; any payment shall be regulated and
adjusted accordingly. No certificate of the Engineer shall nor shall any
payments on account by the Governor of Gujarat to the Contractor, Nor
extension of time for the execution of the works by the contractor which may
be granted by or on behalf of the Governor of Gujarat against the contractor
under or relieve him any of his obligations for or in respect of the due
performance of the contract, or be interpreted as approval of work done or of
material supplied.
23. Suspension of Work
The Governor of Gujarat shall pay to the contractor all proper expenses arising
from suspension of the works, by order in writing of the Engineer or any other
officer on behalf of the Governor of Gujarat unless such suspension is due to
some default on the part of the contractor or any sub- contractor under him.
24. Damages for delay in completion.
If the contractor fails to complete the work under contract by the stipulated
date, he shall pay liquidated damages of Rs. 0.1 % of the contract value per
day from the date of delaying the said work up to the date of completion and
handing over to the Government.
As corrected vide B & C D GR No. TNC – 1091 – 1B –10 /(11) – C
The aggregate maximum of liquidated damages payable under clause No.2
shall not exceed Rs. 0.1 percentage of contract value per day and shall be
subject to the maximum amount of ten percent of the estimated amount put to
Delays requiring payment of ten percent liquidated damages of the amount put
to tender for performance shall be sufficient cause for termination of contract
and for forfeiture of security deposit including amount of performance bond in
respect of works estimated to cost more than Rs. 15 lacs for performance and
registration of the contractor shall also be kept in abeyance for three years
from the date as fixed in all cases.
25. (a) If the contractor shall desire and extension of the time for completion
of work on the ground of his having been unavoidably hindered in it execution
or on any other ground he shall apply in writing to the Executive Engineer
before the expiration of the period stipulated in the tender of before expiration
of 30 days from the date on which he was hindered as aforesaid on with the
cause for making for extension occurred whichever is earlier and the
Executive Engineer may if in his opinion, there are reasonable and bonfire
grounds for granting an extension, grant such extension as he thinks necessary
or proper. The decision of the Executive Engineer in this matter shall be final.
No applications for extension of time for completion of work shall be
considered unless it is received by registered post in the office of the Executive
Engineer or left at his office and obtained receipt thereof duly signed by the
Executive Engineer or his nominee authorized in this respect.
The date of receipt of application by the Executive Engineer shall be
considered as the date of application for the purpose of counting the period as
mentioned above.
(b) If the contractor or his workmen, or servants shall break, deface, injure or
destroy and part of the building or the work in question in/or which they may
be working or any building, road, fence, enclosure or glass land or cultivated
ground contingencies to the premises on which the work or any part thereof is
being executed or if any damage shall be done to the work from any cause
whatever before completion of the work or before the completion of the
maintenance period whichever is later or any damages occurred/caused due to
normal flood or rain or if any imperfection become apparent in it within three
months from the grant of a certificate of completion, final or otherwise by the
Engineer-in-Charge shall be final the contractor shall make good the same at
his own expense or in default the Engineer –in-charge may cause the same to
be made good by other contractor and deduct expenses (of which the
certificates of the Engineer-in-charge shall be final) from any sums that may
then be due or may thereafter become due to the contractor or from his
security deposit or the proceeds of sale thereof a sufficient portion thereof.
(c) Force Major Clause: However, neither party shall be liable to the other
for any loss damage occasioned / caused by or arising out of acts of God, and
in particular. Unprecedented floods, volcanic eruption, earthquake or other
conclusion of nature and other acts such as but restricted to invasion, the act of
foreign countries hostilities or warlike operation before or after declaration of
rebellion military or usurped power which prevent performance of the contract
and which could not have been foreseen or avoided by a prudent person.
NOTE: Unprecedented Flood means the flood crossing the high flood level of
the Past year(s) which is on the available record.
26. Time of taking over
The work shall for the purpose of all provisions of these conditions be deemed
to have been completed and taken over by the Governor of Gujarat when the
Engineer, shall have certified in writing that it has been completed in
accordance with contract conditions and such certificate shall not be
unreasonably withheld nor shall the Engineer delay kits issue on account of
commissions or defects which in his opinion do not effect the efficient use of
the work, but such issue shall be without prejudice to the contractor’s liability
to make good any such omissions and defects with the greatest possible
27. Death & Bankruptcy. :- If the contractor shall die, or become insolvent or
bankrupt or have a receiving order made against him nor compound with or
make any proposal carrying on his business under inspection or for the benefit
of his creditors, or commit an act of insolvency or bankruptcy, or being a
corporation be ordered to be wound up or to the contractor his legal
representative to determine the contract and the Governor of Gujarat may in
that event complete the contract in such time and manner and by such person
as he shall think fit.
28. Settlement of Disputes:- All the disputes regarding the Contract shall be
subject to settlement by Gujarat P.W. contract dispute Arbitration Tribunal.
29. Contract Drawings: The contractor shall submit to the Engineer for his
approval on or before the dates stipulated for this purpose in the specification
copies of all the drawings of the general arrangements of the plant as set out
therein and of such detailed drawings as may be reasonably necessary.
Within 14 days from the receipt by him of such copies or in absence of such
notification within 30 days from the receipt of such copies, the copies in ink or
tracing cloth or Ferro Gallic prints mounted on cloth, of all drawings as
approved shall be supplied to the engineer by the contractor respectively and
shall thereupon the signed by the contractor and become the property of the
Governor of Gujarat. Such signed copies of the drawing shall not be departed
from in any way whatsoever except with the written permission of the
Engineer. During the execution of the work, the signed copies shall always be
kept available for reference on the site.
In the event of the contractor desiring to keep in his own possession a signed
copy of the drawings approved, he shall supply three copies instead of two and
in this case the Engineer shall sign the third copy and return the same to the
30. Manner of Execution, Quality of Materials, etc.:-The plant shall be
manufactured, constructed, provided, put in position and maintained in the
best and most substantial and workmen like manner and materials of the best
and approved qualities having regard to their respective uses.
31. Tests on Site :- In all cases where the special conditions are provided for tests
on the site whether of plant, materials or workman ship the Governor of
Gujarat except where otherwise specifically stipulated shall provide free of
charge such labor, materials, fuel, stores, apparatus & instruments as may be
requisitioned from time to time efficiently to carry out such tests in accordance
with the conditions.
Where electrical energy is required for tests on site and a supply is
available on the site from an existing installation, such electrical energy
shall be supplied to the contractor by the Government free of charge at the
pressure and frequency of the ordinary supply is available. The electrical
energy necessary for such tests shall be provided to the contractor.
All the Testing Charges will be born by the Agency, and it will not be
32. Delivery of Lifts and materials:- No plant and materials shall be
tendered for delivery until and intimation in writing shall have been given to
the contractor by the Engineer that Governor of Gujarat is ready to take
33. Tests on Completion:- On the completion of the works on the site in
accordance with the contract the contractor shall give the Engineer notice in
writing of such completion. The Engineer shall after receipt of such notice, by
notice in writing under his hand for date and an hour on that date for the
making of the test on site if any such are provided for the contract.
The contractor shall carry out such tests upon the date and at the hour so fixed
and if the Engineer or his authorized representative shall attend on that date at
that hour such test shall be carried out in the presence of the Engineer or such
representative.
If any portion of the plant fails under the tests to satisfy the contract conditions
similar test according to the contract of the portion so failing shall if required
by the Engineer or by the contractor be repeated within a time to be fixed by
the Engineer and the provision of this clause shall apply to such repeat 20 test
as if they were the original tests and the contractor shall pay to the Governor
of Gujarat all reasonable expenses to which may be put by such tests.
If the tests or any repeated test so required as aforesaid be not made by the
contractor on the date fixed as aforesaid for the same by the Engineer may
proceed to make such test himself at the contractor’s risk and expense.
If in any test under this clause the plant tested shall fail to satisfy the contract
conditions the Governor of Gujarat shall as from the date stipulated by the
contract for completion nevertheless have the right of using such plant until
the same shall satisfy such conditions and such use shall be at the contractor’s
risk. In the event of the question whether the works have been completed in
accordance with the contract or any question regarding such completion being
submitted to Arbitration as any portion of the plant, the Engineer may certify
to be capable of being used on conditions of paying to the contractor a sum
calculated (according to the period or the use) at the rate of 5% per annum
upon the amount withheld or deducted in respect of such plant.
34. Rejection of Defective Work
If the works, or any portion thereof shall not in the opinion of the Engineer on
the stipulated tests (if any) being made in accordance with the contract satisfy
the contract conditions within three months after the date stipulated for
completion the Engineer may give notice in writing to the contractor setting
for the particular of the defects of particulars in respect of which the works in
his opinion fails to comply with the contract conditions and requiring the
contractor to make good, after or replace the same within such time to be
specified in the notice as the Engineer may consider reasonable and the
contractor shall make good, alter or replace the same as required by such
notice and so as to make it employ with the requirements of the contract
conditions with the time so specified. Should he fail to do so, within that time
the Governor of Gujarat may make good, alter or replace the same as so
required and the cost of such making alteration good or replacement (less in
the case of any replacement any sum which would have become due to the
contractor under the contract in respect of the works replaced and which shall
not have been paid to him) shall be paid by the contractor to the Governor of
Gujarat on demand or should the Governor of Gujarat not make good, alter or
replace any defective works in respect of which such notice as aforesaid shall
be given within six weeks from the date of the given of such notice the
contractor shall repay to the Governor of Gujarat all sums (if any) paid by him
to the contractor in respect of such works. Nothing contained in this clause
shall prejudice or affect the rights of the Governor of Gujarat under the
contract whether in the way of enforcement of penalties or otherwise in
respect of any delay in the completion of this work.
35. Use of plant of works pending making good.
If at expiration of the time specified for making good, altering or replacing the
plant of works, in any notice given by the Engineer to the contractor under the
last preceding clause the contractor shall not have duly made good, altered or
replaced the same in accordance with the contract the Governor of Gujarat
shall be at liberty if he things fit to make use of the same for such time as shall
be reasonably sufficient according to the circumstances to enable him, to make
good, alter or replace the same (whichever he made see fit to do ) provided
that in respect of the period of such user, the Governor of Gujarat shall not be
entitled to any damages under clause 24 of these conditions an in the case of
complete replacement, the contractor shall be entitled to be paid in reasonable
sum for the same.
36. Workman’s Compensation in case of injury
The contractor shall be responsible for any compensation and shall pay to his
workmen, compensation payable for injuries under, the workmen’s
Compensation Act, 1923 (VII OF 1923) hereinafter called the said Act. If such
compensation it shall be recoverable by Government from the contractor under
sub section (2) of the said section such compensation shall be recovered in the
manner laid down in clause 3 and 10 of the conditions of contract.
37. The Apprentices
The contractor shall afford or procure as the case may be every facility to
Indian apprentices of practical training in the factory, owned, managed,
controlled or patronized by them, so as to enable the Indian Apprentices to
acquire full knowledge of the technique and work of their trade industry
calling or profession.
38. Set-off Clause
Any sums of money due to the contractor (including the security deposit
returnable to the contractor) under this contract shall be appropriated by the
Govt. and shall be set off against any claim of the Govt. for the payment of
sum of a money arising out of or under any other contract made by the
contractor with the Govt. when no such amount for purpose of the recovery
from the contractor against such any claim of govt. is available a recovery
shall be made from the contractor as arrears of land revenue.
39. Appointment of Local Labourers.
The contractor should as far as possible obtain the requirement of labourers,
skilled and unskilled from the nearest employment exchange, so as to utilize
the local employment potential. If there are no local employment exchange or
such exchanges are not able to provide required locally suitable local labour
should be utilized to maximum extent possible.
If a contractor fails to pay within 7 days to the labourer(s), worker(s) the
minimum wages Act, 1949 as in force from time to time the Executive
Engineer or the officer of a equal rank shall be at liberty to deduct the amount
payable to the labourer(s), Worker(s) from contractor's bill or deposit(s)
payable by the contractor after making due inquiries and shall not be entitled
to any payment or compensation on account of any loss that he (contractor)
may have to incur of the action as aforesaid. Before the action as aforesaid is
enforced notice is writing to the contractor shall be issued by the Executive
Engineer or the Officer of the equal rank to pay the wages as per Minimum
Wages Act in force at the relevant time. If the contractor does not act as
aforesaid with 7 days then the action contemplated as above shall be taken
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
SPECIAL CONDITIONS OF CONTRACT
(A) Scope of Work
To provide necessary scaffolding in each elevator hoist way required during
the erection period and carry out minor builder’s work comprising of cutting
in walls, floors, partitions together with any repairs made necessary thereby
including grouting of all bolts, steel members, indicator and button boxes in
position of the elevator equipment.
The contractor shall also provide fascia plates between two landing doors,
doors posts (as required) machine beams, bearing plates, buffer support
channels, hitch beams, hitch plates and the stretcher angles (wherever hoist
way dimensions are in excess of what is required) at their cost and also erect
the same, where required.
Contractor shall also carry out necessary wiring work pertaining to elevator
equipment so also provide the light outlet in the pit and hoist way from the
main switches provided in the machine room.
Living accommodation for the erections shall also be provided by the lift
(1) Furnishing Technical Data
The necessary data regarding the hoist way and machine room details and
dimensions and such other technical information may be obtained by the
successful tenderers from the Sub Division concerned to prepare detailed
layout drawings and to shed with the performance of the contract.
(2) Submission of the Preliminary and final Layout Drawings.
The contractor shall submit to the department the final layout drawing within
3 (Three) Weeks from the date of receipt of work order.
(3) Approval to Drawings.
The layout drawing will be returned to the contractor/s within 3 (Three) Week
from the date of submission thereof.
(4) Free Maintenance
The contractor shall provide free maintenance service for the period of
12 Months from the date of handing over of the lift installation, covered under
this contract for beneficial use.
The contractor shall take materials –cum – erection risk insurance policy
under which the materials should be covered from the time they are dispatched
from the factory till the elevator is installed and handed over. The contractor
should also take the third party compensation insurance policy to cover their
employs working at the site.
The rates should be quoted inclusive of delivery of materials to the site,
fabrication and installation of the lift equipment, and commissioning and
testing, of the lift, inclusive of all taxes, Excise duty, Octroi, and all other
imposts. The tenderer should clearly indicate the imposts and taxes as
applicable at present at their present rates, i.e. on the date of submission of
tender documents.
The contractor/s shall undertake and complete the installation work of lift as
specified in Time Schedule.
(8) Deviations and Technical Information
For all items offered against Schedule ‘B’ for each tender item separately.
The tenderers may give their offer based on their own design without effecting
the cage carrying capacity, Speed of the lift shall be 1.0 MPS, type of
machine, A.C.V.V.F control, operation, type of car and hoist-way, door and
door operations specified in Schedule ‘B’ of tender documents, however, the
deviation in technical specifications shall be brought out clearly as to what
respect the same defers from technical specifications shall be brought out
clearly as to what respect the same defers from technical specifications
appended with the tender documents, stating technical as well as financial /
commercial implications thereof from the specified.
(9) The contractor shall have enter in to 15 Years, all in maintenance service
contract with the department. Scope of work under All in Comprehensive
Maintenance and Service Contract is shown ahead separately. All in
Comprehensive Maintenance and Service Contract will start from the date of
expiry of free maintenance period of 12 Months. The tenderer shall have to
quote year wise rate in amount.
(10) No price escalation shall be given.
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
DETAILED TECHNICAL SPECIFICATION
The A.C. Motor designed for elevator service will have high starting torque with low
starting current, suitable for existing machine.
Micro Processor Based Controller
It is technologically advanced system. The operational card file contains a logic board
with microprocessor chip, random access memory (RAM) and erasable programmable
read only memory (EPROM) chips to monitor and take over the command of the
The Motion controlled consist of high performance, fully digital control V.F. drive
which the directly control the torque and speed of the elevator motor and thus
provides constant speed control under all loads conditions.
A large numbers of user friendly features are included in the microprocessor based
controller such as:
1. Detection stuck hall button
2. Motor over current protection (Built in inverter drive)
3. Fast speed / Deceleration protection
4. Passenger over load warning device/ optional
The system continuously monitors critical aspect of system health. Self health
diagnostic capabilities are built in to the control system to speed up trouble shutting
and can be monitored from seven segments display provided in the logic board. This
facilitates quick identification of fault and restoration to normal operation.
1.0 AUTOMATIC MICRO SELF LEVELLING:
For achieving accurate leveling at the floor the Lift should be provided with
the Micro Self Leveling Features. This Micro self leveling should, within its
zone, be entirely automatic and independent of the operating device and
should correct for over travel, under travel and rope stretch automatically. The
leveling in-accuracy should not exceed 12 mm irrespective of the load. Re-
traveling of car should not be possible with open doors.
2.0 OPERATION: A.C. Variable voltage variable frequency:
2.1 GROUP OPERATION:
Both elevators should work as a group so that when a floor button is pressed
for either up or down direction the nearest lift approaching that floor and
traveling in the required direction should automatically stop irrespective of the
sequence in which the floor buttons were pressed. Similarly, in response to car
call the stops will be made automatically in succession as car reaches these
floor irrespective of the sequence in which the car buttons were pressed.
2.2 MEMORY SYSTEM:
The system should have memory so that the calls once registered should not
get cancelled until it is attended to.
2.3 ATTENDENT OPERATION:
It should be possible to have with/without attendant operation.
2.4 FIREMAN SWITCH:
A key switch (or toggle switch in break glass) should be provided at ground
floor for each lift so that in emergency, the fireman can assume the complete
control of the required lift.
2.5 SEPARATE CAR AND HALL DOOR HOLD OPEN TIME:
Separate adjustable timers should be provided to establish minimum transfer
time for car and floor stops, the floor stop time being longer then the car stop
time to allow person waiting to leave and enter the car. It should be possible to
adjust the transfer time of ground floor separately from the time for normal
2.6 DIRECTION REVERSAL:
When a lift arrives at a floor where both the up and down floor calls have been
registered and no calls is registered in the car, in the direction in which the lift
is not to travel then the car door should close, floor lantern should reverse and
then the car door should re-open again, so that passengers traveling in the
opposite direction can make that lift. In other words, the lift should not travel
for one more floors before reversing the travel direction.
2.7 ADVANCE INTIMATION:
At the main lobby, there should be advance illumination of the up signals for
the lift which is going to be first dispatched. Similarly, for other floor when
the lift reaches, a predetermined distance from the floor where it is going to
stop the corresponding direction signals should be illuminated and going
should sound. This will facilitate the passengers to enter the lift with watering
3.0 CONTROLLER:
3.1 The relays and switches to use should be suitably designed for lift control
3.2 The relays should be so mounted that they are visible for quick location of
faults and easy maintenance.
3.3 The contacts should be self wiping type.
3.4 Without dismantling the relay from controller body, it should be possible to
adjust the air gap between the contacts.
3.5 When required, it should be possible to replace the contact alone.
3.6 Proper identification marking should be provided on contacts relays and
3.7 In the event of spring failure, gravity switch should get released the relay.
3.8 The main power contact should be copper, to carbon type.
3.9 All the wiring of controller should be terminated in terminal block fitted on
the controller body.
3.10 A controller disconnect switch should be provided on the controller.
3.11 Suitable arc blowers and arc deflectors should be provided for main power
3.12 A reserve phase relay should be provided to protect the equipment against
phase reversal, low voltage and phase failure.
3.13 For easy maintenance and fault finding the wiring shall be distributed in
different zones with indicators.
The floor stop switches should not be installed in the shaft but the same should
be mounted on a selector located in the machine room.
Equipment offered should conform and comply with Indian Standard
Specification, Bombay Lift Act. as applicable to Gujarat State Indian
Electricity Rules and their relevant specifications and standards.
6.0 TEST CERTIFICATE
6.1 It will be necessary for the supplier to furnish the certificate in
regard to the items such as Machine, Motor, Motor Generator Set, Ropes,
Safeties, Controller, Selector, Governors, Buffers etc.
6.2 There should be minimum 6 ropes of ½” diameter with 8 x 9 seal construction
as per IS : 2365 of
6.3 The hoist ropes should be attached to the car and counter weight by means of
spring fastenings to reduce stopping jerks.
6.4 The ropes are to be fitted in forged steel thimble rod to give strong and reliable
7.0 ARD: Automatic rescue device and its equipment like batteries and parts are
in scope of AMC.
8.0 ELETRIC WIRING:
All necessary wiring in lift duct should be done in throughing for easy
9.0 COMPENSATING ROPES:
Each lift should be provided with compensating ropes to compensate for the
weight of the main rope.
Equipment offered should conform and comply with Indian Standard
Specification, Bombay Lift Act as applicable to Gujarat State Indian
Electricity Rules and their relevant specifications and standards.
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
FEEATURES OF THE LIFT
Name of Work : Providing Lift For Court Building Jotana (G+1 ) at Jotana,
Dist-Mehsana. (8/10 Person Capacity)
Sr. No. Particular of Lifts :
1 Type of Lift Service : Passenger Lift.
a. Number of Passengers 8/10 Passenger-01 Lift
b. Capacity in Kg
3 Rated Speed in Meter Per Second : 1.0 Mtr. / sec.
4 Total Travel in Meters :
5 Service to be provided : For 8/10 pass.(G+1)
6 Inside size of the lift well in mm : For 8-10 passenger (G+1)
(Width & Depth to be cleared)
7 Clear Inside size of the Lift Car : As per I.S.S.
8 Available Power Supply (Volts / Phase) : 440 V. 3 phase 50 Hz. A.C. Supply.
9 Type of Control : Microprocessor base with ACVVVF
drive. With close / open.
10 Type of Operation : Fully Collective
11 Car Entrance Door :
(a) Number, Size and type of Opening : Protected by 5 Nos Steel sliding doors
of Doors stainless steel finish with 1000mm x
(b) Operation (Manual / Automatic) :
12 Construction Design & Finish of Car : Stainless Steel Cage.18G Grade
13 Type of Signal System : Automatic.
14 Details of Landing Doors with : Door size as per IS standard
Numbers, Size & Type of the Doors telescopic sliding door.
15. Additional Items if Any : Single should be provided such as :-
1. Luminous buttons at all door.
2. Digital hall position at all floors.
3. Digital car position and
Direction in indicators in car
4. Car operation panel with
luminous buttons.
5. Battery operated alarm bell and
emergency light.
7. Over load warning indicator in
8. Rescue Device.
9. Floor Announcing System.
10. Overload Alarm System.
11. Infra red light curtain safety
screen for automatic door.
12. Special features as per sor
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
Scope of Work covered under
All in Comprehensive Maintenance & Service Contract
(1) Maintaining the Lift to keep the equipment properly adjusted and in proper
safe operating condition by regular and systematically examining, adjusting,
lubricating all parts / components, including warranted repairs of replacement
of machine, motor generator, controller and parts as required including worm
gears, thrust, bearings, break magnet coils or brake motors, brake shoes,
brushes, winding, commutators, rotating elements contacts, coils, resistance
for operating and motor circuits, magnet frames and other mechanical part due
to wear and tear, using only genuine and original parts (Manufactures invoice /
Mark on parts shall be the proof the party being genuine, use of in genuine
parts with incorrect invoice, marks will be considered as breach of contract.)
Mark of parts and components will be got approved, if the original figments of
manufacturer’s do not exit.
(2) Renewing guide shoes ribs or guides rails when necessary to ensure smooth
and quiet operation and to keep the guide rails properly lubricated.
(3) Renewing all wire ropes as often as necessary to maintain the adequate factor
of safety to equalize the tension on all hoisting ropes and repairing or
replacing conductor cable.
(4) Maintenance of car enclosure, removable panels, door panels, plenum
chambers, hung ceiling light diffusers, light tubes and bulbs, handrails, mirrors
and carpet, if any, hoist way enclosure, hoist way gates, doors, frames, hand
buttons, sills and batteries is not included in this contract. A printed price list
of these items published by the manufactures in this contract. A printed with
the offer and fresh price lists from time to time shall be furnished in advance
for approval and settlement of payments of these exclusive items of contract.
(5) Lubricating, servicing and checking of all components which should be done
minimum once in a month. The Executive Engineer/ Deputy Executive
Engineer/ Engineer-in-charge can call back the service of repairing crew any
time during the month, during regular working hours as well as during
overtime hours and it will be obligatory on the part of agency to respond
within 24 hours after registration / intimation of call back.
(6) Servicing, repairing and replacement of spare parts, etc. should be carried out
with the knowledge of authorized representative/s of Electrical Division and
his signature should be obtained in token of works carried out.
(7) Preventive repairs shall be attended to in a phased program and the Section
Officer In charge shall notify such maintenance closures to public.
(8) The contractor shall as far as possible, attend the call of the Engineer In charge
quickly for such of these items which are required to be done under the terms
of contract. If no response to attend the call is for the coming from the
contractor within 48 hours till the report undertaking the work, recovery
calculated on hourly rate basis for the service contract would be recovered
(9) The lifts under contracts should function satisfactorily for the entire period of
contract. The lift installation shall be inspected once in months by the Section
Engineer of the firm jointly with the Dy. Executive Engineer, Electrical
(R&B) Sub Division, Mehsana and suggestion and remedial measures to the
bottle-neck, if any, and for better functioning be sorted out. The lift working
days are considered as 300 days per year and stoppage on account of
maintenance and repairs are allowed at 15 days in a year. The liquidated
damages for closure for any more periods, than stipulated above shall be
recovered daily rated basis by dividing the annual contract price by 300 days.
50 % of yearly contract value will be paid every six months as down payment
against performance of bank guarantee of the amount equal to down payment
which will be settled against work done within six months. In event of failure
of attending repairs at any time, the work will be got done departmentally or
through another agency at his risk and cost, and the additional expenditure
incurred so, will be payable by the defaulter agency while making the payment
of remaining 50 % of contract value at the end of six months, the amount of
work done at the risk and cost shall be adjusted against work done for which
satisfactory maintenance is certified by the Deputy Executive Engineer In
charge. The bank guarantee shall be renewed year after year for the above said
amount till completion of the contract.
10. A log book will be maintained for each lift and the record of work done for
servicing, maintenance and repairs, etc. will be recorded there in jointly by the
contractor and Liftman In charge to keep track of periodical work done in each
lift. This will be considered basic record for all purpose for all purposes
including these specified in paras.
11. All Legal Liability in case of passenger trap in the elevator, insurance, fire
shall be covered in the all-in-service contract and hence no subsequent claim
in this regard shall be entertained.
12. Automatic rescue device and its other parts like batteries are in scope of
Comprehensive .maintenance.
The accepting authority or the Executive Engineer In-charge of the work
reserves the right to terminate and/or suspend the contract at any time after
giving 10 days prior notice of his intension to do so without assigning reasons
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
MAINTENANCE OF LIFT
The inspection and tests of the lifts should be performed by a qualified
Engineer, Who should be thoroughly acquainted with the mechanical and electrical
details of the lifts. Inspection of lifts should be carried out such month during which
time necessary oiling should be done and adjustment are made as per requirement.
Agency should inform the authorized person of this department the condition of the
lifts every month and thus given an opportunity of removing the defects before
damage is done to the equipment or accidents occur to the passengers.
1. Switches and Fuses
Check the size of the motor fuses and the setting of any circuit – breaker
should be checked against the nameplate rating of the motor.
In motors if plain bearings with ring lubricator are fitted, it should be noted
whether the oil is at the correct level and whether any leakage is occurring at
the drain plug, tap or oil gauge. Ball or roller bearings are packed with grease
by the makers, and replacement is only necessary about every six months,
where a little pure petroleum jelly should be used. Excessive wear of the
bearings can often be detected by a distinct knock and results in un-due strain
being placed on the coupling and the worm gear bearings.
The brake and the coupling upon which the brake are usually operated. The
coupling should be examined to ensure that the bolts are tight and that the keys
joining the shafts on each side are not loose. If the motor winding wheel is
inserted, and turned in each direction, looseness of the key on the motor shaft
can be detected. Similarly, the key on the worm shaft may be observed, but in
this case the brake must be released. Particular attention should be given to the
adjustment of the brake, as an incorrectly adjusted brake will cause faintly
floor leveling. When the design permits, each half should be adjusted
independently so that the clearances of both shoes are the same. The
clearances between the brake lining should be as small as possible, and will be
found in practice to be between 1/100” (0.25 mm & .4 mm), if correctly
adjusted. Next adjust the solenoid plunger so that the maximum possible pull
is obtained. This is the case when the maximum number of lines of force is
present in the air gap. Under these, conditions the brake should just operate
when the magnetic circuit closes. The spring pressure should then the adjusted
until smooth and rapid stopping is obtained, the actual stopping distance will
vary with the car speed. After the brake has set, the car travel should not
exceed about 4” (100 mm) for each 100 ft/min. (0.5 m/s.) of running speed.
The operation of any emergency brake
Examine the level of the oil in the gearbox which if the gear is of the under
type, the should be sufficiently high just to cover the worm. If the over-type
gear is employed, the level should be about 4” (100mm) above the bottom of
the worm wheel. The gear oil recommended by the makers should be used.
The oil should be free from metal particles and should not be semi solid,
gummy of have an offensive odour. The gear case should be examined for
leaks and tightened where necessary, and if the gland is showing signs of
leakage, the gland nuts should be tightened up in rotation. Wear of the gear
teeth can be detected by removing the gearbox cover and turning the motor by
hand. A double thrust race is usually fitted at the outer end of the work shaft to
accommodate the worm thrust in both directions of travel, and an inspection of
this thrust race is necessary to ensure that excessive wear has not taken place.
If undue wear is present, the thrust is likely to be transferred to the motor
bearings, which may overheat and cause a break-down. Wear may be
compensated for by removing the thrust and making adjustment.
5. Sheaves and Pulleys
The sheave or drum and any diverting pulleys should be examined to detect
whether any looseness on the shafts is present due to the keys working loose.
If looseness is present, the key should be driven in tightly, but it may be
necessary to fit a new key. With a traction drive, the sheave grooves should be
examined for wear and if-ridges are present in the grooves these may, in time
cause rope slip which will result in rope wear. The sheave seat to the same
depth in the grooves. The presence of a crack in the sheave, drum or diverting
pulleys may be detected by hammer testing. Test the bearing bolts for
The contacts on the controller are copper-to-carbon or copper to copper, and in
the latter case, if cleaning is necessary, care may be taken to ensure that any
“roll” incorporated in the designs is not reduced or destroyed. If this is done,
welding of the contactors may result. When an appreciable amount of cleaning
or filling of contacts is necessary the profile of the contacts should be tested
with a template having the same curvature as a new contact, before the
contacts are replaced. The mechanical interlock, between the reversing
contactors should be examined if such an interlock is fitted. The pins on which
the various contactors operated should be perfectly free and should
occasionally be given a drop of thin oil. Careful inspection of any controller
dashpots is necessary to ensure that they provide the time lags intended. It is
important to use only the type of dashpot oil recommended by the makers, or
the settings will become inaccurate. An electrical insulation test should be
taken on motor and control circuits at a voltage of 500 V D.C. and when taken
from the main switch with all coils in circuit should be less than 1 M. Ohm.
7. Floor Selector
After the brake has been correctly adjusted, an inspection may be made of the
floor selector gear if the lift is automatically controlled, and any necessary
adjustments made. The operation of each striker arm and its associated switch
should be examined to see whether the best possible leveling is obtained at
each floor. This adjustment will provide the best average leveling in the up
direction for all loads if the counterweight is equal to the weight of the car
plus 50% full load. Hence, with 50% full load, accurate leveling in the up
direction should be obtained. If, however, the counterweight is say equal to car
plus 40% full load, it will be necessary for the car load during the load
leveling test to be equal to 80% full load instead of full load. This will ensure
that correct leveling is obtained in the up direction with 40% full load in the
car. The strikers operating the down direction switches must be adjusted in a
similar manner to that for a switches, but with the car traveling in the down
direction. During these down direction tests it will be noted that the empty car
will again level high and the loaded car low. When a two speed motor is
employed, the floor selector will have slowing switches fitted for each
direction is addition to stopping switches. The slowing switch strikers should
be adjusted so that the lift speed is reduced to the low speed value before the
stopping switches are operated and the brake applied. If stopping and leveling
are performed by direction switches in the well and a cam is fitted on the car
instead of a floor selector in the motor room, it will be necessary, in order to
check the leveling to take measurements at the floors after stopping the lift at
each, floors when traveling up empty. Adjustments should be made to the
positions of the switches (except the ground floor switch) so that the stopping
distances above each floor are equal. Similarly, the position of the ground
floor switch should be adjusted until the stopping distances below each floor
are equal when the car travels down loaded. When the switches and cam have
been adjusted, the only reason for inaccurate floor leveling will be that the
brake is out of adjustment. It will probably be found more convenient to test
these direction switches, when fitted, after the motor room inspection has been
8. Final Terminal Stopping Switch
This should occasionally be tested by holding in the appropriate controller
contactors and allowing the car to operate the switch after over traveling each
terminal landing in turn. The final limit switch is usually operated by a striker
on the car engaging with a stop on the limit switch operating rope. One stop
being fitted for each terminal landing. The over-run, after passing the terminal
floor and before the limit switch operated, may be adjusted by altering the
position of the rope stop. Two plaint marks on the operating rope or pieces of
adhesive tape are after used to indicate that when the marks are opposite to
each other, the rope stops are in their correct position in the well.
The over speed governor must be lubricated where necessary and kept clean.
During inspection the weights should be operated by hand to see that firstly,
the control cut off switch operates and secondly, the governor gripping jaws
are released and grip the governor rope.
Before leaving the motor room a careful visual examination should be made of
those portions of the lifting ropes which pass over the sheave or drum during a
complete journey of the lift. Any “needling” of the ropes, i.e. broken wires,
should be carefully noted, the detection of these “needles” being greatly
facilitated by the aid of a small mirror used for the underside of the ropes or by
a way of cotton waste held lightly against the ropes. If performed ropes are
used, much greater care will be necessary in detecting broken wires as they
retain their original position in the strands even when fractured. The presence
of a few broken wires does not indicate that the rope should be immediately
renewed, as the factor of safety is usually about 10, about rather that the ropes
should be kept under careful observation during subsequent visit. It is very
difficult to quote any rule for determining when no broken wires have been
visible, and others when the rope has given long service after a comparatively
large number of wires have been broken. The decision to renew a rope rests
largely upon the engineer’s experience and is usually governed by the number
of adjacent broken wires. Undue rope stretch is another indication of
approaching rope failure.
11. Call Buttons
Call the car to each landing by pressing the landing buttons in turn and if the
lift is arranged for dual control and the inspector’s mate rides in the car during
these tests, the operation of the car call indicator and position indicator can be
observed at the same time.
12. Landing Gates or Doors
The lock of each landing gate or door, should be tested by ascertaining that it
is impossible to open any gate or door by pulling or lifting, or to stop the lift
by breaking the electric interlock circuit, unless the car is at that landing.
It should also not be possible to move the car away from any landing with the
gate or door at that landing open and if this is confirmed at each landing, then
the landing door electric interlocks are breaking contacts satisfactorily.
If gates are fitted, it is now a convenient time to note whether they can be
opened or closed readily and if not a drop of oil on each picket pin and on the
overhead supporting roller pins, unless the latter are of the ball breaking type,
will ensure easy operation. See that door hangers and tracks are clear and
adequately lubricated.
13. Car Floor Switch
Check that the car door or gate electric switch shall prevent the lift from being
started or kept in motion unless the car gates or doors are closed.
14. Car Door or Gate Electric Contact
If this switch closes and opens satisfactorily the car may be moved by the car
buttons or car switch if the door is open. The cover of the switch should be
removed occasionally and if necessary the spindles lightly oiled and the
contacts cleaned. The position of this interlock may be such, however, that it
may have to be inspected from the top of the car.
15. Car Push Buttons
Test these by brings the car to each floor in turn by pressing the appropriate
button. It should be possible to stop the motion of the car at any position in the
well by operating the stop-button. If any button is uncertain in its action, the
cover plate should be removed and the contacts cleaned and if necessary is
new spring fitted.
16. Emergency Signal
The bell, buzzer of telephone fitted in the car should be operated and should
be clearly audible outside the lift well when the car midway between adjacent
landings. In some building this signal is arranged to give warning in the
maintenance engineer’s room.
17. Lighting Fitting
Examine to see that it is securely fastened tat the illumination is adequate and
that the switch operates satisfactorily.
18. Door operating gear
Examine the motor and door operating levels clean and lubricate if necessary.
Watch the operation of the gear when the doors open and close.
19. Retiring Cam Mechanism
Operate the cam by pulling the connecting chain by hand and not if the cam
advances and retires freely. Observe whether it clears the door lock striker arm
or the sill trip level when in the retired position. The operating solenoid or
motor and levers should be examined and lubricated.
20. Governor Rope Release Carrier
Visually examine the rope grip and the springs to see that they are clean and
not rusted. This release should be tested by engaging the governor jaws
(usually in the machine room) with the governor rope by hand and then
lowering the car either by the motor hand wheel or at the slow leveling speed.
The Shackle should then pull out of its carrier and if the descent of the car is
not checked the safety gear will operate.
21. Rope Tension
If rope equalizing gear is not fitted, the rope tensions may be tested with the
car about half way between the top of the well and the counterweight. Pull
each rope in turn with a spring balance and note the deflections with equal
pulls. IF any rope can be deflected more than the others, it is not carrying its
proper share of the load and adjustments should be made at its screwed
22. Counterweight
When the car is opposite the counterweight, the counterweight shoes and
guide lubricators may be inspected in a similar manner to that adopted for the
car fittings. Examining the counterweight sections to see that none is displaced
in the frame and that the nuts and pins are in their proper positions at the ends
of the tie rods. IF 2 to 1 roping is employed see that the pulley at the top of the
counterweight is adequately lubricated. In many lifts the counterweight oil
buffers are fitted to the bottom of the counterweight and if this is the case
examining the oil level in them. Make sure that the counterweight guard at the
mid-well position is securely fixed. Inspect the counterweight safety gear as
described later for the car gear.
When moving the car slowly from the top to the bottom of the well, the guide
surfaces, joints, clips and brackets should be inspected for wear or looseness
and when the car is at the bottom landing may noticeable bend in the guides
can be detected by sighting along the face of each car and counterweight guide
24. Landing Gate or Door Locks
These should be examined periodically and if necessary the striker arms
adjusted and worn rubbers renewed. The covers should be removed the inside
of the box wiped free of cost, the mechanism lightly oiled and the contacts
cleaned, with center opening swing doors and locks are mounted on the
underside of the door top frame and these may be inspected from the landing
or the inside of the car.
25. Slowing and Stopping Switches
If slowing and stopping are performed by switches on the car and cams in the
well or vice versa it should be noted whether the switches and cams are in
proper alignment and are securely fastened. The slowing switches should
operate sufficient in advance of the stopping switches to enable the motor to
reach its slow leveling speed before the application of the brake. The normal
terminal stopping switches are frequently fitted on the car and are operated by
cams in the well, and these should receive careful attention. After inspection,
all these switches should be tested by operating the car at normal speed
between the extremes of travel.
26. Car Safety Gear
IF of the wedge type, examine the jaws for freedom from contact with the
guides and turn the drum by hand or pull the safety cable the jaws tough the
guides. Note that there is sufficient cable left on the drum so that it will not be
pulled from the drum when the safety operates. See that the levers are
adequately lubricated and that there is no excessive slack in the safety rope.
27. Car and counterweight Buffers
If these are of the special or volute spring pattern, examine to see that they fit
vertically and securely in their bases and the spring are not distorted.
With oil buffers ascertain that they have a sufficient supply of oil by
inspection of gauge provided on each and whether there is any side play in the
position. If the counterweight buffers as well as the car buffers are mounted in
the pit, they will all be the spring return type and may be partly depressed by
standing on the top of the plunger. After release, the piston should return to its
28. Governor Rope Pulley
Inspect during operation to make sure that the pulley frame is free to slide in
its guides and that the parts are adequately lubricated.
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
[EARNEST MONEY DEPOSIT]
The Executive Engineer,
Mehsana Electrical (R&B)Division,
(hereinafter called “The Seller”) has undertaken in pursuance to Tender No.
____________________________ provide certain items as there in set forth dated
Period for Validity. (Hereinafter called “The Bidder”).
And whereas, it has been stipulated in the Bid that the Seller shall furnish a
Bank Guarantee by an acceptable Bank for the sum specified there in as Earnest
Money Deposit with his obligation under the Bid.
And whereas we have agreed to give the Seller a Guarantee :
Therefore, We hereby affirm that we are Guarantors on behalf of the Seller, up
to a Total of Rs.____________/- (in words only).
and we undertake to pay Executive Engineer, Electrical (R&B) Division, Mehsana.
upon your first written demand and without argument, any sum within the limits of
Rupees ____________/- as aforesaid without your needing to prove or to show
grounds or reasons for your demand or the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the
Seller before presenting us with the demand.
The guarantee is valid until the Date up to Validity.
We undertake not to revoke the guarantee during its currency except with the
previous consent of Executive Engineer, Electrical (R&B) Division, Mehsana
We lastly undertake not to revoke the guarantee for any change in constitution
of the Bidder or the Bank.
Signature and seal of
Guarantors._____________________
BANK GUARANTEE FORM FOR SECURITY DEPOSIT
[To be stamped in accordance with Stamp Act]
KNOW ALL MEN THAT BY THESE PRESENT, We ________________
(hereinafter referred to Contractor) and We __________________________________
____________________________________a corporation incorporated under the law
having its Registered / Head Office at ________________________________ and
authorized to transact business in Indian as Security Corporation / Company
(hereinafter referred to as Surety) and held and firmly bound up to the
__________________________ Gujarat, India (hereinafter referred to as Buyer,
which expression shall include its administrator, successors and assigns in the sum
(in words & figures)
for the payment of which sum well as truly to be made, we the Principal and the
Surety to hereby firmly and irrevocably bind over selves and our successors,
executors, administrators and assigns, jointly and severally by these presents.
WHEREAS the Buyer has awarded the Contract by issue of letter of Award
same having been unequivocally accepted by the Contractor resulting into a Contract /
+ Contract bearing No. ____________________Dated _______________ (hereinafter
called as the Contract.) valued at ________________ for ____________ as described
in the Contract (Scope of Contract).
AND WHEREAS, it is a condition in the award of contract that the
Contractor with one surety shall jointly execute Contract Performance Bond for
faithful performance of the Contract in favour of the Buyer.
NOW THEREFORE, if the Contractor shall in all particulars, will, duly and
faithfully observe, perform and abide by each and every convenant, term, condition
and part of the said Contract and the conditions, specifications, drawings and other
documents attached thereto or by reference made a part thereof according to the true
intent, and meaning in each case, then the obligation under this bond shall be relieved,
otherwise, it shall remain in full force and effect and all monies to the extent of
*____________________________as aforesaid shall be payable to the Bayer
without any reservation demur and resource as irrevocable up to
[ Days / Month / Year ]
and any demand made by the Bauer shall be conclusive and binding.
PROVIDED FURTHER, that the Contractor shall immediately pay on
demand and if the Contractor fails to pay the demand or claims made by or on behalf
of the Buyer then the Surety shall pay to the Buyer the full amount of obligation under
this Bond; without any contestation, demur or protest, which demand on claims shall
be conclusive and binding on the Surety irrespective of any dispute between the
Buyer and the Contractor.
THE SURETY, for value received hereby agrees that this obligation shall
remain valid and in full effect up to ____________________________ days / month /
year i.e. ninety (90) days after the end of warranty period, specified in the Contract
No, extension of time, change or addition to or other modification of the terms of the
Contract or work to be performed there under, or of the specifications of other
Contract Document, shall in any way, after the obligation under this Bond the Surety
does hereby waive notice of any such extension of time, change, addition or
The Buyer shall have the fullest liberty, without affecting the Bond to
postpone from time to time the exercise of any powers vested in them or of any right
witch they might have against Contractor, and to exercise the same at any time in any
manner and either to enforce or any to forebear to enforce any covenants for payments
or otherwise, contained or implied, in the Contract between the Buyer and the
Contractor or any other course or remedy or security available to the Buyer and the
Surety shall not be released of its obligations under these presents by any exercise by
the Buyer of its liberty or discretion with reference to the matters aforesaid or any of
them or by reasons for time being given to the Contractor or by reason of any other
act or for bearance or other acts or omission or commission on the part of the Buyer
or any other indulgence shown by the Buyer or by any other matter or things
whatsoever which under law would but for this provision, have the effect of relieving
IN TESTIMONY WHEREOF, the Contractor has hereunto set its hand and
the Surety has caused these presents to be executed in its name and its corporate /
common seal affixed by its attorney in-fact at _____________________________
[Signature] Contractor’s Signature
[Official Address] (Designation)
Contractor’s common seal.
PERFORMANCE BOND
(The date of this Bond must not be prior to the date of the instrument in connection
with which it is given)
Principal (Contractor)
(Express in Words and Figures)
Contract No. and Date
KNOW ALL MEN BY THESE PRESENTS, THAT WE, THE PRINCIPALS AND
SURETY above named are held and firmly bound up to the ____________________
hereinafter called and Employer in the amount stated for payment of which sum ,well
and truly to be made. We bind ourselves, our heirs, executors, administrators and
successors jointly and severally, firmly by these presents subject to the provisions of
which the aforesaid Contractor on demand and without demand on a claim being
made by the Employer.
THE CONDITIONS OF THIS OBLIGATION IS SUCH, that whereas the principals
have entered into a contract with the Employer numbered and dates as shown above
and hereto attached for the execution of work ________________________________
NOW THEREFORE, if the Principal shall well and truly perform and fulfill all the
undertakings, covenants, terms, conditions and agreements of said contract during the
original terms of the said contract and any extensions thereof that may be granted by
the Employer with or without notice to the surety and during the life or any guarantee
required under the contract and shall also well and truly perform and fulfill all the
Undertakings, covenants, terms, conditions and agreements of any all duly and unduly
authorized modifications of said contract that may hereafter be made, notice of which
modifications to the surety being hereby waived or shall pay over, make good and
reimburse to the Employer all loss and damages which the employer may sustain by
reason of failure or default on the part of said Principal so to do.
We _____________________________________ further agree that the guarantee
herein contained shall remain in full force and effect during the period that would be
taken for the validity of the said contract, and that it shall continue to be enforceable
till all the dues of the employer under or by virtue of the contract have been fully paid
and its claims satisfied or discharged or till the employer certifies that the terms and
conditions of the contract have been fully and properly carried out by the said
contractor and accordingly discharges the guarantee. Unless a demand or claim under
this guarantee is made on us in writing on or before the ________________________
We shall be discharged from all liability under this guarantee thereafter.
IN WITNESS WHEREOF, the above bounded parties have executed this instrument
under their several seals on the date indicated above the name and corporate seal of
each corporate partly being hereto affixed and these presents duly signed by its
undersigned representatives, pursuant to authority of its governing body.
In the presence of witness
Principal Individual
by _________________________________ offices Corporate Seal
Attested Corporate Surety
Business Address ________________________
For and on behalf of the Employer
MODEL FROM OF WARRANTY CLAUSE
The contractors / seller hereby declares that the goods / store / articles sold to
the buyer under this contract shall be of the best quality ( and workmanship ) and shall
be strictly in accordance with the specifications and particulars contained / mentioned
in the clause hereof and the contractor / seller hereby guarantees that the said goods /
stores / articles would continue to conform to :-
Description and quality aforesaid for a period of 12 months from the date of
commissioned and issue of acceptance certificate to the purchaser and that
notwithstanding the fact that by the purchaser ( Inspector ) may have inspected and /
or approved the said goods / stores / articles, if during the aforesaid period of Twelve
months the said goods / stores / articles be discovered and to conform to the
description and quality aforesaid or have deterioration and the decision of the
Purchaser in that behalf will be final and conclusive ) and Purchaser will be entitled to
reject the said goods / stores / articles or such portion thereof as may be discovered
not to conform to the said description and quality. On such rejection the goods / stores
/ articles will be at the seller’s risk and all the provisions herein contained relating to
rejection of goods, etc. shall apply. The contractor / seller shall, if so called upon to
do, replace the goods, etc. or such portion thereof as is rejected by the purchaser
otherwise the contractor / seller shall pay to the Purchaser such damages as may arise
by reason of the breach of the condition herein contained. Nothing herein contained
shall prejudice any other right of the purchaser in that behalf under this contract or
Signature of Contractor’s Dy. Executive Engineer Executive Engineer
Electrical( R & B ) sub. Div., Mehsana Elect. (R & B) Div
Mahesana. Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
002 Tender Document And Technical Bid.pdf
G S T LTR.pdf
GR.pdf
Jotana Court Lift Estimate With DTP.pdf
NIT -06 2026-27.pdf
Tharav AMC ELECTRICAL NORMS GR DATE 17-09-2026.pdf
STANDARD BIDDING DOCUMENTS.pdf
001 Prequalification Bid.doc-2.pdf
PQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .