| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L2₹69.2 L+₹28,000 (0.41%)Rejected-Finance SPECIAL 1 INDUSTRIAL ESTATE NEW POWER HOUSE ROAD JODHPUR 342003 | JODHPUR | RAJASTHAN | 342003 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹80.4 L+₹11.5 L (16.7%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹1.1 Cr+₹41.6 L (60.3%)Rejected-Finance | L4 | Rejected-Finance Other than lowest bidder |
Tender Value
₹48.9 L
EMD Value
₹98,000
Closing Date
28 May 2022, 6:00 pmClosed
HQ CEJZ Jodhpur
HQ Chief Engineer Jodhpur Zone Jodhpur
COMPLETION OF INCOMPLETE WORK FOR PROVISION OF SEWAGE TREATMENT PLANT BASED ON MOVING BED BIO REACTOR (MBBR) TECHNOLOGY AT BANAR
2022_MES_507575_2
800568/BNR/E8
Open Tender
Civil Works
Lump-sum
180 days
BANAR
As per tender documents
8 documents required · 8 mandatory
₹500
GE Banar
₹98,000
Yes
24 Jun 2022
26 Apr 2022
30 May 2022
26 Apr 2022
28 May 2022
14 May 2022
Amount
Lump sum price worked out by the contractor for "EXCAVATION AND EARTHWORK" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from SI page No. 18
Lump sum price worked out by the contractor for "AREA DRAINAGE" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES B/F from SI page No. 19
PROVISIONAL LUMP SUM This sum shall be expended wholly or in part as directed by the GE and the work shall be carried out to the extent ordered in writing by the GE. The work under provisional lump sum shall be measured and paid for at the applicable (or prorata) rate in MES schedule adjusted by the percentage quoted by the contractor here-in-below:-
(A) Provide:- Provisional lump sum for Hydrant post for water lorry filling with civil & plumbing work (02 Nos)
(B) Provide:- Provisional lump sum for ISMB 200 (Appox 4mtr long) 02 ton capacity chain block pully arrangement including fixing arrangement of ISMB with RCC columns (01 No)
Sch 'A' PART-III (MISCELLANEOUS ITEMS) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only.
(a) Round the clock manning and operation of sewage treatment plant including all components and items in the premises of STP viz DG sets, Panels, Valves and other measuring and control devices etc including additives, consumables as required for running of plant but excluding diesel and electricity complete all as directed by Engineer-in-charge. from the date of commissioning of the plant to one year after physical completion of work (i.e expiry of defect liability period)
(b) Description all as per item No 4.01 above but including maintenance together with repair and replacement of pumps, pipes etc for the period commencing from one year after DLP till next one year.
(c) Description all as per item No 4.01 (b) above but for the period commencing from two year after DLP till next one year.
NOTE FOR ITEM NO 4.01,4.02 & 4.03 ABOVE :- (a) Following minimum staff shall be provided by the contractor at the site:- (i) 1 operator in each shift of 08 hours (3 shift per day) (Total 3 operator per day). The operator shall be ITI qualified in relevant trade with 2-3 yrs experience. (ii) 1 helper cum sweeper in each shift of 8 hours (Total 2 helper per day). (b) Fortnightly testing of treated sewage shall be carried out by the contractor for the parameters as given below ie NABL acrediated laboratory from authorized lab which shall be submitted along with each RAR. NOTES:-The inlet sewage/ raw sewage characteristics is likely to be as mentioned below and may very time to time with acceptable tolerance limits:- (i) BOD - 200 to 275 mg/ltr (ii) COD - 550 to 600 mg/ltr (iii) TSS - 350 to 450 mg/ltr (iv) PH - 06 - 09 (v) Oil & Grease - 20 mg/ltr (vi) Coliform - 10^6 - 10^7 MPN/100ml (c) All consumables media and additives including hypo solution shall be provided by the contractor except power, diesel and water which same shall be provided by the department free of cost. (d) Plant surroundings shall be kept neat & clean by the contractor. (e) Contractor shall operate & maintain the plant as per the instruction in the operation manual & shall carry out routine. Annual & Breakdown maintenance of the equipment in the system including daily, weekly, monthly, quarterly, half yearly and yearly preventive maintenance. (f) Contractor shall maintain the record of attendance for his workmen and his staff. (g) Contractor shall dispose off all sludge to the area specified by engineer-in-charge within range of 2 km of STP site. (h) Contractor shall maintain all electrical installations provided under this contract as per IE rules/Standard Engineering Practice. (j) The cost of all consumables (except electricity and diesel) like chlorine gas, media and additives, cost of monthly chemical consumption for STP laboratory etc shall be deemed to be included in the unit rate quoted.
INDO CONSTRUCTION
POOJA CONSTRUCTION
Surendra Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .