| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance GOPAL SINGH | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹23.8 L
EMD Value
₹57,000
Closing Date
19 Jan 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer PD PWD Ranikhet
Reconstruction and Repair of Damaged Walls and Scupper in km 42, 59, 60, 71 of Khairna Ranikhet Ramnagar Mohan Motor Road(SH-14)
2024_pwd_67196_1
4703(1)/7AC Dated 26/12/2023
Open Tender
Civil Works
Item Rate
60 days
Ranikhet/Sult
As per technical bid
2 documents required · 2 mandatory
₹4,720
EE PD PWD Ranikhet
₹57,000
19 Jan 2024
4 Jan 2024
19 Jan 2024
5 Jan 2024
19 Jan 2024
12 Jan 2024
Amount
Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment.
Excavation in foundation for retaining, breast walls etc. in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD
Construction of Scupper At Km-42
Construction of R/Wall At Km-59, 60 and 71
Construction of R/Wall At Km-74
Random Rubble Stone Masonry laid Dry in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royalties etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Construction of Scupper At Km-42
Construction of R/Wall At Km-59, 60 and 71
Construction of R/Wall At Km-74
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royalties etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Construction of Scupper At Km-42
Construction of R/Wall At Km-59, 60 and 71
Construction of R/Wall At Km-74
Hand Packed stone filling in back of walls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Construction of Scupper At Km-42
Construction of R/Wall At Km-59, 60 and 71
Construction of R/Wall At Km-74
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. As per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
Construction of Scupper At Km-42
Construction of R/Wall At Km-59, 60 and 71
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 M10 (C.C 1:3:6) including supply of all materials, labour and T&P etc. (Normal mix)
Construction of Scupper At Km-42
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204-Random rubble masonry -In cement mortar (1:5)
Construction of Scupper At Km-42
Providing Nominal mix 1:2:4 (Normal mix) Cement concrete with cement, sand & 20mm gauge stone ballast 53 mm size including supply of all materials labour, T&P and royaltiies etc. required for proper completion of the work.
Construction of Scupper At Km-42
Supplying, fitting and placing HYSD bar reinforcement (Fe tonne 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The reinforcement steel shall be as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6).
Construction of Scupper At Km-42
Providing and laying reinforced Cement concrete grade M25 in Sub structure Nominal mix including supply of all material, labour, T&P etc. required for proper completion work
Construction of Scupper At Km-42
M/S M B CONSTRUCTION
stage.html
html • 0.03 MB
finance_80969.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .