| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 LRejected-AOC | ₹7.1 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical 3 178 KERALA INDIA | PALAKKAD | KERALA | 678001 | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | MAMMED K T C L2 | ASRAF A L1 | Rasheed L3 |
|---|---|---|---|---|---|---|
| 1.00Retaining Wall | ||||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 84.46 | cum | 55.6 ₹4,695.75 | 53.1 ₹4,484.61 | 57.97 ₹4,895.91 |
| 1.00 | 3.8.2:Excavation in Ordinary Rock with Dozer with lead upto 100 m <br> Excavation for roadway in ordinary rock by deploying a dozer D-50 including cutting and pushing the cut earth to site of embankment upto a distance of 100 m (average lead 50 m), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross-sections with lift upto 1.5 m. | 126.68 | cum | 70.8 ₹8,969.23 | 67.6 ₹8,563.84 | 73.85 ₹9,355.61 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 | 3.04 | cum | 6,982 ₹21,197.35 | 6,668.6 ₹20,245.87 | 7,285.77 ₹22,119.60 |
| 1.00 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20 | 36.16 | cum | 8,111.3 ₹2.9 L | 7,747.3 ₹2.8 L | 8,464.23 ₹3.1 L |
| 1.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 4.51 | tonne | 78,283.6 ₹3.5 L | 74,770.1 ₹3.4 L | 81,689.44 ₹3.7 L |
| 1.01 | OD494996/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg
/sq.cm including cost of materials, conveyance, labour charges etc. complete | 15 | 1 meter | 99.3 ₹1,489.50 | 94.8 ₹1,422 | 103.59 ₹1,553.85 |
| 1.01 | OD500659/2025-2026:. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 124.2 | cum | 257.3 ₹31,956.66 | 245.8 ₹30,528.36 | 268.53 ₹33,351.43 |
Tender Value
₹8.5 L
EMD Value
₹21,157
Closing Date
14 Mar 2026, 12:00 pmClosed
Assistant Engineer LID EW Section Kodiyathoor GP
Assistant Engineer LID EW Section Kodiyathoor GP
A n n u a l P l a n - P R O J E C T N O 3 5 5 / 2 6 KODIYATHUR G.P- construction of Molipara SC smashanam road and side wall-General Civil Work
2026_LSGD_844709_2
AE-LID EW-KDR-07-2026
Open Tender
Civil Works - Roads
Assistant Engineer LID EW Section Kodiyathoor GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
Yes
₹21,157
Yes
3 Jun 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
14 Mar 2026
6 Mar 2026
Retaining Wall
3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
3.8.2:Excavation in Ordinary Rock with Dozer with lead upto 100 m <br> Excavation for roadway in ordinary rock by deploying a dozer D-50 including cutting and pushing the cut earth to site of embankment upto a distance of 100 m (average lead 50 m), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross-sections with lift upto 1.5 m.
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
OD494996/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete
OD500659/2025-2026:. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Please Enable Macros to View BoQ information
Item Rate BoQ
BoQ_Ver3.0
Work Name:Annual Plan-PROJECT NO:355/26 KODIYATHUR G.P- construction of Molipara SC smashanam road and side wall-General Civil Work
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Retaining Wall
3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
3.8.2:Excavation in Ordinary Rock with Dozer with lead upto 100 m <br> Excavation for roadway in ordinary rock by deploying a dozer D-50 including cutting and pushing the cut earth to site of embankment upto a distance of 100 m (average lead 50 m), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross-sections with lift upto 1.5 m.
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
OD494996/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete
OD500659/2025-2026:. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1426228.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_1426228.xls
BOQ • 0.30 MB
BOQSC.xls
Tender Documents • 0.30 MB
DOCUMENTS.rar
Additional Documents • 0.94 MB
Download all tender documents and submit your bid