Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 LRejected-AOC | ₹2.0 L | L2 | Rejected-AOC L2 |
Tender Value
₹1.9 L
EMD Value
₹4,765
Closing Date
27 Jan 2026, 11:00 amClosed
SUMA P B
CIP SUBDIVISION, CHEERAKUZHY
GENERAL-CSM 2025-26-Urgent repair of LBMC and strengthening and preventing leakages of aqueduct at ch 19/500km-General Civil Work
2025_Irrig_824758_2
IRR/IA/TR/2449/2025_5_8_7/1
Open Tender
Civil Works - Canal
270 days
Cheerakuzhy
Please refer tender documents
8 documents required · 8 mandatory
₹555
Yes
₹4,765
Yes
18 Feb 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
19 Jan 2026 - 27 Jan 2026
Repairing of aqueduct
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
Please Enable Macros to View BoQ information
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1390793.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
fot.pdf
Tender Documents • 0.25 MB
ipact.pdf
Tender Documents • 0.23 MB
affidavit.pdf
Tender Documents • 0.24 MB
BOQ_1390793.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 3.57 MB
viewnit.pdf
Tender Documents • 0.03 MB
preliminaryagreement.pdf
Tender Documents • 0.18 MB
epayment.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid